States - Tenders Closing for a specific Date

Report For Day : 29-Apr-2021

Total Tenders : 2786
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
11. 20-Apr-2021 05:30 PM 29-Apr-2021 09:00 AM 30-Apr-2021 12:00 PM CONSTRUCTING ANGANWADI TO BHAGVAN HOUSE ROAD AT/WANEWADI/2021-22/01/2021_RDPUN_677695_1 Maharashtra
12. 22-Apr-2021 11:30 AM 29-Apr-2021 09:00 AM 29-Apr-2021 11:00 AM Periodical maintenance on Rahi to Dadwas Road km 0/000 to 17/000 for the year 2021-22 SH Providing and laying 30mm thick bituminous concrete single layer V Shaped drain in km 0/000 to 2/000/No.PW.SRJ/TA/Pub/2021-23752-53 dated 16.03.2021/2021_PWD_46769_2 Himachal Pradesh --
13. 06-Apr-2021 12:15 PM 29-Apr-2021 09:00 AM 29-Apr-2021 11:00 AM As per DNIT/01/SE/DS/FZR/2021-22/2021_POWER_63314_1 Punjab
14. 23-Apr-2021 09:00 AM 29-Apr-2021 09:00 AM 30-Apr-2021 09:00 AM Construction Of C C Road For Smashan Bhumi AT Loni Under Jansuvidha Programme/2021_Loni_01/2021_AURAN_678371_1 Maharashtra --
15. 22-Apr-2021 02:00 PM 29-Apr-2021 09:00 AM 07-May-2021 12:00 PM Construction of Anganwari center at village Jhundpur Block Rai Distt. Sonipat Cost 8.25 Lakhs/2082 dt 20.04.2021/2021_HRY_169636_1 Haryana
16. 23-Apr-2021 05:50 PM 29-Apr-2021 09:00 AM 30-Apr-2021 09:00 AM Repairs to Magaswargiya Wasti Road at Sinagikhamba/GpSingikhamba/15Fc/02/2021_HINGO_678760_1 Maharashtra --
17. 05-Apr-2021 05:25 PM 29-Apr-2021 09:00 AM 29-Apr-2021 11:00 AM ELECTRICAL WORKS THROUGH LABOUR OUTSOURCING/SE/DS/BTI/2021-22/2021_POWER_63282_1 Punjab
18. 06-Apr-2021 12:00 PM 29-Apr-2021 09:00 AM 29-Apr-2021 11:00 AM Erection of 11 KV and LT lines, Installation of Distb T/f, HT and LT Capacitors, likely to be executed during 2021-22 on labour rates as per PSPCL under DS Circle Sri Muktsar Sahib (Divn. Sri Muktsar Sahib, Malout, Gidderbaha, Abohar,Fazilka, Badal)/01/SE/MKS/2021-22/2021_POWER_63279_1 Punjab
19. 23-Apr-2021 06:00 PM 29-Apr-2021 09:00 AM 29-Apr-2021 12:00 PM Constrcution of Cement Road At Rui (wai) Tq. Dist Yavatmal/NIT/RUI/2021_YAVAT_678761_1 Maharashtra
20. 06-Apr-2021 10:00 AM 29-Apr-2021 09:00 AM 29-Apr-2021 11:00 AM Erection of 11 KV nd LT lines, Installation of Distribution Transformers, HT,LT Capacitors, MCBs Meter Pillar Boxes nd Allied works including erection work of Domestic, NRS, Industrial , Tube well nd other connection as per approved PSPCL drawings/01/SE/FDK/2021-22/2021_POWER_63310_1 Punjab