Central - Tenders Closing for a specific Date

Report For Day : 13-Nov-2025

Total Tenders : 2057
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
1801. 07-Nov-2025 03:46 PM 13-Nov-2025 05:00 PM 13-Nov-2025 05:30 PM 10(1)/NIQ/EE(E)/APED/2025-26/302/10(1)/NIQ/EE(E)/APED/2025-26/302/132354 Central Public Works Department (CPWD) --
1802. 06-Nov-2025 04:36 PM 13-Nov-2025 05:00 PM 13-Nov-2025 05:30 PM 59/AE(E)/Ranchi-I/2025/380/59/AE(E)/Ranchi-I/2025/380/132227 Central Public Works Department (CPWD) --
1803. 29-Oct-2025 10:00 AM 13-Nov-2025 05:00 PM 15-Nov-2025 11:00 AM Providing fixing and commissioning of ESE type Advance Lightning Protection System at different locations of Damini UG and Bangwar UG of ABD sub area of Sohagpur Area/SECL/SGP/EnM/eT/25-26/354 Date 27.10.2025/2025_SECL_346301_1 South Eastern Coalfields Limited --
1804. 01-Nov-2025 01:00 PM 13-Nov-2025 05:00 PM 15-Nov-2025 10:00 AM Stone and Coal cutting during establishing endless haulage along 17L and 14L in B.P.Seam at Badjna Colliery./ECL/GM/MA/SRV/ 25-26/1310/E-24 Dt.28.10.2025/2025_ECL_346418_1 Eastern Coalfields Limited --
1805. 01-Nov-2025 01:00 PM 13-Nov-2025 05:00 PM 15-Nov-2025 10:00 AM Construction of PCC Steps along travelling drift from Kalimati top section to Kalimati Bottom section under Kumardhubi Colliery./ECL/GM/MA/SRV/ 25-26/1303/E-25 Dt. 28.10.2025/2025_ECL_346427_1 Eastern Coalfields Limited --
1806. 01-Nov-2025 01:00 PM 13-Nov-2025 05:00 PM 15-Nov-2025 10:00 AM Illegal filling of ratholes and exposed seam sections by engagement of mechanical excavator at Nirsa OCP./ECL/GM/MA/ SRV/ 25-26/ 1308/ E-26 Dt.28.10.2025/2025_ECL_346431_1 Eastern Coalfields Limited --
1807. 01-Nov-2025 01:00 PM 13-Nov-2025 05:00 PM 15-Nov-2025 10:00 AM Dewatering of B.P Seam at Badjna Colliery./ECL/GM/MA/ SRV/ 25-26/ 1312/ E-27 Dt. 28.10.2025/2025_ECL_346434_1 Eastern Coalfields Limited --
1808. 16-Oct-2025 05:00 PM 13-Nov-2025 05:00 PM 14-Nov-2025 05:00 PM Repair of M/s Elliot Ebara Turbomachinery India Pvt Ltd make turbine rotor (Tag No. 010-PT-025A) of AVU Unit of Paradip Refinery./9070C25C55/2025_PDR_187192_1 IndianOil icon image
1809. 01-Nov-2025 01:00 PM 13-Nov-2025 05:00 PM 15-Nov-2025 10:00 AM Drilling of 18 nos nx size non-coring Borehole for ascertain the actual parting between Kalimati Top and Kalimati Bottom Section of Kumardhubi Colliery./ECL/GM/MA/ SRV/ 25-26/ 1183/ E-28 Dt.28.10.2025/2025_ECL_346435_1 Eastern Coalfields Limited --
1810. 01-Nov-2025 01:00 PM 13-Nov-2025 05:00 PM 15-Nov-2025 10:00 AM Making of pucca drain by brick working beside the DB Road towards west side existing Chapapur-II OC hired patch in monsoon preparation at Chapapur-II Colliery./ECL/GM/MA/ SRV/ 25-26/ 1309/ E-29 Dt.28.10.2025/2025_ECL_346436_1 Eastern Coalfields Limited --

Note : For more details and clarifications, please refer to the respective Portal.