1. |
29-Aug-2025 10:00 AM |
15-Sep-2025 12:30 PM |
16-Sep-2025 12:45 PM |
[FABRICATION AND INSTALLATION OF STALL]
[C-DOT/DEL/MKTG/2025-2026/01][2025_CDOT_875058_1]
|
Centre for Development of Telematics||Corporate HQ-New Delhi - C-DOT||Purchase - C-DOT
|
2. |
25-Aug-2025 01:00 PM |
15-Sep-2025 01:00 PM |
16-Sep-2025 01:30 PM |
[Execution of the work namely Upgradation of public amenities such as old toilet block ,baby care room, drinking water facilities ,cafeteria and pathways etc. of Sculpture and rock cut reliefs of Unakotitirtha at Unakoti, Tripura.]
[T-15054/20/2025-Aizawl circle-689][2025_ASI_874554_1]
|
Archaeological Survey of India||O/o Dy. SA-ASI-Aizwal
|
3. |
01-Sep-2025 06:00 PM |
15-Sep-2025 01:00 PM |
16-Sep-2025 01:00 PM |
[Replacement of defective exhaust fan, ceiling fan, fittings and electrical work in the common area at Environmental Studies, Botany, Anthropology, Zoology, Geology Department, University of Delhi.]
[CEET-6902][2025_DU_875443_1]
|
Delhi University||Central Office - DU||Engineering - DU
|
4. |
04-Sep-2025 05:45 PM |
15-Sep-2025 01:00 PM |
16-Sep-2025 02:30 PM |
[Procurement of Ion 540 Kit Chef, Cat No. A30011, Qty-11 Kits for Molecular Pathology Department at HBCH/ MPMMCC Varanasi]
[HBCH/MPMMCC/ST/15/KH][2025_TMC_876177_1]
|
Tata Memorial Centre||Mahamana Pt M M Malaviya Cancer Centre Varanasi
|
5. |
02-Sep-2025 12:00 PM |
15-Sep-2025 01:00 PM |
16-Sep-2025 01:00 PM |
[COLD ROOM FOR THE DEPARTMENT OF CHEMO-PHARMACY]
[CNCI/e NIT-90/2025-26, 2nd call][2025_CNCI_875615_1]
|
Chittaranjan National Cancer Institute - Kolkata
|
6. |
04-Sep-2025 05:15 PM |
15-Sep-2025 01:00 PM |
16-Sep-2025 02:30 PM |
[Procurement of Ion 540 Chip Kit 8 Chip, Cat No. A37866, Qty-11 Kits for Molecular Pathology Department at HBCH/ MPMMCC Varanasi]
[HBCH/MPMMCC/ST/14/KH][2025_TMC_876160_1]
|
Tata Memorial Centre||Mahamana Pt M M Malaviya Cancer Centre Varanasi
|
7. |
02-Sep-2025 06:00 PM |
15-Sep-2025 01:00 PM |
16-Sep-2025 01:00 PM |
[Replacement the defective ruby lights fittings, provision of earthling for various poles and other allied work near Rugby Stadium at Sports Complex University of Delhi]
[CEET-6911][2025_DU_875717_1]
|
Delhi University||Central Office - DU||Engineering - DU
|
8. |
01-Sep-2025 06:00 PM |
15-Sep-2025 01:00 PM |
16-Sep-2025 01:00 PM |
[Repair, Water Proofing treatment , Water supply line replacing damaged water Tank, repairing plaster and finishing work at stack hall CLC Library , University of Delhi]
[CEET-6907][2025_DU_875547_1]
|
Delhi University||Central Office - DU||Engineering - DU
|
9. |
03-Sep-2025 06:00 PM |
15-Sep-2025 01:00 PM |
16-Sep-2025 01:00 PM |
[Supplying and fixing of 7.5 HP waste disposal drain pump and repairing of existing 10 HP and 12.5 sewage pump and other allied work to be carried out at Maurice Nagar University of Delhi]
[CEET-6913][2025_DU_875803_1]
|
Delhi University||Central Office - DU||Engineering - DU
|
10. |
29-Aug-2025 06:00 PM |
15-Sep-2025 01:00 PM |
16-Sep-2025 01:00 PM |
[Repair and renovation of C-16 flat including and termite treatment, Expansion of front gate painting work and other allied work at Maurice Nagar, University of Delhi]
[CEET-6900][2025_DU_875232_1]
|
Delhi University||Central Office - DU||Engineering - DU
|