1. |
20-Jun-2025 05:45 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:30 PM |
[MALDI-TOF System]
[TMH/MUZ/2025-2026/CPU/EO/0004][2025_TMC_865568_1]
|
Tata Memorial Centre||Tata Memorial Hospital Mumbai
|
2. |
13-Jun-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[LAYING OF ETP DISCHARGE PIPELINE AT PARADIP]
[MK/B302-000-MK-T-9524/1032][2025_EIL_860990_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG
|
3. |
13-Jun-2025 09:30 AM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[i) Boring of 02 nos deep tube well with submerible pump (ii) C/O 02 nos water harvesting ground water recharge (iii) C/O RCC drain covers (length 500 mtr) for open storm water drain at 205 CoBRA Bn, CRPF, Bihar]
[B.V(205 CoBRA Bn.) Spl. Repair/2025-26-CZ-C/Cell (NIT-37)][2025_CRPF_864366_1]
|
DG,CRPF,MHA||Central Zone,CRPF,MHA||Central Zone HQRS,CRPF,MHA
|
4. |
26-Jun-2025 12:50 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Provn of roof replacement of existing 02 x Single JCOs accns Bldg Nos T0905G T7510B and JCOs Club Bldg No T1704 of Bn HQ of 31 Assam Rifles at Changlang]
[VIII.11013/Engr/MW/2025-26/09][2025_ARMHA_866236_1]
|
Assam Rifles - MHA
|
5. |
13-Jun-2025 01:30 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[(i) Balance Work of parade ground (ii) Balance work of external development (iii) Emergent work of construction of RCC protection wall near drain at lower campus at GC CPF, Kathgodam]
[B.V(GC Kathgodam) Spl. Repair/2025-26-CZ-C/Cell (NIT-36) ][2025_CRPF_864348_1]
|
DG,CRPF,MHA||Central Zone,CRPF,MHA||Central Zone HQRS,CRPF,MHA
|
6. |
26-Jun-2025 11:15 AM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Provn of roof replacement existing 02 OR living bk Bldg No T0105C T6510B of Bn HQ of 31 Assam Rifles at Changlang ]
[VIII.11013/Engr/MW/2025-26/08][2025_ARMHA_866210_1]
|
Assam Rifles - MHA
|
7. |
26-Jun-2025 01:15 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Provn of repair of floor of existing accns Bldg Nos T8411B T8311A T8311B T8411C T8411E of COB Khimyong of 31 Assam Rifles]
[VIII.11013/Engr/MW/2025-26/10][2025_ARMHA_866250_1]
|
Assam Rifles - MHA
|
8. |
20-May-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[JP/B957-500-MB-T-6600/1017 - SPHERE PACKAGE OF BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)]
[JP/B957-500-MB-T-6600/1017][2025_EIL_860788_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG
|
9. |
27-Mar-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[SELECTION OF PMIS SOLUTION AND SI FOR IMPLEMENTATION IN EIL]
[SELECTION OF PMIS SOLUTION AND SI FOR IMPLEMENTATION IN EIL ][2025_EIL_852922_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG
|
10. |
27-Jun-2025 09:30 AM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Repair of shelves, racks, almirah, granite and tile work of 405 Men barrack No. 01 and 02 at RTC CRPF, Rajgir, Bihar]
[B-V(RTC Rajgir)/2025-26-CZ-C/Cell (TE-12) ][2025_CRPF_866228_1]
|
DG,CRPF,MHA||Central Zone,CRPF,MHA||Central Zone HQRS,CRPF,MHA
|