Logo
Notices eProcurement System Government of India
 
Back
 
 
S.No e-Published Date Closing Date Opening Date Title and Ref.No./Tender ID Organisation Chain
1 14-Jul-2025 06:50 PM 05-Aug-2025 03:00 PM 09-Aug-2025 03:30 PM [Reconstruction of CISF Barrack Building at Power House BSPS, Surangani] [NH/BSPS/CC/CW/14/2025-26/129][2025_NHPC_868775_1] NHPC Limited||Bairasiul Power Station-NHPC||Proc and Contract-BPS-NHPC
2 14-Jul-2025 05:00 PM 04-Aug-2025 03:00 PM 08-Aug-2025 03:00 PM [Repair, painting, and other miscellaneous works for guard rooms, CISF control room at the Central Store, and the main gate of Teesta Low Dam-III Power Station in Sectors A, C, and F] [NH/TLD-III PS/Cont./F-1187/50][2025_NHPC_868827_1] NHPC Limited||Teesta Low Dam III Power Station-NHPC
3 14-Jul-2025 03:00 PM 06-Aug-2025 05:00 PM 12-Aug-2025 03:00 PM [Replacement of Steel liner and Sill Beam of Radial Gate No. 4 at Dulhasti Power Station Kishtwar] [NH/DPS/CONT/NIT-246/2025/ E148667 dated 14.07.2025][2025_NHPC_868645_1] NHPC Limited||Dulhasti Power Station-NHPC
4 12-Jul-2025 04:15 PM 11-Aug-2025 03:30 PM 12-Aug-2025 03:30 PM [Removal of Deposited Sediments from Salal Dam Reservoir] [NH/CCW/CC-II/Salal-PS/EOI-2636][2025_NHPC_868688_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
5 12-Jul-2025 10:00 AM 02-Aug-2025 05:00 PM 07-Aug-2025 03:00 PM [Internal Electrification of CISF Frisking and Control Room at main gate of NHPC Colony Kralpora, Bandipora, J and K (PKG-537)] [NH/KG/PnC/EI/PKG-537/2025][2025_NHPC_868624_1] NHPC Limited||Kishanganga Project-NHPC
6 10-Jul-2025 05:00 PM 05-Aug-2025 05:00 PM 09-Aug-2025 03:00 PM [Ultrasonictesting of Circum. and Longi. WeldingJoints of02Nos.5.23m dia.Undergr.Penstock along with repairingofallthe failureordamaged joints identifiedduring UTprocess andinternal paintingofallthesurfaces of Penstock thereafter as per sow at SalalPS] [NH/SPS/PnC/NIT212/2526/342-351][2025_NHPC_868264_1] NHPC Limited||Salal Power Station-NHPC
7 10-Jul-2025 05:00 PM 29-Sep-2025 06:00 PM 07-Oct-2025 11:30 AM [Lot-2a Electro-mechanical works (Except GSU, GIS, XLPE and Switchyard Equipment) of 260 MW (2X130MW) Dulhasti Stage-II H.E Project, Kishtwar District of UT of J and K, India] [NH/Conts(EnM)-I/Dulhasti Stage-II/ENM/2025/01][2025_NHPC_866662_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-E and M-CO-NHPC
8 10-Jul-2025 10:00 AM 30-Jul-2025 06:00 PM 04-Aug-2025 04:00 PM [Painting work of Radial gates, Hydraulic Power pack, Stoplog gates, Intake bulkhead and Service gates etc of CPS2] [NH/CPS- II/Cont./E- 144466/2025-26/ 04][2025_NHPC_868127_1] NHPC Limited||Chamera-II Power Station-NHPC
9 09-Jul-2025 11:30 AM 30-Jul-2025 11:30 AM 02-Aug-2025 11:30 AM [Supply and application of thermal lagging and pipe repair on cooling water regulating system, pipeline of Stator air coolers, Bearing oil coolers and Generator Transformer coolers] [NH/TPS/PnC / NIT/2025/ E 144544 /1087/ 223 Date 08/07/2025][2025_NHPC_867981_1] NHPC Limited||Tanakpur Power Station-NHPC
10 09-Jul-2025 10:00 AM 24-Jul-2025 05:00 PM 26-Jul-2025 03:00 PM [Hill slope protection and stabilization along the TBM-adit portal road, Kishanganga Power Station, Bandipora, UT of J and K, (PKG-540).] [NH/KG/PnC/PHC/PKG-540/2025][2025_NHPC_867839_1] NHPC Limited||Kishanganga Project-NHPC
11 08-Jul-2025 05:35 PM 30-Jul-2025 05:00 PM 05-Aug-2025 05:00 PM [Post Monsoon Hydrographic Survey of Salal Dam Reservoir at Dhyangarh for the year 2025-26] [NH/SPS/CD/NIT106/25-26/323-333][2025_NHPC_867884_1] NHPC Limited||Salal Power Station-NHPC
12 08-Jul-2025 05:00 PM 29-Jul-2025 05:30 PM 05-Aug-2025 04:00 PM [Re-Construction of 11 by 0.415 KV Electrical Sub-Station with HT Line, HT and LT Panels, and other associated works at Dikchu Dam Site of Teesta-V Power Station NHPC Ltd., damaged due to land slide] [NH/TSV/CONT/EC-163/NIT-1031/][2025_NHPC_865435_1] NHPC Limited||Teesta-V Power Station-NHPC
13 07-Jul-2025 02:00 PM 22-Jul-2025 06:00 PM 28-Jul-2025 03:30 PM [Supply, Installation Calibration of Sensor Encoder with digital display for Gate Position] [NH/CPS-II/Cont./ E-135902/2025-26/02][2025_NHPC_859370_2] NHPC Limited||Chamera-II Power Station-NHPC
14 07-Jul-2025 12:00 PM 04-Aug-2025 05:00 PM 07-Aug-2025 03:00 PM [Painting of external surfaces of 06 Nos. Penstock as per Scope of Work at Salal Power Station] [NH/SPS/PnC/NIT-211/ 25-26/311-320 ][2025_NHPC_867631_1] NHPC Limited||Salal Power Station-NHPC
15 05-Jul-2025 05:00 PM 26-Jul-2025 05:00 PM 30-Jul-2025 11:00 AM [De-siltation of Khordak Channel from Loktak Forest view point to the end of Khordak Channel.] [NH-LPS-CDIV/53/2025-CD I II/1082][2025_NHPC_867403_1] NHPC Limited||Loktak power station-NHPC
16 05-Jul-2025 04:00 PM 26-Jul-2025 04:00 PM 29-Jul-2025 04:00 PM [Painting and flooring works in side Power house and GIS and DG building in Switch Yard area at CPS-III, Dharwala. (E-office no. 97099 )] [NH/CPS- III/Cont./97099/2025-26/107][2025_NHPC_867619_1] NHPC Limited||Chamera-III Power Station-NHPC
17 05-Jul-2025 03:00 PM 26-Jul-2025 05:00 PM 30-Jul-2025 03:00 PM [Painting and renovation of 16 Nos of rooms, Common Mess, Training Hall and CGI sheet replacement of Executive Field Hostel at Dulhasti Power Station Kishtwar] [NH/DPS/CONT/NIT-243/2025/ E144291 dated 05.07.2025][2025_NHPC_867430_1] NHPC Limited||Dulhasti Power Station-NHPC
18 05-Jul-2025 03:00 PM 28-Jul-2025 05:00 PM 02-Aug-2025 03:00 PM [Supply and Erection of EOT Crane for Drainage and Dewatering System at Powerhouse of Dulhasti Power Station, Kishtwar] [NH/DPS/CONT/NIT-242/2025/ E147419 dated 05.07.2025][2025_NHPC_867488_1] NHPC Limited||Dulhasti Power Station-NHPC
19 05-Jul-2025 03:00 PM 26-Jul-2025 03:00 PM 05-Aug-2025 03:00 PM [Repair and HP-HVOF coating of 02 Sets of Guide Vanes (one set comprising 20 Nos. Guide Vanes) of Dhauliganga Power Station (2025-26)] [NH/DG/Contract/1067/2025-26/26 Dated 05/07/2025][2025_NHPC_867614_1] NHPC Limited||Dhauliganga Power Station-NHPC
20 05-Jul-2025 03:00 PM 28-Jul-2025 06:55 PM 06-Aug-2025 03:00 PM [Hydrographical Survey of Dam reservoir, River Cross-Sections and Level Marking at G and D Sites of Dhauliganga Power Station] [NH/DG/CONTRACT/1069/2025-26/25][2025_NHPC_867489_1] NHPC Limited||Dhauliganga Power Station-NHPC
21 05-Jul-2025 11:30 AM 26-Jul-2025 11:30 AM 29-Jul-2025 11:30 AM [Repair and Maintenance of 03 Nos mobile cranes of TPS] [NH/TPS/PnC/NIT /2025/E 145674 /1088/207 Date 04/07/2025][2025_NHPC_867504_1] NHPC Limited||Tanakpur Power Station-NHPC
22 05-Jul-2025 10:00 AM 26-Jul-2025 05:00 PM 31-Jul-2025 03:30 PM [Maintenance of 3 Nos. 100 MW Hydro Generator Units of Chamera II Power Station Karian Distt. Chamba H.P for Two years i.e. 2025-26 to 2026-27] [Maintenance of 3 Nos. 100 MW Hydro Generator Units of Chamera II Power Station, Karian][2025_NHPC_867410_1] NHPC Limited||Chamera-II Power Station-NHPC
23 04-Jul-2025 06:30 PM 19-Jul-2025 05:00 PM 23-Jul-2025 03:00 PM [Repairing work of 33 KV feeder line from Bathri substation to Gandiyar] [NH/CPS-1/PnC/W-1521/2025-26/ 118 Dated 04/07/2025][2025_NHPC_867548_1] NHPC Limited||Chamera Power Station-I-NHPC
24 04-Jul-2025 05:00 PM 26-Jul-2025 06:00 PM 28-Jul-2025 03:00 PM [Appointment of Dividend Banker for Payment of Final Dividend for the Financial Year 2024-25] [NH/CCW/CC-II/CO404/PR10025/115][2025_NHPC_867384_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
25 03-Jul-2025 06:00 PM 18-Jul-2025 05:00 PM 22-Jul-2025 05:00 PM [Restoration of slide portion at RD 4.40 Km on Mashka -Pepri Road of Sewa-II Power Station Mashka (J and K) (CW-687)] [NH/Sewa2/Cont/CW-687/NIT-05/55 Dt.03.07.25][2025_NHPC_867307_1] NHPC Limited||Sewa Power Station-NHPC
26 03-Jul-2025 06:00 PM 24-Jul-2025 03:00 PM 28-Jul-2025 03:30 PM [NH/BSPS/CC/CW/16/2025-26/109] [NH/BSPS/CC/CW/16/2025-26/109][2025_NHPC_867285_1] NHPC Limited||Bairasiul Power Station-NHPC||Proc and Contract-BPS-NHPC
27 03-Jul-2025 05:30 PM 02-Aug-2025 05:30 PM 06-Aug-2025 11:00 AM [Renovation of Auditorium including Electrification, Acoustic Treatment, Seating, Automated Stage Curtains and Carpeting at Salal Power Station, Jyotipuram. ] [NH/SPS/PnC/NIT210/2526/300-309][2025_NHPC_867236_1] NHPC Limited||Salal Power Station-NHPC
28 02-Jul-2025 05:30 PM 30-Jul-2025 05:30 PM 05-Aug-2025 11:00 AM [CompleteReplacement of Old RubberSeal with NewOne including replacement of Nuts andBolts i.r.o.11 Nos. SpillwayRadialGates and 01No.Flap SpillwayRadialGates and Painting of all Hydro-Mech.Equip. as perSpecifications and Scope of Work/BOQ at Salal PS.] [NH/SPS/PnC/NIT209/2526/289-298][2025_NHPC_866971_1] NHPC Limited||Salal Power Station-NHPC
29 02-Jul-2025 05:00 PM 23-Jul-2025 05:00 PM 29-Jul-2025 05:00 PM [Repair and Restoration of All Field Hostels with PVC Lining and tile work around Guest House and Exe. Field Hostel at Sewa-II Power Station Maska (J and K) (CW-683)] [NH/Sewa2/Cont/CW-683/NIT-04/54 Dt.02.07.25 ][2025_NHPC_867104_1] NHPC Limited||Sewa Power Station-NHPC
30 02-Jul-2025 03:00 PM 23-Jul-2025 03:00 PM 01-Aug-2025 03:00 PM [Re-babbiting on turbine guide bearing shells for Dhauliganga power station] [NH/DG/Contract/1068/2025-26/22 Dated 02/07/2025][2025_NHPC_866825_1] NHPC Limited||Dhauliganga Power Station-NHPC
31 02-Jul-2025 03:00 PM 23-Jul-2025 05:30 PM 30-Jul-2025 01:00 PM [Re- routing or construction of the damaged 11KV HT line from the DG set (Dam Office) to the SFT] [NH/TSV/CONT/EC-166/NIT-1029][2025_NHPC_867056_1] NHPC Limited||Teesta-V Power Station-NHPC
32 30-Jun-2025 06:00 PM 01-Aug-2025 05:30 PM 06-Aug-2025 03:00 PM [Selection of Roof Top Developer for Setting up Grid Connected Solar Roof Top Plants at Various locations on government buildings in the state of Manipur on RESCO Mode through Tariff-Based Competitive Bidding] [NH/CCW/CC-I/CO-368/PR61324/13 Dated 28.01.2025][2025_NHPC_866497_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
33 30-Jun-2025 05:00 PM 21-Jul-2025 03:00 PM 25-Jul-2025 03:00 PM [Epoxy Painting of spillway radial gate, spillway stoplog gates, Intake stoplog gates of Hydro-Mechanical Division at TLD-III Power station] [NH/TLD-III PS/Cont./F-1171/43][2025_NHPC_866642_1] NHPC Limited||Teesta Low Dam III Power Station-NHPC
34 30-Jun-2025 04:00 PM 21-Jul-2025 04:00 PM 23-Jul-2025 04:00 PM [Repair and HP-HVOF Coating of 20 Nos of wicket gates (01 set ) of 77 MW Francis Hydro-turbine of Chamera-III Power station (E-office no. 142370 )] [NH/CPS- III/Cont./142370/2025-26/88][2025_NHPC_866656_1] NHPC Limited||Chamera-III Power Station-NHPC
35 28-Jun-2025 06:30 PM 19-Jul-2025 03:00 PM 23-Jul-2025 03:30 PM [Electrical Wiring and Lighting works of dormitory, shed and security check post at Nakrod field hostel complex at Dam site of BSPS] [NH/BSPS/CC/CW/07/2025-26/100][2025_NHPC_866563_1] NHPC Limited||Bairasiul Power Station-NHPC
36 26-Jun-2025 05:30 PM 17-Jul-2025 05:30 PM 24-Jul-2025 04:00 PM [Re-Construction of 11 KV Line from Guest house to Dam top at Dam Site for Teesta-V Power Station NHPC Ltd.] [NH/TSV/CONT/EC-165/NIT-1028][2025_NHPC_865961_1] NHPC Limited||Teesta-V Power Station-NHPC
37 25-Jun-2025 06:00 PM 16-Jul-2025 06:00 PM 21-Jul-2025 05:00 PM [Repair and Painting of Valve House Building near Adit -IV and other misc works at Sewa -II Power Station Mashka (J and K) (CW-684)] [NH/Sewa2/Cont/CW-684/NIT-03/51 Dt.25.06.25][2025_NHPC_866143_1] NHPC Limited||Sewa Power Station-NHPC
38 24-Jun-2025 05:00 PM 15-Jul-2025 05:00 PM 19-Jul-2025 11:00 AM [Protection work for Stilling basin area/Plunge Pool area of Ithai Barrage.] [NH-LPS-CDIV/61/2025-CIVIL/1081][2025_NHPC_865718_1] NHPC Limited||Loktak power station-NHPC
39 24-Jun-2025 05:00 PM 15-Jul-2025 03:00 PM 19-Jul-2025 03:30 PM [Carrying out Annual Maintenance and Repair of underwater parts of three Generating units of 3X60 MW of BSPS for FY 2025-26 and 2026-27] [NH/BSPS/CC/PH/11/2025-26/095][2025_NHPC_865838_1] NHPC Limited||Bairasiul Power Station-NHPC
40 24-Jun-2025 05:00 PM 16-Jul-2025 05:00 PM 19-Jul-2025 03:30 PM [Painting Lettering and Numbering of Electrical Equipment at NHPC Right Bank Colony] [NH/SLP/CONT/2025/C-07/NIT/541][2025_NHPC_865849_1] NHPC Limited||Subansiri Lower Project-NHPC
41 23-Jun-2025 06:00 PM 24-Jul-2025 05:30 PM 29-Jul-2025 03:00 PM [Selection of Roof Top Developer for Setting up Grid Connected Solar Roof Top Plants at Various locations on government buildings in the state of Sikkim on RESCO Mode .] [NH/CCW/CC-I/CO-362/PR61324/10 ][2025_NHPC_865410_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
42 21-Jun-2025 11:00 AM 19-Jul-2025 05:00 PM 24-Jul-2025 03:00 PM [PR11923/155/1- Restoration of 03 no. 11 KV Line from 33/11 KV Substation, Behali to Power House and Sapangini Township at Parbati-III Power station] [PR11923/255/1- Restoration of 03 number 11 KV Line from 33/11 KV Substation, Behali to Power House ][2025_NHPC_865396_1] NHPC Limited||Parbati III Power Station-NHPC
43 19-Jun-2025 06:00 PM 21-Jul-2025 05:30 PM 25-Jul-2025 03:00 PM [Selection of Roof Top Developer for Setting up Grid Connected Solar Roof Top Plants at Various locations on government buildings in the state of Haryana on RESCO Mode .] [NH/CCW/CC-I/CO-369/PR61324/12][2025_NHPC_865074_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
44 19-Jun-2025 05:00 PM 17-Jul-2025 03:00 PM 21-Jul-2025 03:00 PM [Painting and Misc repair works of Administrative Building, Canteen, Park Premises at Sector-C, TLD-III PS] [NH/TLD-III PS/Cont./F-1185/41][2025_NHPC_865235_1] NHPC Limited||Teesta Low Dam III Power Station-NHPC
45 19-Jun-2025 11:00 AM 16-Jul-2025 03:00 PM 19-Jul-2025 11:30 AM [Repair work of toilets in Administrative Building of NHPC Regional Office, Sector-31A, NHPC Regional Office, Chandigarh] [NH/ROCHD/PNC/CW16/2025/18 dt.02.06.2025][2025_NHPC_862770_1] NHPC Limited||Regional Office Chandigarh-NHPC
46 16-Jun-2025 06:00 PM 16-Jul-2025 05:30 PM 21-Jul-2025 03:00 PM [Selection of developers for installing rooftop solar plants on buildings of various departments (Law Justice, Jal Shakti, Irrigation Flood Control, Forest, Ecology Environment, and Home) in UT of J and K through JAKEDA in RESCO mode.] [NH/CCW/CC-I/CO-396/PR61325/1][2025_NHPC_864442_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
47 11-Jun-2025 06:00 PM 18-Jul-2025 05:30 PM 22-Jul-2025 03:00 PM [Selection of Roof Top Developer for Setting up Grid Connected Solar Roof Top Plants at Various locations on government buildings in the state of Nagaland on RESCO Mode through Tariff-Based Competitive Bidding] [NH/CCW/CC-I/CO-379/PR61324/14 ][2025_NHPC_863785_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
48 07-Jun-2025 05:00 PM 11-Aug-2025 06:00 PM 19-Aug-2025 11:30 AM [Lot-III Electro-mechanical works package of 240 MW (2X120MW) Uri-I Stage-II H.E Project] [NH/Conts(EnM)-III/Uri-I Stage-II/ENM/2025/01][2025_NHPC_861342_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-E and M-CO-NHPC
49 30-May-2025 06:55 PM 29-Jul-2025 05:00 PM 31-Jul-2025 11:30 AM [Lot I Package Civil works of Dulhasti stage II HEP, Kishtwar, Jammu and Kashmir] [NH/CCW/CCIII/CO397/PR10925/49][2025_NHPC_862404_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
50 30-May-2025 06:00 PM 29-Jul-2025 05:00 PM 01-Aug-2025 03:30 PM [Lot II Package Hydromechanical Works for All Gates and Pressure Shaft Liners for the implementation of the 240 MW Uri I Stage II H.E Project, located near Boniyar, Uri villages in the Baramulla District of UT of Jammu and Kashmir] [NH/CCW/CC-III /CO-398/PR-10625/35][2025_NHPC_862315_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
51 26-May-2025 10:00 AM 21-Jul-2025 04:00 PM 23-Jul-2025 04:00 PM [The work of increase in height of Hoist support structure of Crest Spillway Vertical gate at Dam of Chamera-III Power Station, Khadamukh, Chamba (HP) (E-office no. 134857) ] [NH/CPS- III/Cont./134857/2025-26/62][2025_NHPC_861212_1] NHPC Limited||Chamera-III Power Station-NHPC
52 24-May-2025 05:00 PM 17-Jul-2025 05:00 PM 21-Jul-2025 03:00 PM [Supply and Installation of Automatic HVWS (Fire Fighting System) in two 50 MVAr Shunt Reactors with 1.5 MVAr Neutral Reactors at CPS-1.] [NH/CPS-1/PnC/W-1505/2025-26/ 61 Dated 24/05/2025][2025_NHPC_861515_1] NHPC Limited||Chamera Power Station-I-NHPC
53 14-May-2025 06:00 PM 21-Jul-2025 05:00 PM 28-Jul-2025 03:00 PM [Construction of Community Hall at Samthar suruk in samthar GP, in locality of Punam pariwar welfare society, Kalimpong, West Bengal by TLD-IV PS] [NH/TLDIV PS/PNC/W930/2025/2009][2025_NHPC_859865_1] NHPC Limited||Teesta Low Dam Project Stage IV-NHPC
54 09-May-2025 05:00 PM 28-Jul-2025 05:00 PM 30-Jul-2025 11:30 AM [Lot I Package Civil works package for 240 MW Uri I Stage II H.E Project, located near Boniyar, Uri villages in the Baramulla District of UT of Jammu and Kashmir] [NH/CCW/CCIII/CO389/PR10625/25][2025_NHPC_859472_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
 
Visitor No:31183797
Contents owned and maintained by concerned Departments in coordination with Finance Department and Information Technology Department, Government of India