Central - Tenders Closing for a specific Date

Report For Day : 21-Nov-2025

Total Tenders : 1441
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
31. 10-Nov-2025 03:30 PM 21-Nov-2025 10:00 AM 21-Nov-2025 04:30 PM Package A and Package B for Mechanical and Balance Mech works of FGD at NTPC Barh Stage I and Stage II/BHEL/CPC/BAR/FGD/26/053/2025_BHEL_53985_1 Bharat Heavy Electricals Limited --
32. 12-Nov-2025 09:00 AM 21-Nov-2025 10:00 AM 21-Nov-2025 10:15 AM Supply and Installation of Parts for Water Filter Assembly Model LabAqua of Lab Link company/CWC/03/2025-26/MD/GNR/2025_CWC_818605_1 Central Water Commission --
33. 06-Nov-2025 01:00 PM 21-Nov-2025 10:00 AM 24-Nov-2025 10:00 AM Comprehensive maintenance and electrical works of Type-II quarters at New Jheel Road Estate at Gun and Shell Factory, Cossipore, Kolkata-700002./GSF/ND2501/EO (C)/Type-II/2025_DoDP_818031_1 Department of Defence Production --
34. 08-Nov-2025 09:00 AM 21-Nov-2025 10:00 AM 22-Nov-2025 10:00 AM Testing and calibration of protective relays, CTs, PTs along with testing of transformers installed in substations of Bina Project/B/EM/eTender/2025-26/49 Dt. 07.11.2025/2025_NCL_346946_1 Northern Coalfields Limited --
35. 07-Nov-2025 04:01 PM 21-Nov-2025 10:30 AM 21-Nov-2025 10:30 AM RIFAXIMIN 400 MG TAB/11251084/106877876 Ministry of Railways --
36. 03-Nov-2025 04:45 PM 21-Nov-2025 10:30 AM 21-Nov-2025 10:30 AM GI Bend and clamp/90257550/106873252 Ministry of Railways --
37. 04-Nov-2025 02:42 PM 21-Nov-2025 10:30 AM 21-Nov-2025 10:30 AM Set of compensating plate/26252760/106871614 Ministry of Railways --
38. 06-Nov-2025 05:00 PM 21-Nov-2025 10:30 AM 22-Nov-2025 11:00 AM Contract for piping , Modification of piping works and other connected Mechanical works in various plants/IREL/Udyogamandal/25-26/36454/2025_IREL_254598_1 IREL (INDIA) Limited --
39. 08-Nov-2025 09:14 PM 21-Nov-2025 10:30 AM 21-Nov-2025 10:30 AM 1) TWIN TOWER AIR DRYER WITH PRE-COOLESCER & FINAL FILTER FOR WAG-9HC/WAP-7 AS PER RDSO SPEC No. M.P.-0.01.00.06 (REV 06) MARCH 2021. 2) TWIN TOWER AIR DRYER WITH PRE-COOLESCER & FINAL FILTER FOR WAG-9HC/WAP-7 AS PER RDSO SPEC No. M.P.-0.01.00.06 (REV 06) MARCH 2021./L1255392/106878796 Ministry of Railways --
40. 04-Nov-2025 02:44 PM 21-Nov-2025 10:30 AM 21-Nov-2025 10:30 AM SET OF HARDWARE FOR WAG9/WAP7 LOCOS SUSPENSION TUBES/26253714/106871609 Ministry of Railways --

Note : For more details and clarifications, please refer to the respective Portal.