1. |
11-Jun-2025 04:00 PM |
01-Jul-2025 04:00 PM |
02-Jul-2025 04:00 PM |
[Construction of Cook House with dining hall and recreation Hall at Anini Arunachal Pradesh]
[ITBP/SHQ (DBRG)/Engg/58Bn/Anini/2025][2025_ITBP_864047_1]
|
DG, Indo-Tibetan Border Police Force||IG, NORTH EASTERN FTR,ITBP
|
2. |
24-Jun-2025 06:00 PM |
01-Jul-2025 04:00 PM |
02-Jul-2025 04:00 PM |
[Repair and maintenance work 32 Nos toilet Block B C near by 1st Signal Bn at GC CRPF New Delhi]
[B.V-1/2025-26-GCDEL-Bldg(32 Nos Toilet)][2025_CRPF_865945_1]
|
DG,CRPF,MHA||Northern Sector,CRPF,MHA
|
3. |
20-Feb-2025 03:15 PM |
01-Jul-2025 04:00 PM |
02-Jul-2025 04:00 PM |
[ MECHANICAL, NON IBR PIPING, PAINTING AND OTHER WORKS FOR 5TH STREAM ALUMINA PLANT AT DAMANJODI, ODISHA AND RELATED FACILITIES AT VISHAKHAPATNAM PORT]
[B AND R/HO/71137/NIBR PIPING/BAL/NALCO/NIT/53][2025_BandR_850180_1]
|
Bridge and Roof Company (India) Limited||Corporate Head Quarters Kolkata Office - B and R
|
4. |
10-Jun-2025 05:00 PM |
01-Jul-2025 04:00 PM |
03-Jul-2025 02:00 PM |
[Red stone flooring and wall lining at Right Side of Main Entry of Dr. M A Ansari Auditorium, DSW Office, Jamia Millia Islamia.]
[JMI/BD/E-NIT/No.17/2025-26][2025_JMI_863890_1]
|
Jamia Millia Islamia||Building and Construction Department - JMI
|
5. |
10-Jun-2025 10:00 AM |
01-Jul-2025 04:00 PM |
03-Jul-2025 02:30 PM |
[Maintenance of Equipments and Pipelines in H2S generation and Recovery unit]
[HWPM/M-P/RTEQP/11/2025 30/05/2025][2025_HWB_863306_1]
|
Heavy Water Board||Heavy Water Plant Manuguru
|
6. |
23-Jun-2025 09:00 AM |
01-Jul-2025 04:00 PM |
02-Jul-2025 05:00 PM |
[CO Of Quarter guard G plus 1 at BN HQ KLP BAISHNAVNAGAR under SHQ BSF BHP. SH Soil investigation and structural design]
[03/Engg/E-NIT(Civil)/SHQ BHP/2025-26][2025_BSF_865665_1]
|
DG,BSF,MHA||South Bengal(Kolkata),BSF,MHA
|
7. |
23-Jun-2025 09:00 AM |
01-Jul-2025 04:00 PM |
02-Jul-2025 05:00 PM |
[C O Of MI Room at BN HQ KLP BAISHNAVNAGAR under SHQ BSF BHP. SH Soil investigation and structural design]
[02/Engg/E-NIT(Civil)/SHQ BHP/2025-26][2025_BSF_865657_1]
|
DG,BSF,MHA||South Bengal(Kolkata),BSF,MHA
|
8. |
24-Jun-2025 04:00 PM |
01-Jul-2025 04:00 PM |
02-Jul-2025 04:00 PM |
[SITC of Electrical installation, wiring, illumination, cabling, power point, light and fan point works in the S N Bose Hostel IIT(BHU), Varanasi]
[IIT(BHU)/IWD/ET04/2025-26/379][2025_IITBU_865851_1]
|
Indian Institute of Technology(BHU) Varanasi||Institute Works Department - IIT(BHU)
|
9. |
24-Jun-2025 04:00 PM |
01-Jul-2025 04:00 PM |
02-Jul-2025 04:00 PM |
[SITC of Electrical installation, wiring, illumination, cabling, power point, light and fan point works in the C.V Raman Hostels, IIT(BHU), Varanasi.]
[IIT(BHU)/IWD/ET02/2025-26/377][2025_IITBU_865858_1]
|
Indian Institute of Technology(BHU) Varanasi||Institute Works Department - IIT(BHU)
|
10. |
24-Jun-2025 04:00 PM |
01-Jul-2025 04:00 PM |
02-Jul-2025 04:00 PM |
[Electrical wiring, renovation work and illumination, power point, light and fan point works in the GSMC Old, GSMC New and Nivedita Hostel, IIT(BHU), Varanasi]
[IIT(BHU)/IWD/ET03/2025-26/378][2025_IITBU_865854_1]
|
Indian Institute of Technology(BHU) Varanasi||Institute Works Department - IIT(BHU)
|