1. |
10-Sep-2025 03:30 PM |
16-Sep-2025 09:00 AM |
17-Sep-2025 11:30 AM |
[Protective Work to Mitigate Landslide issue due to incessant heavy rains at Kohima to include provision of RCC retaining Wall]
[VIII.11014/9115/Emergent/IGAR][2025_ARMHA_876786_1]
|
Assam Rifles - MHA
|
2. |
28-Aug-2025 01:00 PM |
16-Sep-2025 09:00 AM |
17-Sep-2025 11:00 AM |
[Proposed of helipad for renovation construction for COB Kaimai of 39 Assam Rifles]
[VIII.11014/9101/IGAR(E)/2025][2025_ARMHA_875015_1]
|
Assam Rifles - MHA
|
3. |
02-Sep-2025 09:00 AM |
16-Sep-2025 10:00 AM |
17-Sep-2025 11:30 AM |
[REPAIRING OF TYPE V QTR NO 01 AND 02 ]
[B.V-4/2024-25-SZ-Works (GC NGR) Major Work T/073][2025_CRPF_875593_1]
|
DG,CRPF,MHA||South Zone,CRPF,MHA
|
4. |
02-Sep-2025 09:00 AM |
16-Sep-2025 10:00 AM |
17-Sep-2025 11:30 AM |
[Repair and Maintenance of T-III F Qtrs from Qtr No 301 to 364, except qtr no 309-312 Total 60 Nos of Qtrs Excluding Waterproofing of roof top]
[B.V-4/2024-25-SZ-Works (GC AVD) Major Work T/064][2025_CRPF_875589_1]
|
DG,CRPF,MHA||South Zone,CRPF,MHA
|
5. |
28-Aug-2025 05:00 PM |
16-Sep-2025 10:30 AM |
17-Sep-2025 11:30 AM |
[VIII/11014/9168/6 Sect/Helipad/Engr/2025]
[VIII.11014/9168/6 Sect/Helipad/Engr/2025][2025_ARMHA_875068_1]
|
Assam Rifles - MHA||Engineer Branch - AR - MHA
|
6. |
28-Aug-2025 12:25 PM |
16-Sep-2025 10:30 AM |
18-Sep-2025 04:00 PM |
[Supply of Dry ration at tpt bn]
[No IV 17020 Grain Shop Tender 2025 126 dtd 27 08 25][2025_ITBP_875021_1]
|
DG, Indo-Tibetan Border Police Force||IG, L and C ZONE,ITBP
|
7. |
26-Aug-2025 04:00 PM |
16-Sep-2025 11:00 AM |
17-Sep-2025 11:00 AM |
[SITC OF PRECISION TEMPERATURE AIR-CONDITIONING SYSTEM WORKING WITH VRF/VRV]
[TIFR/PD/CA25-68/250911][2025_DAE_874742_1]
|
Department of Atomic Energy||Tata Institute of Fundamental Research-Colaba-Mumbai-Purchase Dept-TIFR-DAE||TIFR(HQ)-Mumbai-TIFR-DAE
|
8. |
26-Aug-2025 03:00 PM |
16-Sep-2025 11:00 AM |
17-Sep-2025 11:30 AM |
[Series and Parallel Configuration of Pumps]
[NITW/PS-40/G/2405/2025/Series Parallel Configuration of Pumps/CED][2025_NITW_874750_1]
|
National Institute of Technology Warangal||Purchase and Stores Section - NIT Warangal
|
9. |
26-Aug-2025 03:00 PM |
16-Sep-2025 11:00 AM |
17-Sep-2025 11:00 AM |
[Painting of plant structures, pipe lines, vessels, storage tanks, equipment etc. and other connected structures at Acid Plant in FACT UC.]
[03009/2025-2026/E32029][2025_FACT_874689_1]
|
The Fertilisers And Chemicals Travancore Ltd.||Head Office - FACT||Corporate materials - FACT
|
10. |
27-Aug-2025 05:00 PM |
16-Sep-2025 11:00 AM |
17-Sep-2025 11:00 AM |
[Build up Milk and Milk Products Booth, Residential Campus, Sector 12, Chandigarh]
[PGI/Est-I/22][2025_PGIME_874873_1]
|
Postgraduate Institute of Medical and Education and Research Chandigarh||Estate Branch (Commercial) - PGIMER Chandigarh
|