1. |
10-Sep-2025 10:00 AM |
15-Sep-2025 10:30 AM |
16-Sep-2025 11:00 AM |
[Repair and Maintenance of defective DG Sets installed at BOP Pakhuria and fixing of existing battery charger at BOP Bornberia of 194 Bn BSF under SHQ BSF Krishnanagar]
[32/SHQKNR/AE(E)/NIT/2025-26][2025_BSF_876686_1]
|
DG,BSF,MHA||South Bengal(Kolkata),BSF,MHA
|
2. |
29-Aug-2025 04:30 PM |
15-Sep-2025 10:30 AM |
15-Sep-2025 12:30 PM |
[AN 86116 ID FD TURBINE SPARES]
[AN 86116 ID FD TURBINE SPARES][2025_RCFL_875247_1]
|
Rashtriya Chemicals and Fertilizers Ltd.||IT,RCFLTD,MCF
|
3. |
10-Sep-2025 10:00 AM |
15-Sep-2025 10:30 AM |
16-Sep-2025 11:00 AM |
[Providing and installation of 1.5 Ton split type air conditioner in non residential buildings at BSF campus Simultala under SHQ BSF Krishnanagar]
[31/SHQKNR/AE(E)/NIT/2025-26][2025_BSF_876683_1]
|
DG,BSF,MHA||South Bengal(Kolkata),BSF,MHA
|
4. |
04-Sep-2025 12:10 PM |
15-Sep-2025 10:30 AM |
17-Sep-2025 11:00 AM |
[Repair and maintenance of BOPs bulding ie BOP Rangichera fwd Lakhnacheri bogaichera Adm Base Rakesh Joshiteela krishnateela Sukhraibari Karangichera Asharambari Chamubasti Banbazar Tulsirambari Gumasumbasti Charguriya Bachaibari Barabogai Sin]
[02/AE(Elect)/SHQ-TLM/2025-26][2025_BSF_875990_1]
|
DG,BSF,MHA||Tripura FTR(Agartala),BSF,MHA
|
5. |
23-Aug-2025 10:00 AM |
15-Sep-2025 10:30 AM |
16-Sep-2025 11:00 AM |
[Terms contract for water supply at Sect HQ]
[8023/13/E8/2025][2025_ARMHA_874451_1]
|
Assam Rifles - MHA||Engineer Branch - AR - MHA
|
6. |
23-Aug-2025 03:00 PM |
15-Sep-2025 10:30 AM |
16-Sep-2025 11:00 AM |
[Terms contract for artificers work in Single JCOs Resdl Bldg at Sect HQ]
[8023/10/E8/2025][2025_ARMHA_874489_1]
|
Assam Rifles - MHA||Engineer Branch - AR - MHA
|
7. |
10-Sep-2025 10:00 AM |
15-Sep-2025 10:30 AM |
16-Sep-2025 11:00 AM |
[Repair and maintenance of rewsidential Qtrs and providing and fixing street light poles at dark patches in Simultala BSF campus under SHQ BSF Krishnanagar]
[30/SHQKNR/AE(E)/NIT/2025-26][2025_BSF_876681_1]
|
DG,BSF,MHA||South Bengal(Kolkata),BSF,MHA
|
8. |
04-Sep-2025 01:00 PM |
15-Sep-2025 10:30 AM |
17-Sep-2025 11:00 AM |
[DEVELOPMENT OF AREA IN FRONT OF OFFICERS MESS AND GATE NO 1 AT BSF CAMPUS KHASIAMANGAL TELIAMURA UNDER SHQ BSF TELIAMURA SH PROVIDING AND FIXING OF HOLLOW LOGO LETTER/ALPHABET]
[03/AE(Elect)/SHQ-TLM/2025-26][2025_BSF_876029_1]
|
DG,BSF,MHA||Tripura FTR(Agartala),BSF,MHA
|
9. |
18-Aug-2025 10:55 AM |
15-Sep-2025 11:00 AM |
16-Sep-2025 11:30 AM |
[Ultra Compact Pore Pressure Gauges]
[NITW/PS-36/G/2277/2025/UC Pore Pressure Gauges/CED][2025_NITW_873573_1]
|
National Institute of Technology Warangal||Purchase and Stores Section - NIT Warangal
|
10. |
26-Aug-2025 06:30 PM |
15-Sep-2025 11:00 AM |
16-Sep-2025 11:30 AM |
[Design, supply, installation, testing, commissioning of 70 KWp roof top Grid tied Solar Power Plant and 10 KWp Grid tied Solar Tree at PTC Guwahati.]
[87/EE/PED/KOL/NIT/2025-26][2025_DOP_874820_1]
|
Department of Posts||West Bengal Circle,Dept. of Posts||CPMG,WB Circle,Kolkata,POST||EE(Electrical),PED,Kolkata,POST
|