1. |
12-Apr-2024 03:00 PM |
19-Apr-2024 03:00 PM |
22-Apr-2024 03:00 PM |
[Multiaxial-Multilayer Carbon 3D Weaving Machine]
[IITD/BTXT(SP-4607)/2024][2024_IIT_803743_1]
|
Director-Indian Institute of Technology(IIT Delhi)||Dy.Registrar(Stores) Central Store Purchase Section-IIT Delhi
|
2. |
16-Mar-2024 06:40 PM |
19-Apr-2024 03:00 PM |
22-Apr-2024 03:00 PM |
[DOUBLE ACTING STROKE HYDRAULIC JACK]
[Pur-1/35_23-24 DOUBLE ACTING STROKE HYDRAULIC JACK][2024_DHI_801321_1]
|
Department of Heavy Industry||NEPA Limited-MHIPE
|
3. |
22-Mar-2024 03:00 PM |
19-Apr-2024 03:00 PM |
22-Apr-2024 03:00 PM |
[Supply of VALVE BUTTERFLY (TRIPLE OFFSET) for MSB,PFCC,GDS Unit FOR NREP]
[TK-1ZZZA-MP-RFQ-0134][2024_NRL_801829_1]
|
Numaligarh Refinery Limited
|
4. |
22-Mar-2024 03:00 PM |
19-Apr-2024 03:00 PM |
22-Apr-2024 03:00 PM |
[Supply of following PANEL MOUNTED SAMPLING SYSTEM FOR MSB GDS and PFCC UNIT FOR NREP as per Technical Specifications for Numaligarh Refinery Limited, Assam, INDIA. ]
[TK-1ZZZA-MP-RFQ-0100][2024_NRL_799829_1]
|
Numaligarh Refinery Limited
|
5. |
26-Mar-2024 09:00 AM |
19-Apr-2024 03:00 PM |
20-Apr-2024 03:30 PM |
[CONSTRUCTION OF DRY TOILET AT CHUMAR POST OF 37TH BN ITBP LEH]
[NO/ITBP/37BN/ENGR/DRY TOILE CHUMAR/209/2022/23-8054-65][2024_ITBP_802110_1]
|
DG, Indo-Tibetan Border Police Force||IG, NORTH WESTERN FTR,ITBP
|
6. |
26-Mar-2024 06:30 PM |
19-Apr-2024 03:00 PM |
24-Apr-2024 03:30 PM |
[Miscellaneous Civil and maintenance works at BARC, Hanle, Leh Ladakh.]
[BARC/CED/ET/97/2023-2024 Dated 22.03.2024][2024_BARC_802193_1]
|
Bhabha Atomic Research Centre||Bhabha Atomic Research Centre Mumbai||Civil Engineering Division
|
7. |
28-Mar-2024 06:30 PM |
19-Apr-2024 03:00 PM |
22-Apr-2024 03:00 PM |
[ANNUAL MAINTENANCE CONTRACT OF ATLAS CAPCO COMPRESSED AIR SYSTEM]
[ANNUAL MAINTENANCE CONTRACT OF ATLAS CAPCO COMPRESSED AIR SYSTEM][2024_DHI_802549_1]
|
Department of Heavy Industry||NEPA Limited-MHIPE
|
8. |
10-Apr-2024 06:00 PM |
19-Apr-2024 03:00 PM |
20-Apr-2024 03:30 PM |
[Supply and installation of curtain rods]
[01/IISERT/ENGG/2024-25][2024_ISRTP_803634_1]
|
Indian Institute of Science Education and Research - Tirupati
|
9. |
12-Apr-2024 02:30 PM |
19-Apr-2024 03:00 PM |
22-Apr-2024 03:30 PM |
[Renovation of Electrical works with decorative fittings including existing cabling work rearrangement at Ground floor corridor ,Yogayog Bhawan,Kolkata]
[1/EE/PED/KOL/NIT/2024-25][2024_DOP_803749_1]
|
Department of Posts||West Bengal Circle,Dept. of Posts||CPMG,WB Circle,Kolkata,POST||EE(Electrical),PED,Kolkata,POST
|
10. |
16-Mar-2024 09:00 AM |
19-Apr-2024 03:00 PM |
20-Apr-2024 03:00 PM |
[Programme Management Unit under SBM G of DDWS]
[S-18020/32/2020-SBM-DDWS][2024_MDWS_801125_1]
|
Ministry of Drinking Water and Sanitation||Water- MDWS
|