1. |
13-Jun-2025 12:30 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Repair work in Laboratory in the 3rd floor of the Department of Physics, Academic building-VI, maintenance and allied works in Animal House, two nos. aluminium door replacement in Geography Department, and 7 nos. doors replacement (5 Iron and 2 PVC) ]
[TU/Eng Cell/civil/maintc/10/2025-2026 ][2025_TU_864461_1]
|
Tripura University
|
2. |
13-Jun-2025 04:20 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[JP/B224-000-MD-MR-5720/16 EMERGENCY DG PACKAGE FOR RAJASTHAN REFINERY PROJECT (RRP) OF HRRL, BARMER, RAJASTHAN, INDIA ]
[JP/B224-000-MD-MR-5720/16][2025_EIL_864526_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG
|
3. |
27-Jun-2025 09:30 AM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[External repairing and re-painting of 01 no block Type-II qtr (Block No. 11) at 207 CoBRA CRPF, Medinipur, (WB)]
[B-V(207 CoBRA)/2025-26-CZ-C/Cell (TE-11) ][2025_CRPF_866226_1]
|
DG,CRPF,MHA||Central Zone,CRPF,MHA||Central Zone HQRS,CRPF,MHA
|
4. |
30-Jun-2025 03:00 PM |
03-Jul-2025 12:00 PM |
03-Jul-2025 02:00 PM |
[INVITATION TO PRE-TENDER MEET FOR COMPRESSOR-CENTRIFUGAL (SPP) (B957-300-KA-MR-5030) BINA PETCHEM AND REFINERY EXPANSION PROJECTS (BPREP) AT BINA REFINERY, MADHYA PRADESH (INDIA) OF M/s BPCL]
[INVITATION TO PRE-TENDER MEET FOR COMPRESSOR-CENTRIFUGAL (SPP)][2025_EIL_866670_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG
|
5. |
27-Mar-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[SELECTION OF PMIS SOLUTION AND SI FOR IMPLEMENTATION IN EIL]
[SELECTION OF PMIS SOLUTION AND SI FOR IMPLEMENTATION IN EIL ][2025_EIL_852922_1]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG
|
6. |
13-Jun-2025 06:55 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 02:00 PM |
[LAYING OF ETP DISCHARGE PIPELINE AT PARADIP]
[MK/B302-000-MK-T-9524/1032][2025_EIL_860990_2]
|
Engineers India Limited,MoPNG||Head Office-Delhi,EIL,MoPNG
|
7. |
13-Jun-2025 09:30 AM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[i) Boring of 02 nos deep tube well with submerible pump (ii) C/O 02 nos water harvesting ground water recharge (iii) C/O RCC drain covers (length 500 mtr) for open storm water drain at 205 CoBRA Bn, CRPF, Bihar]
[B.V(205 CoBRA Bn.) Spl. Repair/2025-26-CZ-C/Cell (NIT-37)][2025_CRPF_864366_1]
|
DG,CRPF,MHA||Central Zone,CRPF,MHA||Central Zone HQRS,CRPF,MHA
|
8. |
20-Jun-2025 05:45 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:30 PM |
[MALDI-TOF System]
[TMH/MUZ/2025-2026/CPU/EO/0004][2025_TMC_865568_1]
|
Tata Memorial Centre||Tata Memorial Hospital Mumbai
|
9. |
26-Jun-2025 11:15 AM |
03-Jul-2025 12:00 PM |
04-Jul-2025 12:00 PM |
[Provn of roof replacement existing 02 OR living bk Bldg No T0105C T6510B of Bn HQ of 31 Assam Rifles at Changlang ]
[VIII.11013/Engr/MW/2025-26/08][2025_ARMHA_866210_1]
|
Assam Rifles - MHA
|
10. |
19-Jun-2025 04:35 PM |
03-Jul-2025 12:00 PM |
04-Jul-2025 03:00 PM |
[NISER/ME/BIOGAS/AMC/24-25/04_1]
[NISER/MECH/BIOGAS/AMC/24-25/04][2024_NISER_839389_2]
|
National Institute of Science Education and Research - Odisha||Institute Works Department (IWD)||Mechanical Section
|