1. |
30-Jun-2025 04:00 PM |
19-Jul-2025 09:00 AM |
29-Jul-2025 11:30 AM |
[VIIII.11014/9004/23 Sect AR/2025]
[VIII.11014/9004/23 Sect AR/Engr/2025][2025_ARMHA_866686_1]
|
Assam Rifles - MHA||Engineer Branch - AR - MHA
|
2. |
04-Jul-2025 02:00 PM |
19-Jul-2025 09:30 AM |
23-Jul-2025 09:30 AM |
[CONSTRUCTION OF C and I BUILDING AT 05 AREA IN ALUMINA PLANT DAMANJODI]
[TnC/AR/03/eC-2870][2025_NALCO_867371_1]
|
National Aluminium Company Limited,NALCO||NALCO-Alumina Division-Damanjodi||Tender and Contract-AD-Damanjodi-NALCO
|
3. |
18-Jun-2025 09:00 AM |
19-Jul-2025 10:00 AM |
21-Jul-2025 10:00 AM |
[NIT for the comprehensive deployment, operation, and support of a Digital Cinema Equipment setup in the Institute Auditorium on rental basis]
[IIML/PUR/04/2025-26][2025_IIML_864987_1]
|
Indian Institute of Management Lucknow||Purchase Section - IIM Lucknow
|
4. |
04-Jul-2025 05:00 PM |
19-Jul-2025 10:00 AM |
21-Jul-2025 11:00 AM |
[Supply of Electronic Components]
[CDACT.PHS.SEG178M.CPPP.3.25-26][2025_DIT_867497_1]
|
Department of Electronics and Information Technology(DeitY)||Centre for Development of Advanced Computing - DeitY||Thiruvananthapuram - C-DAC - DeitY
|
5. |
08-Jul-2025 01:15 PM |
19-Jul-2025 10:00 AM |
21-Jul-2025 10:00 AM |
[HTC-ECL-67-PR-10032545]
[HTC-ECL-67-PR-10032545][2025_ARAI_867895_1]
|
Automotive Research Association of India
|
6. |
12-Jul-2025 11:00 AM |
19-Jul-2025 11:00 AM |
21-Jul-2025 12:00 PM |
[rewinding of alternator installed in 100 KVA BFL DG set s no 1308041103105 at BOP srinagar of 121 bn BSF under SHQ BSF udaipur]
[09/SHQ-UPR/AE(E)/NIT/2025-26][2025_BSF_868460_1]
|
DG,BSF,MHA||Tripura FTR(Agartala),BSF,MHA
|
7. |
11-Jul-2025 11:00 AM |
19-Jul-2025 11:00 AM |
21-Jul-2025 11:30 AM |
[C/O MT Garage for STC BSF Indore(SH Soil Investigation and Structure design)]
[55/NIT/STC-INDORE/2025-26][2025_BSF_868477_1]
|
DG,BSF,MHA||CSWT Indore,BSF,MHA
|
8. |
12-Jul-2025 11:00 AM |
19-Jul-2025 11:00 AM |
21-Jul-2025 12:00 PM |
[repairing of 100 KVA BFL DG set alternators installed at BOP Madhavnagar and kennedy in AOR of 121 Bn BSf under SHQ BSF Udaipur]
[08/SHQ-UPR/AE(E)/NIT/2025-26][2025_BSF_868456_1]
|
DG,BSF,MHA||Tripura FTR(Agartala),BSF,MHA
|
9. |
10-Jul-2025 02:15 PM |
19-Jul-2025 11:00 AM |
21-Jul-2025 11:30 AM |
[Comprehensive Annual Maintenance Contract for VRF AC Voltas at 2nd floor Conference Hall, DPS MR Chamber, First floor Director Chamber, Ground floor Dy Director Chamber, Heritage building , GPO, Mumbai.]
[07/AEE/PESD-I/MBI/2025-26/151][2025_DOP_868274_1]
|
Department of Posts||Maharashtra Circle,Dept. of Posts||CPMG,Maharashtra Circle,Mumbai,POST||EE ( Electrical),Postal Electrical Division,POST
|
10. |
11-Jul-2025 09:00 AM |
19-Jul-2025 11:00 AM |
21-Jul-2025 11:30 AM |
[C/O Parade Ground for STC BSF Indore (SH Soil Investigation and Structure design)]
[50/NIT/STC-INDORE/2025-26][2025_BSF_866989_2]
|
DG,BSF,MHA||CSWT Indore,BSF,MHA
|