1. |
20-Mar-2024 03:00 PM |
06-May-2024 10:55 AM |
07-May-2024 11:00 AM |
[VIII.11014/8370/28 Sect/32 COB/Engr-2024/01]
[VIII.11014/8370/28 Sect/32 COB/Engr-2024/01][2024_ARMHA_801666_1]
|
Assam Rifles - MHA
|
2. |
22-Mar-2024 03:40 PM |
06-May-2024 10:55 AM |
07-May-2024 11:00 AM |
[VIII.11014/8371/28 Sect/32 COB/Engr-2024/01]
[VIII.11014/8371/28 Sect/32 COB/Engr-2024/01][2024_ARMHA_802019_1]
|
Assam Rifles - MHA
|
3. |
23-Apr-2024 10:00 AM |
06-May-2024 11:00 AM |
07-May-2024 12:00 PM |
[Repair of LT line earthing and stay wire of Headquarters 26 Sector Assam Rifles at Pallel]
[SPR/NIT/ENGR/MW/2024-25/76][2024_ARMHA_804604_1]
|
Assam Rifles - MHA
|
4. |
23-Apr-2024 10:35 AM |
06-May-2024 11:00 AM |
07-May-2024 11:30 AM |
[Repair and maint of floor, Joineries and periodical services in MT Barrack (Bldg No. PFS/17) of HQ 26 Sect AR at Pallel.]
[SPR/NIT/ENGR/MW/2024-25/75][2024_ARMHA_804608_1]
|
Assam Rifles - MHA
|
5. |
26-Apr-2024 12:00 PM |
06-May-2024 11:00 AM |
07-May-2024 11:00 AM |
[Repair and maintenance of boundary wall of BSF campus at FTR HQ BSF Tripura]
[IGA/Engg/E-NIT(C)/23-24/102][2024_BSF_805069_1]
|
DG,BSF,MHA||Tripura FTR(Agartala),BSF,MHA
|
6. |
26-Apr-2024 12:00 PM |
06-May-2024 11:00 AM |
07-May-2024 11:00 AM |
[Replacement of IG Residence false ceiling near kitchen area at campus Salbagan under FTR HQ BSF Tripura]
[IGA/Engg/E-NIT(C)/24.25/43][2024_BSF_805079_1]
|
DG,BSF,MHA||Tripura FTR(Agartala),BSF,MHA
|
7. |
26-Apr-2024 09:00 AM |
06-May-2024 11:00 AM |
07-May-2024 11:00 AM |
[Improvement of Type V Qtr no 03 at campus Salbagan under FTR HQ BSF Tripura (SH Providing and fixing UV stabilized fiberglass reinforced plastic sheet) ]
[IGA/Engg/E-NIT(C)/24-25/44][2024_BSF_805028_1]
|
DG,BSF,MHA||Tripura FTR(Agartala),BSF,MHA
|
8. |
15-Apr-2024 03:00 PM |
06-May-2024 11:00 AM |
07-May-2024 11:00 AM |
[Erection and Commissioning of 11 kV L and T Switchboard at 110 kV substation of FACT CD, Ambalamedu.]
[04026/2024-2025/E29361][2024_FACT_803906_1]
|
The Fertilisers And Chemicals Travancore Ltd.||Head Office - FACT||Corporate materials - FACT
|
9. |
06-Mar-2024 02:00 PM |
06-May-2024 11:00 AM |
07-May-2024 01:00 PM |
[Upgradation to two-lane with paved shoulder of Hanumangarh to Kenchiyan from km 0.000 (existing chainage Km 23.200) to Km 49.605 (existing chainage Km 74.645) of NH-54 in the state of Rajasthan on EPC mode]
[NIT No. 03/2023-24 SE NH BIKANER][2024_MoRTH_799115_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH||National Highway Rajasthan PWD-BIKANER - MoRTH
|
10. |
15-Apr-2024 11:00 AM |
06-May-2024 11:00 AM |
07-May-2024 11:00 AM |
[Purchase of Picoammeter (under low level Sensitive and speciality instruments)]
[NITJ/PUR/EE/189/23/e-tender No. 04/2024][2024_NITJ_803227_1]
|
Dr.B.R.Ambedkar National Institute of Technology-Jalandhar
|