1 |
01-Jul-2025 10:00 AM |
30-Jul-2025 11:00 AM |
01-Aug-2025 11:30 AM |
[Balance Periodic Renewal Work in km. 14.200 to 25.530 and 31.540 to 55.700 Total Length 35.480 km. on N.H. 30 (Old N.H. 221) Jagdalpur-Sukma Road on EPC mode in the state of Chhattisgarh on EPC Mode.]
[73/CE/NH/TC/44-40/2024 (3rd Call)][2025_MoRTH_866676_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
2 |
01-Jul-2025 09:00 AM |
11-Aug-2025 11:00 AM |
12-Aug-2025 11:00 AM |
[CONSTRUCTION OF 2L - PS CONFIGURATION KARAULI BYPASS ON NH-23 UNDER ANNUAL PLAN 2024-25 ON EPC MODE IN THE STATE OF RAJASTHAN (JOB NO. NH-23/RJ/2024-25/865)]
[NIT 05/2025-26 CE (NH) PWD Rajasthan Jaipur][2025_MoRTH_866774_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH||National Highway Rajasthan PWD-Jaipur - MoRTH |
3 |
01-Jul-2025 09:00 AM |
11-Aug-2025 11:00 AM |
12-Aug-2025 11:00 AM |
[CONSTRUCTION OF 2L PS CONFIGURATION GANGAPUR CITY BYPASS ON NH-23 UNDER ANNUAL PLAN 2024-25 ON EPC MODE IN THE STATE OF RAJASTHAN (JOB NO. NH-23/RJ/2024-25/866)]
[NIT 07/2025-26 CE (NH) PWD Rajasthan Jaipur][2025_MoRTH_866621_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH||National Highway Rajasthan PWD-Jaipur - MoRTH |
4 |
30-Jun-2025 06:55 PM |
14-Aug-2025 11:00 AM |
19-Aug-2025 11:30 AM |
[Balance Works of Rehabilitation and upgradation of NH-43 (New NH-30) from Km 162.120 to Km 173.500 length 11.380 Km. (Keshkal Bypass) 4-Lane with Paved shoulder in the State of Chhattisgarh under NHDP-IV through EPC.]
[72/CE/NH/TC/44-55/2025][2025_MoRTH_866407_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
5 |
30-Jun-2025 05:55 PM |
16-Jul-2025 03:00 PM |
17-Jul-2025 03:00 PM |
[TN No 06/2025-26/HDO/NH/Dt. 27.06.2025 ]
[TN No 06/2025-26/HDO/NH/Dt. 27.06.2025][2025_MoRTH_866698_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Chennai - MoRTH||NH Division-Madurai - MoRTH |
6 |
30-Jun-2025 03:30 PM |
14-Aug-2025 11:00 AM |
18-Aug-2025 12:30 PM |
[Consultancy Services for Authority Engineer for supervision of Widening to 2-lane from existing chainage km. 74.700 to km. 100.660 Design chainage km 53.365 to km 78.785 on NH-507 in the State of Uttarakhand.]
[RO/UK/AP/2023-24/Barkot/01/AE][2025_MoRTH_866650_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH |
7 |
30-Jun-2025 03:30 PM |
14-Aug-2025 11:00 AM |
18-Aug-2025 12:30 PM |
[Consultancy Services for Authority Engineer for supervision of Rehabilitation and Up-gradation from single lane to two lanes with paved shoulder from existing Km 195.175 to Km 220.00 Design Chainage from Km 71.300 to Km 95.947 Paligad to Jankichatti ]
[NH-134-UR-2017-18-524-2(AE)][2025_MoRTH_866664_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH |
8 |
30-Jun-2025 02:00 PM |
28-Jul-2025 03:00 PM |
29-Jul-2025 03:00 PM |
[ Construction Supervision Cum Design Consultancy Services for Construction of 2 lane Major Bridge including approaches over Brahmaputra between Majuli on North Bank and Jorhat on South Bank(Job No 715/AS/2020-21/213).]
[RW/GHT/DP/AS/2020-21/213/234][2025_MoRTH_866658_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH |
9 |
30-Jun-2025 01:05 PM |
24-Jul-2025 03:00 PM |
25-Jul-2025 04:00 PM |
[PBMC Work in Km 115.000 to 141.050 of NH-333 for the year 2024-25]
[NIT NO. 05/2025-26][2025_MoRTH_866639_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Patna - MoRTH||NH Division-Lakhisarai - MoRTH |
10 |
27-Jun-2025 05:00 PM |
11-Aug-2025 05:00 PM |
12-Aug-2025 05:05 PM |
[Consultancy services for AE for Supervision of Construction of missing link from Birhu to Lathiani into 4 lane from km 35.550 to km 42.800 on NH-503A including Cable Stayed Bridge (0.860 km) in Himachal Pradesh on EPC Mode.]
[No. PIU-HMR/BL/11/AE/2025-26/476][2025_MoRTH_866452_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Shimla - MoRTH |
11 |
27-Jun-2025 05:00 PM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:30 AM |
[Short term maintenance works and activities (STMC) from section Dheka to Banari km. 151.450 to 160.687 Total Length 9.237 Km (2 Lane Section) on NH-49 (Old NH-200) in the State of Chhattisgarh.]
[64/CE/NH/TC/44-47/2025][2025_MoRTH_866061_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
12 |
27-Jun-2025 05:00 PM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:30 AM |
[Short Term Maintenance works and activities (STMC) on section from Km 331.000 to 363.000 of Katni Gumla Road N.H 43 in the state of Chhattisgarh.]
[66/CE/NH/TC/44-49/2025][2025_MoRTH_866063_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
13 |
27-Jun-2025 05:00 PM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:30 AM |
[Short term maintenance works and activities (STMC) from section Dheka to Banari km. 127.500 to 151.450 Total Length 23.950 Km (4 Lane Section) on NH-49 (Old NH-200) in the State of Chhattisgarh.]
[63/CE/NH/TC/44-46/2025][2025_MoRTH_866060_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
14 |
27-Jun-2025 05:00 PM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:30 AM |
[Short term maintenance to Ratanpur-Kenda-Keonchi-Road section of NH-45 from Km 273.200 to Km 278.750 Total Length 5.550 Km. in the state of Chhattisgarh.]
[65/CE/NH/TC/44-48/2025][2025_MoRTH_866062_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
15 |
27-Jun-2025 05:00 PM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:30 AM |
[Short Term Maintenance works and activities (STMC) on section from Km 363.000 to 373.500 of Katni-Gumla Road N.H-43 in the state of Chhattisgarh.]
[67/CE/NH/TC/44-50/2025][2025_MoRTH_866064_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
16 |
27-Jun-2025 05:00 PM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:30 AM |
[Short Term Maintenance works and activities on section from Km 433.850 to Km 437.670 of Katni - Gumla Road NH -43 (Old NH -78) in the state of Chhattisgarh.]
[69/CE/NH/TC/44-52/2025][2025_MoRTH_866066_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
17 |
27-Jun-2025 05:00 PM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:30 AM |
[Short term maintenance contract (STMC) of road from Km.375.600 to 385.700 of NH-43 and Km.215.800 to 216.700 of NH-130.]
[68/CE/NH/TC/44-51/2025][2025_MoRTH_866065_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
18 |
27-Jun-2025 05:00 PM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:30 AM |
[Short term maintenance contract (STMC) of road from Km.465.00 to 468.500 of Katni-Gumla Road N.H-43 in the state of Chhattisgarh.]
[70/CE/NH/TC/44-53/2025][2025_MoRTH_866067_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
19 |
27-Jun-2025 05:00 PM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:30 AM |
[Short Term Maintenance works and activities on section from Km 481.800 to km 482.500 (Ludeg), km 501.945 to km 502.590 (Kansabel), km 526.113 to km 530.090 (Kunkuri) Total length km 5.222 of Katni-Gumla Road N.H-43 in the state of Chhattisgarh.]
[71/CE/NH/TC/44-54/2025][2025_MoRTH_866068_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
20 |
27-Jun-2025 05:00 PM |
31-Jul-2025 03:00 PM |
01-Aug-2025 04:00 PM |
[Engagement of consultancy services to assist in the field of Transport Policy, Motor Vehicle Regulations, Automotive Industry Standards and matters related to Road Safety.]
[RT-11036/14/2024-MVL][2025_MoRTH_866499_1]
|
Ministry of Road Transport and Highways||MVL - MoRTH |
21 |
27-Jun-2025 03:00 PM |
11-Aug-2025 03:00 PM |
12-Aug-2025 03:00 PM |
[CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of 4 lane with PS Idar-Badoli bypass section from Design chainage km 81.300 to 95.500 of NH-168G in the state of Gujarat ,Total Length 14.2 Km, on EPC mode]
[RW- AE -2025-26-NH-168G-Pkg-II][2025_MoRTH_866454_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Gandhinagar - MoRTH |
22 |
27-Jun-2025 03:00 PM |
30-Jul-2025 03:00 PM |
31-Jul-2025 03:00 PM |
[Short term maintenance of NH-42 from km 137/500 to Km 159/100 of Uravakonda-Krishnagiri road in (RnB) NH Division Ananthapuramu in the state of Andhra Pradesh]
[NIT. No 03/STMC/SE.NH.ATP/2025-26, dt.25.06.2025][2025_MoRTH_866271_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
23 |
27-Jun-2025 03:00 PM |
30-Jul-2025 03:00 PM |
31-Jul-2025 03:00 PM |
[Short Term Maintenance of NH-40 from Km. 300/200 to Km. 337/700 of Kurnool-Ranipet Road in (RnB) NH Division Chittoor in the State of Andhra Pradesh]
[NIT. No.07/STMC/SE.NH.ATP/2025-26, dt.25.06.2025][2025_MoRTH_866378_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
24 |
27-Jun-2025 03:00 PM |
30-Jul-2025 03:00 PM |
31-Jul-2025 03:00 PM |
[Short term maintenance of NH-42 from Km. 300/000 to Km. 341/000 of Uravakonda-Krishnagiri road in (RnB) NH Division Chittoor in the state of Andhra Pradesh]
[NIT. No 04/STMC/SE.NH.ATP/2025-26, dt.25.06.2025][2025_MoRTH_866370_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
25 |
27-Jun-2025 03:00 PM |
30-Jul-2025 03:00 PM |
31-Jul-2025 03:00 PM |
[Short Term Maintenance of NH-42 from Km.341/000 to Km.382/080 of Uravakonda-Krishnagiri road in (RnB) NH Division Chittoor in the State of Andhra Pradesh]
[NIT. No 05/STMC/SE.NH.ATP/2025-26, dt.25.06.2025][2025_MoRTH_866374_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
26 |
27-Jun-2025 03:00 PM |
30-Jul-2025 03:00 PM |
31-Jul-2025 03:00 PM |
[Short Term Maintenance of NH-40 from Km. 250/000 to Km. 299/850 of Kurnool-Ranipet Road in (RnB) NH Division Chittoor in the State of Andhra Pradesh]
[NIT. No.06/STMC/SE.NH.ATP/2025-26, dt.25.06.2025][2025_MoRTH_866377_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
27 |
26-Jun-2025 05:00 PM |
17-Jul-2025 03:00 PM |
18-Jul-2025 03:00 PM |
[Consultancy Services for DPR to mitigate the bottlenecks from Punjab/UT border near Zirakpur flyover to Poultry Farm chowk including de-congestion of old Airport chowk, Halo Majra T-Point and Poultry Farm chowk on NH-05 (3Km, 6Lane)]
[RW/CH/W(27)UT/CHD/2025/26.6.25][2025_MoRTH_866279_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Chandigarh - MoRTH |
28 |
26-Jun-2025 03:00 PM |
06-Aug-2025 11:00 AM |
08-Aug-2025 03:30 PM |
[Consultancy services for Authoritys Engineer for Supervision of Work of Up-gradation and Construction to 2L with PS of Chanderi-Pichhore road section of NH-346, Design Length-55.150 Chanderi link bypass in the State of Madhya Pradesh]
[CE-RO/BHP/Tender/AE/08/2025-26][2025_MoRTH_866227_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH |
29 |
26-Jun-2025 03:00 PM |
06-Aug-2025 11:00 AM |
08-Aug-2025 03:30 PM |
[Consultancy services for Authoritys Engineer for Supervision of Work of Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2lane with paved shoulders in the State of Madhya Pradesh on EPC Mode]
[CE-RO/BHP/Tender/AE/07/2025-26][2025_MoRTH_866193_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Division-Bhopal - MoRTH |
30 |
26-Jun-2025 03:00 PM |
28-Jul-2025 05:00 PM |
29-Jul-2025 05:00 PM |
[Maintenance of NH 30A from Km 0.00 to Km 71.774 for the year 2024_25 on PBMC Mode in the state of Bihar.]
[NH/BIHARSHARIF/PBMC/05/2025-26][2025_MoRTH_866267_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Patna - MoRTH||NH Division-Biharsharif - MoRTH |
31 |
25-Jun-2025 06:30 PM |
09-Aug-2025 11:00 AM |
11-Aug-2025 11:00 AM |
[Work of one time treatment of bypassed portion of Dharuhera town on NH 919, Ch Km 17.700 to 19.700 and Ch. 20.000 to Ch. 22.530 falling in Haryana State.]
[PWD/PD1GGN/25.06.2025-Dhruhera][2025_MoRTH_866173_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Chandigarh - MoRTH||NH Chandigarh PWD-NH-Section-Chandigarh - MoRTH |
32 |
25-Jun-2025 06:30 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance to NH-329(A), (Diphu- Dhansiri-Dimapur Road) from Ch-0.000 km to 37.000 km of Diphu- Dhansiri- Dimapur Portion, (Total Length 37.000 km) of NH-329(A), under Bakulia NH Division Diphu, in the state of Assam]
[BRD/RD/35/2025/3][2025_MoRTH_866153_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
33 |
25-Jun-2025 06:30 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance of NH-627, (Sangbar to Khobak) from Km-168.00 to 211.00 (Total Length 43.00 km) of NH-627, under Bakulia NH Division Diphu, in the state of Assam for the Year 2025-26]
[BRD/RD/35/2025/3][2025_MoRTH_866184_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
34 |
25-Jun-2025 06:30 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance to NH-627, (Kheroni Chariali to Umrangso Road) from Ch-90.00 to 148.000, (Total Length 58.00 km) of NH-627, under Bakulia NH Division Diphu, in the state of Assam for the Year 2025-26]
[BRD/RD/35/2025/3][2025_MoRTH_866176_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
35 |
25-Jun-2025 06:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance of NH-627, (Dharamtul to Gaspara) from Km-0.00 to Km-16.00 Total Length 16.00 km of NH-627, under Bakulia NH Division Diphu, in the state of Assam for the Year 2025-26]
[BRD/RD/35/2025/3][2025_MoRTH_866091_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
36 |
25-Jun-2025 06:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance to NH-627, (Hakram to Kheroni Chariali Road) from Ch-62.900 to 90.000, (Total Length 27.10 km) of NH-627, under Bakulia NH Division Diphu, in the state of Assam for the Year 2025-26]
[BRD/RD/35/2025/3][2025_MoRTH_866158_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
37 |
25-Jun-2025 06:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short term maintenance of NH- 627 (Umrangsho to Sangbar) from Ch. 148.00 to 168.00 (Total Length 20.00 Km) of NH- 627, under Bakulia NH Division, Diphu, in the state of Assam for the year 2025-26]
[BRD/RD/35/2025/3][2025_MoRTH_866141_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
38 |
25-Jun-2025 06:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance of NH-627, (Gaspara to Hakram) from Km-16.00 to Km-22.00 and Km- 31.00 to Km-62.900 (Total Length 38.90 km) of NH-627, under Bakulia NH Division Diphu, in the state of Assam for the Year 2025-26]
[BRD/RD/35/2025/3][2025_MoRTH_866142_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
39 |
25-Jun-2025 05:30 PM |
09-Aug-2025 11:00 AM |
11-Aug-2025 11:00 AM |
[Work of Sohna Realignment of Rewari Sohna Palwal road NH-919 (Old NH-71B) from km 47.100 to 49.350 in Sohna Hilly Portion on EPC mode in the State of Haryana.]
[PWD/PD1GGN/25.06.2025-Sohna Realignment][2025_MoRTH_866121_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Chandigarh - MoRTH||NH Chandigarh PWD-NH-Section-Chandigarh - MoRTH |
40 |
25-Jun-2025 05:00 PM |
12-Aug-2025 03:00 PM |
14-Aug-2025 03:00 PM |
[Improvement and Upgradation of NH-727A from Km 88.670 (Rampur bujurg) UP Border to Km 92.992 (Mairwa) Siwan for the year 2024_25 on EPC Mode.]
[01/EPC/NH CHAPRA/2025-26][2025_MoRTH_865915_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Patna - MoRTH||NH Division-Chapra - MoRTH |
41 |
25-Jun-2025 04:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance Contract(STMC) for the year 2025-26 to NH-15( km 17th , 27th (400m ), 50th (500 m), 81st ) ( Total Length 2.9 km) under P.W,D., Rangia NH Division ,Rangia in the state of Assam.]
[NHR.20/2025/3][2025_MoRTH_866104_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
42 |
25-Jun-2025 04:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance Contract(STMC) for the year 2024-25 to NH-715A(From km 93.13 to km 134.75) under P.W,D., Rangia NH Division ,Rangia in the state of Assam. (Length 41.62 Km)]
[NHR.20/2025/3][2025_MoRTH_866101_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
43 |
25-Jun-2025 04:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Maintenance works through STMC for the year 2025-26 from Km 0/000 to Km 21/853 (Paikan to Bajengdoba section) on NH-217 (New) / NH-51 (Old) (Total length 21.853Km.) under PWD, Guwahati NH Division in the state of Assam.]
[NHR.20/2025/3][2025_MoRTH_866089_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
44 |
25-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance to NH-17(New) / NH-31(old) (Total length of the project 49.000 km) under Abhayapuri Construction Division, Abhayapuri in the state of Assam.]
[NHR.20/2025/3][2025_MoRTH_866036_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
45 |
25-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Maintenance works through STMC from Km 54/000 to Km 80/900 (Doulasal to Barpeta town section) on NH-427 (Total length 26.90 Km) under PWD, Guwahati NH Division in the state of Assam]
[NHR.20/2025/3][2025_MoRTH_866069_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
46 |
25-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance Contract to NH-117 A for the year 2025-26 from Chainage 0/000 to Chainage 24/600 (length 24.600 Km) under Abhayapuri Construction Division, Abhayapuri in the state of Assam]
[NHR.20/2025/3][2025_MoRTH_866017_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
47 |
25-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance Contract to NH-127 C for the year 2025-26 from Chainage 0.00 to Chainage 15.00 (length 15.00 Km) under Abhayapuri Construction Division, Abhayapuri in the state of Assam.]
[NHR.20/2025/3][2025_MoRTH_866030_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
48 |
25-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Maintenance by Short term Maintenance Contract (STMC) from Km134.264 to Km146.227 (VIP Junction to Jalukbari Junction) on NH-17, (Total length 11.963 Km) under PWD, Guwahati NH Division for the year 2025-26]
[NHR.20/2025/3][2025_MoRTH_866074_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
49 |
25-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Maintenance works through STMC for the year 2024-25 from Km 0/000 to Km 54/000 (Amingaon to Doulasal section) on NH-427 (Total length 54 Km.) under PWD, Guwahati NH Division in the state of Assam under Annual Plan 2025-26.]
[NHR.20/2025/3][2025_MoRTH_866078_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
50 |
25-Jun-2025 01:50 PM |
02-Jul-2025 04:00 PM |
03-Jul-2025 04:30 PM |
[Engagement of manpower in the office of SLAO, NHAI, Tumkur for land Acquisition in respect of MORTH approved National Highway projects in Tumkur district ]
[EE/NHD/TMK/AE/LA/Outsource staff/NIT/2025-26/01/164][2025_MoRTH_862083_2]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Bangalore - MoRTH||NH Division-Tumkur - MoRTH |
51 |
25-Jun-2025 01:00 PM |
10-Jul-2025 05:30 PM |
14-Jul-2025 03:30 PM |
[Balance work on risk And cost of the contractor under Construction of Major High-level Bridge across Panvel-Mahad-Panjim road NH-66 (old-17) at Km 91/400 God River, Km 94/400 Kal River And Km 161/400 Choradi river on NH-66 in Raigad district in the ]
[NIT No. 04/EENHD/PEN/1133/2025-26 ][2025_MoRTH_859350_2]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Pen - MoRTH |
52 |
25-Jun-2025 01:00 PM |
10-Jul-2025 05:30 PM |
14-Jul-2025 03:30 PM |
[Balance work on risk And cost of the contractor under Construction of Major High-level Bridge across Panvel-Mahad-Panjim road NH-66 (old-17) at Km 91/400 God River, Km 94/400 Kal River And Km 161/400 Choradi river on NH-66 in Raigad district in the s]
[NIT No. 03/EENHD/PEN/1132/2025-26][2025_MoRTH_859318_2]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Pen - MoRTH |
53 |
25-Jun-2025 09:40 AM |
16-Jul-2025 11:00 AM |
17-Jul-2025 11:00 AM |
[Raising and Strengthing of Sunam Dharamgarh Jekhepal (ODR_10) under CRIF Scheme ]
[Bid No 23 Dt. 24-06-2025][2025_MoRTH_865997_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Chandigarh - MoRTH||Provl Division - MoRTH |
54 |
24-Jun-2025 06:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Maintenance of Works through STMC of NH-702 from Km.0/000 (Namtola) to Km.10/600 (Sonari) (Total length 10.600 Km.) under PWD Jorhat NH Division, Jorhat in the state of Assam for the year 2025-26.]
[NHR.20/2025/3][2025_MoRTH_865965_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
55 |
24-Jun-2025 06:00 PM |
24-Jul-2025 11:00 AM |
30-Jul-2025 01:00 PM |
[One Time Improvement of NH39 from Km 172.900 Jotsoma Bypass junction to km 185.540 Lerie welcome gate length 12.64 km under PWD NH Division I Kohima in the state of Nagaland]
[CE/NH/NH(O)/2024-25/128][2025_MoRTH_865877_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||NH Division-Kohima - MoRTH |
56 |
24-Jun-2025 06:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Maintenance of Works through STMC of NH-702 from Ch.10/600 (Shiv Mandir, Sonari) to Ch.28/010 (Junction with NH-215 at Sapekhati Chariali) (Total length 17.410 Km.) under PWD Jorhat NH Division, Jorhat in the state of Assam for the year 2025-26.]
[NHR.20/2025/3][2025_MoRTH_865920_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
57 |
24-Jun-2025 05:30 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[Short Term Maintenance Contract (STMC) of Road from Km. 25.530 to Km 31.540 and Km. 55.700 to 57.000 (Jagdalpur Sukma Konta Road) Total Length 7.31 Km. of NH 30 in the State of Chhattisgarh.]
[59/CE/NH/TC/44-42/2025][2025_MoRTH_864867_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
58 |
24-Jun-2025 05:30 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[Short Term Maintenance Contract (STMC) of Road from Km 146.000 to 184.800 of NH 30 (Jagdalpur Sukma Konta Road).]
[62/CE/NH/TC/44-45/2025][2025_MoRTH_864870_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
59 |
24-Jun-2025 05:30 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[Short Term Maintenance Contract (STMC) of Road from Km 107.00 to 146.00 Of NH 30 (Jagdalpur Sukma Konta Road).]
[61/CE/NH/TC/44-44/2025][2025_MoRTH_864869_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
60 |
24-Jun-2025 05:30 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[Short Term Maintenance Contract (STMC) of Road from Km 14.200 to 25.530 and Km. 31.540 to 51.000 of NH 30 in the State of Chhattisgarh.]
[60/CE/NH/TC/44-43/2025][2025_MoRTH_864868_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
61 |
24-Jun-2025 05:00 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM 30.000 TO km 55.00 OF NH 63.]
[53/CE/NH/TC/44-36/2025][2025_MoRTH_864859_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
62 |
24-Jun-2025 05:00 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM. 205.000 to KM 216.400 (BHOPALPATNAM TO JAGDALPUR ROAD) AND KM. 224.620 TO 241.600 (JAGDALPUR TO DHANPUNJI ROAD) TOTAL LENGTH 28.38 KM. OF NH 63 IN THE STATE OF CHHATTISGARH.]
[57/CE/NH/TC/44-40/2025][2025_MoRTH_864865_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
63 |
24-Jun-2025 05:00 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[Short Term Maintenance Contract (STMC) of Road from Km 257.000 to 301.496 of NH 30 in the State of Chhattisgarh. (Total Length 44.496 Km.)]
[58/CE/NH/TC/44-41/2025][2025_MoRTH_864866_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
64 |
24-Jun-2025 05:00 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM. 155.000 to KM 205.000 (BHOPALPATNAM TO JAGDALPUR ROAD) TOTAL LENGTH 50.00 KM. OF NH 63 IN THE STATE OF CHHATTISGARH]
[56/CE/NH/TC/44-39/2025][2025_MoRTH_864864_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
65 |
24-Jun-2025 05:00 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM. 143.000 to KM 155.000 (BHOPALPATNAM TO JAGDALPUR ROAD) TOTAL LENGTH 12.00 KM. OF NH 63 IN THE STATE OF CHHATTISGARH]
[55/CE/NH/TC/44-38/2025][2025_MoRTH_864863_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
66 |
24-Jun-2025 05:00 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[Short term maintenance of Bhopalpatnam Jagdalpur Road in Km. 65.00 to 113.00 in the state of Chhattisgarh.]
[54/CE/NH/TC/44-37/2025][2025_MoRTH_864861_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
67 |
24-Jun-2025 05:00 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[Short Term Maintenance Contract (STMC) of Road from Km 0.000 to Km 30.00 of NH 63 in the state of Chhattisgarh.]
[52/CE/NH/TC/44-35/2025][2025_MoRTH_864857_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
68 |
24-Jun-2025 04:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Maintenance of Works to Newly declared NH-702C (Dhodar Ali) through STMC from Ch.126/700 (Garmur Chariali) to Ch.154/665 (Namtola Tiniali, Sonari)(L 27.965 Km.)(Design chainage Ch. 17/400 to Ch. 41/750 of NH-702C) under PWD, Jorhat NH Division]
[NHR.20/2025/3][2025_MoRTH_865906_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
69 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance Contract works of NH-315A (Non Forest Portion) of the stretches of NH-315A from Ch.0.000 Km (Tinsukia) to Ch. 18.000 Km (Tingrai Chariali and from Ch 36.100 Km (Naharkatia) to Ch 47.950 Km (Joypur) (Length 29.850 Km)]
[BRD/RD/35/2025/3][2025_MoRTH_865746_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
70 |
24-Jun-2025 02:00 PM |
25-Jul-2025 03:00 PM |
28-Jul-2025 03:00 PM |
[TN.No.05 2025-26 HDO NH Dt.23.06.2025]
[TN.No.05 2025-26 HDO NH Dt.23.06.2025][2025_MoRTH_865900_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Chennai - MoRTH||NH Division-Madurai - MoRTH |
71 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Maintenance under Short Term Mentenance Contract (STMC) from Km 0.000(Rajabari) to Km 23.650 (Assam Nagaland Border) on NH-702D (Total Length 23.650 Km) under PWD, Jorhat NH Division for the year 2025-26.]
[NHR.20/2025/3][2025_MoRTH_865897_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
72 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance Contract works of NH-215 (Trans Arunachal Highway) through STMC from Ch. 14.600 Km (Disang Bridge) to Ch. 63.400 Km (Barbaruah) ( Length 48.800) under PWD Dibrugarh NH Division in the state of Assam for the year 2025-26]
[BRD/RD/35/2025/3][2025_MoRTH_865723_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
73 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance through STMC to NH-15 from Km 421.950 (Lalung Tiniali) to Km 432.250 (Sissiborgaon) (Total Length 10.300 Km) under PWD Dibrugarh NH Division in the state of Assam for the year 2025-26]
[BRD/RD/35/2025/3][2025_MoRTH_865787_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
74 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance Contract (STMC) to Silchar Bypass (NH-53 (New NH-37)) from Km 0.000 to Km 12.750 (Total length 12.750 Km) for the year 2025-26 under P.W.D Sribhumi NH Division, Sribhumi in the state of Assam.]
[BRD/RD/35/2025/3][2025_MoRTH_865798_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
75 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance (STMC) to NH-154 from Km 3.500 to Km 18.800 , Km 26.000 to Km 35.400 and Km 47.000 to Km 52.000 (Total length 29.70 Km) for the year 2025-26 under P.W.D Sribhumi NH Division, Sribhumi in the state of Assam.]
[BRD/RD/35/2025/3][2025_MoRTH_865822_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
76 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance Contract (STMC) to NH-208A from Km 0.00 to Km 17.95 (Total length 17.95 Km) for the year 2025-26 under P.W.D Sribhumi NH Division, Sribhumi in the state of Assam.]
[BRD/RD/35/2025/3][2025_MoRTH_865812_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
77 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance to newly declared NH-715A along existing alignment from Km. 0.000 to Km. 22.720 (Design chainage from Km. 19.680 to Km. 42.400) (L 22.720 Km.) for the financial year 2025-26 under P.W.D Nagaon NH Division, Nagaon]
[BRD/RD/35/2025/3][2025_MoRTH_865856_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
78 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Maintenance of Works through STMC of NH-215(Old NH-52B) from Ch.268/280(Kanubari) to Ch.282/880(Rohan Pather,Desang RCC Bridge) (Total length 14.600 Km.) under PWD Jorhat NH Division, Jorhat in the state of Assam]
[NHR.20/2025/3][2025_MoRTH_865878_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
79 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance to NH-715A from Km 00.000 to Km 19.680 (Length 19.680 Km) for the year 2025-26 under P.W.D Nagaon NH Division, Nagaon in the state of Assam.]
[BRD/RD/35/2025/3][2025_MoRTH_865867_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
80 |
24-Jun-2025 02:00 PM |
15-Jul-2025 02:00 PM |
16-Jul-2025 02:00 PM |
[Short Term Maintenance to NH-15 and NH-715 (old NH-37A) for the year 2025-26 under P.W.D Nagaon NH Division, Nagaon in the state of Assam]
[BRD/RD/35/2025/3][2025_MoRTH_865835_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Guwahati - MoRTH||National Highway ASSAM PWD-Guwahati - MoRTH |
81 |
24-Jun-2025 12:10 PM |
24-Jul-2025 03:00 PM |
25-Jul-2025 03:00 PM |
[Construction of link between already constructed three-legged elevated rotary on Amritsar Taran Taran road MDR103 to Amritsar Bhikhiwind Khemkaran road NH 354 in district Amritsar Punjab ic Construction of ROB near closed LC No C 11 at KM 701 Betwe]
[07 of 2025][2025_MoRTH_865860_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Chandigarh - MoRTH||NH Punjab PWD-Amritsar - MoRTH |
82 |
23-Jun-2025 04:00 PM |
05-Jul-2025 03:00 PM |
07-Jul-2025 03:00 PM |
[Providing road safety interventions on HyderabadThokapally via Srisailam road at stretched from Km 128 650 to Km 142 000 Km 146000 to Km 148000Km 149 000 to Km 156 000 Km 166000 to Km 167000 Km 171000 to Km 173000Km 174000 to Km 183950 Km 185500 to ]
[SE R and B NH HYD03 2025 26 Dt.20.06.2025][2025_MoRTH_865752_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Hyderabad - MoRTH||NH Division-Hyderabad - MoRTH |
83 |
23-Jun-2025 03:00 PM |
07-Jul-2025 03:00 PM |
08-Jul-2025 03:00 PM |
[Widening of existing Culvert and Construction of new culvert on NH-09(Old NH-125) from Km- 121.700 to 129.450 (Champawat Aabadi Portion), Km 136.320 to km 142.00 (Lohaghat Aabadi Portion), Km 197.150 to km 202.00 (Pithoragarh Aabadi Portion), in the ]
[2263/12M-NH/2025 dt 21.06.2025][2025_MoRTH_865673_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH||NH Uttarakhand PWD-Haldwani - MoRTH |
84 |
21-Jun-2025 01:15 PM |
17-Jul-2025 04:00 PM |
18-Jul-2025 04:00 PM |
[Performance base Maintenance Contract between km 181/600 to 221/800 of NH-41 in the state of Gujarat. Sabharai to Naliya Section.]
[01 PBMC of 2025-26][2025_MoRTH_865592_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Gandhinagar - MoRTH||NH Division-Gandhidham - MoRTH |
85 |
21-Jun-2025 01:00 PM |
05-Aug-2025 04:00 PM |
06-Aug-2025 04:00 PM |
[Consultancy Services for Feasibility study and DPR preparation for Construction of 4 lane road from Kadapa to Rangampeta cross via Rayachoti pileru of NH 40 from Km 199.0 to Km 337.800 excluding Guvvalacheruvu Ghat Tunnel in the state of AP]
[RO/VJA/DPR F R/NH-40/2024-25][2025_MoRTH_865594_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH |
86 |
21-Jun-2025 12:00 PM |
05-Aug-2025 03:00 PM |
06-Aug-2025 03:00 PM |
[Consultancy Services for Feasibility study and DPR preparation for a.Upgradation to 4 lane of NH 42 Old NH 219 from Km 58 600 to 140 680 Palamaneru to Krishnagiri Border section and b.Formation of Bypass to Madanapalli town on NH42 in the state of AP]
[RO/VJA/DPR F R/NH-42/2024-25 ][2025_MoRTH_865479_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH |
87 |
20-Jun-2025 06:55 PM |
22-Jul-2025 03:00 PM |
23-Jul-2025 03:00 PM |
[TN.No.04 2025-26 HDO NH Dt.20.06.2025]
[TN.No.04 2025-26 HDO NH Dt.20.06.2025][2025_MoRTH_865580_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Chennai - MoRTH||NH Division-Madurai - MoRTH |
88 |
20-Jun-2025 06:45 PM |
21-Jul-2025 05:00 PM |
24-Jul-2025 03:00 PM |
[Emergent Restoration of superstructure and foundation of Gairganda Bridge including protection work at Chainage 2.200 kmp of NH-317 near Birpara, in the district of Alipurduar, West Bengal, during the year 2025-26. Phase- II]
[WBPW_Rd/SE/PIU-II/eNIB-4/25-26][2025_MoRTH_865585_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Kolkata - MoRTH||PIU-II Siliguri-MoRTH |
89 |
20-Jun-2025 06:30 PM |
04-Aug-2025 05:00 PM |
06-Aug-2025 11:00 AM |
[Rehabilitation and upgradation of Shegaon to Maharashtra-MP Border section of NH 161G from km 55-000 to km 118-000 (Length - 63.00 km) to 2LPS configuration in the state of Maharashtra on EPC mode]
[RO/MUM/TENDER/2025-26/02][2025_MoRTH_865540_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH |
90 |
20-Jun-2025 06:30 PM |
04-Aug-2025 05:00 PM |
06-Aug-2025 11:00 AM |
[Rehabilitation and upgradation of Patur-Balapur-Shegaon section of NH-161G from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (Total Length-49.600 km) to 4LPS configuration in the State of Maharashtra on EPC Mode]
[RO/MUM/TENDER/2025-26/01][2025_MoRTH_865528_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH |
91 |
20-Jun-2025 06:30 PM |
21-Jul-2025 05:00 PM |
24-Jul-2025 03:00 PM |
[Emergent Restoration work for approach and piers of Gairganda Bridge at Chainage 2.200 kmp of NH-317 near Birpara, in the district of Alipurduar, West Bengal, during the year 2025-26. Phase-I]
[WBPW_Rd/SE/PIU-II/eNIB-3/25-26][2025_MoRTH_865554_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Kolkata - MoRTH||PIU-II Siliguri-MoRTH |
92 |
20-Jun-2025 06:30 PM |
04-Aug-2025 05:00 PM |
06-Aug-2025 11:00 AM |
[Rehabilitation and upgradation of Armori to Gadchiroli section of NH 353C from km 77-900 to 114-800 to Four Lane standards in the state of Maharashtra on HAM Mode (Length -36.900 Km).]
[RO/MUM/TENDER/2025-26/03][2025_MoRTH_865553_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH |
93 |
20-Jun-2025 06:30 PM |
04-Aug-2025 05:00 PM |
06-Aug-2025 11:00 AM |
[Rehabilitation and Upgradation of Umred-Nagbhir Section from km 48-400 to 96-700 (excluding Bhiwapur city portion from km 68-370 to km 70-770 and RUB) of NH-353D to 4LPS configuration in the State of Maharashtra on HAM mode (total length-45. 834 km).]
[RO/MUM/TENDER/2025-26/04][2025_MoRTH_865564_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH |
94 |
20-Jun-2025 03:00 PM |
09-Jul-2025 03:00 PM |
10-Jul-2025 03:00 PM |
[Providing the Solar Blinkers and Street lights for poor illumination at the identified black spot 7Nos (1) AP-(05)-262, (2) IRAD ACCIDENT ID NO 202202014070002 (3) IRAD ACCIDENT ID NO 202302014640025 (4) AP-(05)-261 (5) AP-(05)-260 and (6) AP-(04)-23]
[02/SE.NH.ATP/2025-26, Dt.19.06.2025][2025_MoRTH_865374_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
95 |
20-Jun-2025 02:00 PM |
14-Jul-2025 03:00 PM |
15-Jul-2025 03:30 PM |
[Exterior Repair and Painting Work]
[IAHE/Adm/15/QuarterRep/2024-25][2025_MoRTH_865457_1]
|
Ministry of Road Transport and Highways||IAHE Noida - MoRTH |
96 |
20-Jun-2025 11:00 AM |
21-Jul-2025 12:00 PM |
22-Jul-2025 03:00 PM |
[Short Term Maintenance Work from km. 165.00 To 168, Km 170 and Km 171 on NH-707A]
[2263/13Yata-NH-10/2025 dt. 19.06.2025][2025_MoRTH_865282_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH||NH Uttarakhand PWD-NH-Section-Dehradun - MoRTH |
97 |
19-Jun-2025 06:00 PM |
01-Aug-2025 05:00 PM |
04-Aug-2025 11:00 AM |
[Construction of Foot Over Bridge (FOB) near Holy Shrine, Bambolim at Km 524.330 on NH-66 in the state of Goa on EPC Mode under Road safety Annual Plan 2023-24.]
[2025-26/PWD/WD VII (NH)/ASW/09][2025_MoRTH_865335_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||PWD / CE(NH)-Goa - MoRTH |
98 |
19-Jun-2025 04:10 PM |
31-Jul-2025 12:00 PM |
01-Aug-2025 12:30 PM |
[Construction of New Major Bridge over Purna River near Viraval between km 363/360 to km 364/360 of NH 64 in Navsari district in the state of Gujarat on Engineering Procurement and Construction EPC Mode]
[02 of 2025-26][2025_MoRTH_865283_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Gandhinagar - MoRTH||NH Division-Bharuch - MoRTH |
99 |
19-Jun-2025 02:00 PM |
05-Aug-2025 03:00 PM |
06-Aug-2025 04:00 PM |
[Reconstruction of Existing Major Bridge near Manik Nagar at Km.99.225 on NH 50 Bidar Humnabad Section in the State of Karnataka under annual Plan 2024 25 on EPC mode]
[RW/BNG /NH-13B/Km.99 225/90/2024][2025_MoRTH_865269_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Bangalore - MoRTH |
100 |
19-Jun-2025 11:00 AM |
21-Jul-2025 12:00 PM |
22-Jul-2025 03:00 PM |
[Short Term Maintenance (STMC) work of NH 507 from Chainage 0.000 to 12.435 in the state of Uttarakhand]
[2275/13Yata-NH-10/2025 dt. 18.06.2025][2025_MoRTH_865119_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH||NH Uttarakhand PWD-NH-Section-Dehradun - MoRTH |
101 |
19-Jun-2025 10:00 AM |
09-Jul-2025 05:30 PM |
11-Jul-2025 11:30 AM |
[STMC estimate from Km. 264.161 to 277.500 Km. of NH 55 in the State of Odisha for the Year 2024-25]
[02 CCE NH Northern of 2025 26][2025_MoRTH_865151_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-NH-Section-BHUBANESWAR - MoRTH |
102 |
18-Jun-2025 05:30 PM |
04-Aug-2025 05:30 PM |
06-Aug-2025 12:30 PM |
[Rehabilitation of Existing Distressed Road Section of Loni-Burhanpur on NH-347C in the State of Madhya Pradesh on EPC Mode]
[04/SAC/Tender/NH/IND/2025-26][2025_MoRTH_865075_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Madhya Pradesh PWD-Indore - MoRTH |
103 |
18-Jun-2025 05:30 PM |
30-Jul-2025 05:30 PM |
01-Aug-2025 12:30 PM |
[Construction of additional lanes to act as truck parking/lay bye in Sohagi Ghat stretch on Mangawan to MP/UP border section of NH-30 in the state of Madhya Pradesh on EPC mode]
[02/SAC/Sohagi/MPRDCL/2025-26][2025_MoRTH_864988_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||GM MPRDC-Bhopal - MoRTH |
104 |
18-Jun-2025 01:00 PM |
12-Jul-2025 05:30 PM |
14-Jul-2025 12:00 PM |
[Execution of Slope Protection work with construction of retaining wall work in Km 155.240 to Km 155.400 and 155.500 to 155.840, on Risk And Cost basis of Contractor under Rehabilitation And Upgradation of Kashedi Ghat section of NH-17 (NEW NH-66) to ]
[NIT No. 05/EENHD/PEN/ 1503 /2025-26 ][2025_MoRTH_864970_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Pen - MoRTH |
105 |
18-Jun-2025 09:00 AM |
03-Jul-2025 05:30 PM |
04-Jul-2025 05:30 PM |
[Construction of Overhead Pedestrin Bridege at Hiwra Aashram in ch.12.900 on Mehkar Chikhali Road (NH548CC) in the state of Maharashtra.]
[40/EENH/AKL/2024-25, Dt.17/01/2025][2025_MoRTH_845172_2]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
106 |
17-Jun-2025 06:30 PM |
30-Jul-2025 05:30 PM |
01-Aug-2025 12:30 PM |
[Up-gradation and Construction to 2L with PS of Chanderi-Pichhore road section of NH-346, from design Km 237.600 to Km 292.750 (Design Length-55.150 Chanderi link bypass) in the State of Madhya Pradesh]
[CE-RO/BHP/Tender/06/2025-26][2025_MoRTH_864978_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH |
107 |
17-Jun-2025 09:00 AM |
16-Jul-2025 05:30 PM |
18-Jul-2025 12:30 PM |
[Maintenance work from Km 0/000 to Km 57/25 (length 57.25 km) Sendhwa to Khetia section of NH-752G and from Km 34/56 to Km 36/00 (Length 1.44 Km) Anjad Thikri Road section of NH 347B under Short Term Maintenance Contract in the State of Madhya Pradesh]
[03/SAC/STMC/IND/2025-26][2025_MoRTH_864798_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Madhya Pradesh PWD-Indore - MoRTH |
108 |
16-Jun-2025 11:00 AM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short Term Maintenance contract STMC Estimate from km212700 to km253700 of NH326 in the State of Odisha for the year 202425]
[BID IDENTIFICATION NO. 04 /CCE NH, South of 2025-26][2025_MoRTH_864357_4]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Berhampur - MoRTH |
109 |
16-Jun-2025 11:00 AM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short Term Maintenance contract STMC Estimate from km429700 to km475900 of NH326 in the State of Odisha for the year 202425]
[BID IDENTIFICATION NO. 04 /CCE NH, South of 2025-26][2025_MoRTH_864357_2]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Berhampur - MoRTH |
110 |
16-Jun-2025 11:00 AM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short Term Maintenance contract STMC Estimate from km 327700 to km413700 of NH326 in the State of Odisha for the year 202425]
[BID IDENTIFICATION NO. 04 /CCE NH, South of 2025-26][2025_MoRTH_864357_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Berhampur - MoRTH |
111 |
16-Jun-2025 11:00 AM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short Term Maintenance contract STMC Estimate from km281700 to km311700 of NH326 in the State of Odisha for the year 202425]
[BID IDENTIFICATION NO. 04 /CCE NH, South of 2025-26][2025_MoRTH_864357_3]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Berhampur - MoRTH |
112 |
13-Jun-2025 06:00 PM |
23-Jul-2025 11:00 AM |
31-Jul-2025 03:00 PM |
[Construction of 4 Lane Bypass to Vellore Town starting from Km 47.400 of NH-75 and ending at km 12.650 of NH-38 (Length 20.492 km) in the state of Tamil Nadu.]
[NH-12014/20/2024/TN/South-II][2025_MoRTH_864543_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Chennai - MoRTH |
113 |
13-Jun-2025 02:00 PM |
24-Jul-2025 05:30 PM |
28-Jul-2025 05:30 PM |
[Rectification work under Risk and Cost for Rehabilitation and Up gradation of Pal Phata Phulambri Khultabad section of NH 752 H from Km. 137 758 to 105 700 Design Ch Km 46 440 to Km 78 358 on EPC Mode in the State of Maharashtra]
[EENHD/Chh.S./Tender/NIT No-3/3001254][2025_MoRTH_864361_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Aurangabad - MoRTH |
114 |
13-Jun-2025 11:30 AM |
07-Jul-2025 03:00 PM |
14-Jul-2025 11:00 AM |
[Improvements to East Coast Road from Km.136/905 (Ganapathichettikulam) to Km.150/535 (Rajiv Gandhi Square) on NH-332A under Annual Plan 2025-26 in the UT of Puducherry.]
[01/PW/NH/2025-26][2025_MoRTH_864432_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Chennai - MoRTH||NH Division- Puducherry - MoRTH |
115 |
11-Jun-2025 02:00 PM |
10-Jul-2025 12:00 PM |
11-Jul-2025 12:00 PM |
[Short term Maintenance Contract work for Ch- 46.220Km to 72.00 km of NH-727H in District Sitapur in the state of Uttar Pradesh]
[2164/808 YATA NH CIRCLE/25 DATED.10.06.2025][2025_MoRTH_864115_1]
|
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH||NH Circle Lucknow - MoRTH |
116 |
11-Jun-2025 12:00 PM |
28-Jul-2025 12:00 PM |
29-Jul-2025 03:00 PM |
[Protection work of Yamuna Bridge of Span 437.50 M at km. 13-14 on NH 123(507) Under Annual Plan 2025-26 in the state of Uttarakhand under EPC mode]
[2172/13Yata-NH-10/2025 dt. 10.06.2025][2025_MoRTH_864030_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH||NH Uttarakhand PWD-NH-Section-Dehradun - MoRTH |
117 |
11-Jun-2025 11:00 AM |
28-Jul-2025 12:00 PM |
29-Jul-2025 03:00 PM |
[Landslide Treatment work of 05 Locations CH.298.360-CH.298.750, CH.304.120-CH.304.350, CH.304.870-CH.305.050, CH.312.190-CH.312.230 and CH.333.000-CH.333.100 ON NH-07 (OLD NH-58) under EPC mode in the State of Uttarakhand under Annual Plan 2024-25]
[2171/13Yata-NH-10/2025 dt. 10.06.2025][2025_MoRTH_864092_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH||NH Uttarakhand PWD-NH-Section-Dehradun - MoRTH |
118 |
11-Jun-2025 11:00 AM |
28-Jul-2025 12:00 PM |
29-Jul-2025 03:00 PM |
[Landslide treatment work of 08 locations (ch. 238.750 km to 238.920 km, ch. 246.790 km to 246.850 km, ch. 247.340 km to 247.440 km, ch. 254.340 km to 254.410 km, ch. 261.550 km to 261.680 km, ch. 281.600 to ch. 281.925 km, ch. 283.250 km to 283.500 k]
[2170/13 Yata-NH-10/2025 dt. 10.06.2025][2025_MoRTH_864084_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH||NH Uttarakhand PWD-NH-Section-Dehradun - MoRTH |
119 |
11-Jun-2025 11:00 AM |
28-Jul-2025 12:00 PM |
29-Jul-2025 03:00 PM |
[Landslide treatment work on NH-58 (New 07) at Bachelikhal Ch. 279.400 to 279.600 (200 m length) and Chamdhar Ch.337.940 to 338.165 (225 m length) under EPC mode in the state of Uttarakhand under Annual Plan 2024-25]
[2169/13yata-NH-10/2025 dt. 10.06.2025][2025_MoRTH_864049_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH||NH Uttarakhand PWD-NH-Section-Dehradun - MoRTH |
120 |
11-Jun-2025 11:00 AM |
01-Jul-2025 05:30 PM |
03-Jul-2025 11:30 AM |
[Short term Maintenance Contract (STMC) estimate from km. 35.00 to km. 38.00, from Km. 45.00 to 50.00 Km. and from Km. 60.00 to 65.00 of NH 326A in the state of Odisha for the year 2024-25.]
[BID IDENTIFICATION NO. 04/EE NH DIVN., PKD of 2025-26][2025_MoRTH_863902_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Division-Paralakhemundi Odisha - MoRTH |
121 |
11-Jun-2025 09:00 AM |
08-Jul-2025 03:00 PM |
09-Jul-2025 03:00 PM |
[Performance Based Maintenance Contract Cost Estimate from Km. 92.025 to Km 158.060 of NH-76 in the State of Uttar Pradesh]
[604M/13M-NHCK/25 dated 09.06.2025][2025_MoRTH_864072_1]
|
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH||NH Division-Jhansi - MoRTH |
122 |
11-Jun-2025 09:00 AM |
21-Jul-2025 11:00 AM |
22-Jul-2025 11:00 AM |
[ONE TIME IMPROVEMENT OF RIDING QUALITY OF LEFT OUT PORTIONS OF NH-08 BEAWAR GOMTI PKG-1 JAWAJA (NEW KM 74/300 TO 76/900) AND BALACHARAT (NEW KM 101/300 TO 102/400) IN THE STATE OF RAJASTHAN ]
[NIT 06/2025-26 CE (NH) PWD Rajasthan Jaipur][2025_MoRTH_864102_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH||National Highway Rajasthan PWD-Jaipur - MoRTH |
123 |
10-Jun-2025 06:00 PM |
10-Jul-2025 12:00 PM |
11-Jul-2025 12:00 PM |
[Short term maintenance contract work for Ch-38.853km to 40.00km of NH-330D in district Sitapur in state of Uttar pradesh.]
[182/NIVIDA/2025-26 DATED 10.06.2025][2025_MoRTH_864051_1]
|
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH||NH DIVISION PWD SITAPUR |
124 |
10-Jun-2025 05:40 PM |
09-Jul-2025 03:00 PM |
11-Jul-2025 11:00 AM |
[Construction of LHS and its approaches in lieu of level crossing No.C-23/T-2 at km 221.050 on NH-65 (New NH-152) near Siwani town in the State of Haryana Reinvited]
[07-NH-2024/49189][2025_MoRTH_864059_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Chandigarh - MoRTH||NH Division-Rohatak - MoRTH |
125 |
10-Jun-2025 05:30 PM |
23-Jul-2025 05:30 PM |
25-Jul-2025 12:30 PM |
[Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode]
[CE-RO/BHP/Tender/05/2025-26][2025_MoRTH_863777_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Division-Bhopal - MoRTH |
126 |
10-Jun-2025 09:00 AM |
08-Jul-2025 11:00 AM |
16-Jul-2025 03:00 PM |
[Strengthening from Km 22/0 to 78/0 of NH-38 (Length54.223km) (Mangalore-Villupuram Road) on EPC mode in Tamil Nadu on EPC Basis Contract under Annual Plan 2024-2025 in Tamil Nadu (Job No. NH-38-TN-2024-25-1039]
[TN.No.04/2025-26/Dt.09.06.2025][2025_MoRTH_863882_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Chennai - MoRTH||NH Division- Chennai - MoRTH |
127 |
09-Jun-2025 06:00 PM |
23-Jul-2025 03:00 PM |
24-Jul-2025 05:00 PM |
[Consultancy services for Construction of Jharsuguda Bypass including ROB including land acquisition on NH-49 from km 258.636 to km 283.300 design chainage 258.636 to km 289.876 in the state of Odisha.]
[01-ROBBSR-2025-26-AE][2025_MoRTH_863825_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH |
128 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Lada Sarli section of Frontier Highway NH-913 Lada to Bameng 0 000 to 43 65 43 65 km]
[RW/NH-913/FH/AE/Tender/25-26/3][2025_MoRTH_863528_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
129 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Bomdila 9th Mile Nafra Lada section of Frontier Highway NH 913 9th mile Nafra 19 554 to 70 00 50.446 km]
[RW/NH-913/FH/AE/Tender/25-26/1][2025_MoRTH_863472_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
130 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Bomdilla 9th Mile Nafra Lada section of Frontier Highway NH 913 Dishum Sachung Lada 70 00 to 167 75 97 75km]
[RW/NH-913/FH/AE/Tender/25-26/2][2025_MoRTH_863518_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
131 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 km 160.750 to km 209.9 49.15 km]
[RW/NH-913/FH/AE/Tender/25-26/9][2025_MoRTH_863584_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
132 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Taliha to Tato section of Frontier Highway NH 913 km 0.00 to 60.25 60.25km]
[RW/NH913/FH/AE/Tender/25-26/10][2025_MoRTH_863597_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
133 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Taliha to Tato section of Frontier Highway NH-913 km 87.13 to 121.541 34.411km]
[RW/NH913/FH/AE/Tender/25-26/11][2025_MoRTH_863623_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
134 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Bile Migging section of Frontier Highway NH 913 km 0.00 from Migging end to 17.812 17.812 km km 17.812 to 55.377 Migging end 37.565 km km 0.000 at Bile end to]
[RW/NH913/FH/AE/Tender/25-26/12][2025_MoRTH_863630_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
135 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 from km 113.25 to 160.75 47.500 km]
[RW/NH913/FH/AE/Tender/25-26/13][2025_MoRTH_863634_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
136 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Kharsang Miao Vijaynagar section of Frontier Highway NH 913 km 0.000 to 81.400 81.400km]
[RW/NH913/FH/AE/Tender/25-26/14][2025_MoRTH_863641_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
137 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Kharsang Miao Vijaynagar section of Frontier Highway NH 913 km 81.400 to 156.095 74.695km]
[RW/NH913/FH/AE/Tender/25-26/15][2025_MoRTH_863648_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
138 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 from km 55.725 to 113.25 57.525 km]
[RW/NH-913/FH/AE/Tender/25-26/8][2025_MoRTH_863580_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
139 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Huri Taliha section of Frontier Highway NH 913 Huri Parsi Palo km 0.00 to 55.725 55.725 km]
[RW/NH-913/FH/AE/Tender/25-26/7][2025_MoRTH_863573_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
140 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 koloriang to Sarli km 168.0 to 183.40 15.40 km and Sarli to Huri km 0.00 to 78.38 78.38km]
[RW/NH-913/FH/AE/Tender/25-26/6][2025_MoRTH_863559_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
141 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 Khenewa to Koloriang 85.60 to 168.00 km 82.400 km]
[RW/NH-913/FH/AE/Tender/25-26/5][2025_MoRTH_863548_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
142 |
07-Jun-2025 11:00 AM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:00 AM |
[Consultancy services for Authoritys Engineer for Supervision of Construction of road from Lada Sarli section of Frontier Highway NH-913 Bameng Khenewa 43 65 to 85 60 41 950 km]
[RW/NH-913/FH/AE/Tender/25-26/4][2025_MoRTH_863537_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH||RO Itanagar - MoRTH |
143 |
06-Jun-2025 06:00 PM |
22-Jul-2025 03:00 PM |
23-Jul-2025 03:30 PM |
[Consultancy Services for Preparation of DPR for Widening to 4Lane from Km 35.00 to Km 66.275 from Nalagarh to Swarghat of NH 105 and Spur in the State of HP.]
[RO/HP/Works (340)/2024-25 (Comp. No. 246879)][2025_MoRTH_863599_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Shimla - MoRTH |
144 |
06-Jun-2025 06:00 PM |
07-Jul-2025 11:00 AM |
08-Jul-2025 11:30 AM |
[Widening and Strengthening of stretch from km 63.000 to 74.000 of NH.305 in the available RoW edge to edge in the State of Himachal Pradesh]
[PW-CE-NH-CTR-Tender Notice/EPC-65/2025- 1083-90 ][2025_MoRTH_863561_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Shimla - MoRTH||Circle Shahpur - MoRTH |
145 |
06-Jun-2025 05:30 PM |
08-Jul-2025 05:30 PM |
10-Jul-2025 12:30 PM |
[Maintenance work from Km11/2 to Km 13/6 (Length 2.40 KM) section of NH 86Ext under Short Term Maintenance Contract in the State of Madhya Pradesh]
[02/SAC/STMC/BPL/2025-26][2025_MoRTH_863486_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Madhya Pradesh PWD-PWD-NH Sagar - MoRTH |
146 |
06-Jun-2025 02:00 PM |
03-Jul-2025 04:00 PM |
04-Jul-2025 04:00 PM |
[Construction of Balanced work of 2 Lane H.L. RCC Bridge with its Approaches from CH 0.000 to 2.150 KM across river sone in the State of Bihar (Via Panduka) and Jharkhand under CRIF Scheme on EPC Mode.]
[BRPNNL-WD-ARA/2025/537][2025_MoRTH_863490_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Patna - MoRTH||S.P.E WD. ARA BRPNNLtd - MoRTH |
147 |
04-Jun-2025 06:00 PM |
14-Jul-2025 03:00 PM |
15-Jul-2025 04:00 PM |
[One time Improvement from Km 26.800 to Km 28.000 of NH-104 (New NH-227) ( Total length 1.300 Km) for the FY 2023_24 in State of Bihar.]
[01/NH/SITAMARHI/PBMC/2025-26][2025_MoRTH_863195_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Patna - MoRTH||NH Division-Sitamarhi - MoRTH |
148 |
04-Jun-2025 05:00 PM |
21-Jul-2025 03:00 PM |
22-Jul-2025 03:00 PM |
[Consultancy Services for Pre-Construction Activities and Preparation of Detailed Project Report for development of 2 Lane Alternate Route to Bypass Dabarkot Landslide Zone (from Km 75.950 to Km 80.750) on NH-134 in the State of Uttarakhand ]
[RO/UK/DPR/Ojaree/2025][2025_MoRTH_863159_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH |
149 |
04-Jun-2025 04:00 PM |
09-Jul-2025 03:00 PM |
11-Jul-2025 11:00 AM |
[W.S. of 2 Lane to 4 Lane with divided Carriageway From Ch 67.471 (Mathurapur) to Ch 69.256 (MuktapurROB) and Construction of H.L RCC Bridge(8x24.00m) Over River Budhi Gandak in place of Old Damaged Screw Pile Bridge at Near Magardahi Ghat of NH 322.]
[02/NH/Samastipur/EPC/2025-26][2025_MoRTH_862778_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Patna - MoRTH||NH Division- Samastipur - MoRTH |
150 |
04-Jun-2025 03:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance to Raipur-Durg Service Lane Road section of NH-53 from Km 281.00 to Km 307.600(Total lenghth-36.800) in the state of Chhattisgarh.]
[47/CE/NH/TC/44-30/2025][2025_MoRTH_862937_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
151 |
04-Jun-2025 03:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance of Raigarh-Sarangarh-Saraipali road section of NH-216 (New 153) from km 25.600 to 27.900 and Km 30.00 To 31.160 (3.460 Km) in the state of Chhattisgarh.]
[49/CE/NH/TC/44-32/2025][2025_MoRTH_862939_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
152 |
04-Jun-2025 03:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance of Raigarh-Sarangarh-Saraipali road section of NH-216(New 153) from Km 31.160 to Km 43.480(12.32 Km) in the state of Chhattisgarh.]
[50/CE/NH/TC/44-33/2025][2025_MoRTH_862940_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
153 |
04-Jun-2025 03:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance of Raigarh-Sarangarh-Saraipali road section of NH-216(New 153) from Km 43.480 to Km 54.840 (11.360 Km) in the state of Chhattisgarh.]
[51/CE/NH/TC/44-34/2025][2025_MoRTH_862941_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
154 |
04-Jun-2025 03:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance of Raigarh-Sarangarh-Saraipali road section of NH-216(New 153) from Km 3.800 to Km. 25.600(21.8Km) in the state of Chhattisgarh. ]
[48/CE/NH/TC/44-31/2025][2025_MoRTH_862938_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
155 |
03-Jun-2025 06:45 PM |
08-Jul-2025 05:30 PM |
10-Jul-2025 12:30 PM |
[Maintenance work from Km 0/000 to Km 49/985 (length 49.985 km) Dhar to Gujri section section of NH-347C under Short Term Maintenance Contract in the State of Madhya Pradesh]
[02/SAC/STMC/IND/2025-26][2025_MoRTH_863052_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Madhya Pradesh PWD-Indore - MoRTH |
156 |
03-Jun-2025 04:20 PM |
02-Jul-2025 03:00 PM |
04-Jul-2025 03:00 PM |
[Widening of service road in Mettupalayam side approach of Periyanaickenpalayam flyover including Land Acquisition from Km.31/600 to 32/000 of NH-181 (Coimbatore - Ootty - Gundlupet Road) - on EPC Basis Contract Under Annual Plan 2024-25 in the Stat]
[TNNo6/HDO/NH/25-26/Dt3.6.25 ][2025_MoRTH_862981_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Chennai - MoRTH||NH Division-Salem - MoRTH |
157 |
02-Jun-2025 05:00 PM |
16-Jul-2025 05:00 PM |
17-Jul-2025 05:00 PM |
[One Time Improvement of bypassed stretches of the towns Chundi, Voletivaripalem, Badevaripalem and Kandukur from Km. 143.320 to Km.189.050 of NH 167B in the State of Andhra Pradesh on EPC mode]
[SENHVJA/07/2025-26 Dated.30.05.2025][2025_MoRTH_862571_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
158 |
02-Jun-2025 05:00 PM |
16-Jul-2025 05:00 PM |
17-Jul-2025 05:00 PM |
[One Time Improvement of bypassed stretch of Pamuru Town from Km. 109.950 to Km. 116.750 of NH 167B in Prakasam District in the State of Andhra Pradesh on EPC mode]
[SENHVJA/06/2025-26 Dated.30.05.2025][2025_MoRTH_862563_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
159 |
02-Jun-2025 05:00 PM |
16-Jul-2025 05:00 PM |
17-Jul-2025 05:00 PM |
[One Time Improvement of bypassed stretches of the towns Seetharampuram, Chinanagampalli, Kothapalli, Ayyalurivaripalli, DG Peta and CS Puram from Km. 58/635 to Km. 99/409 of NH 167B in the State of Andhra Pradesh on EPC mode]
[SENHVJA/05/2025-26 Dated.30.05.2025][2025_MoRTH_862550_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
160 |
02-Jun-2025 05:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance contract (STMC) of road from km 0.000 to 10.900 of NH 130B and 4.325 to 10.000 of NH 30.]
[38/CE/NH/TC/44-21/2025][2025_MoRTH_862688_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
161 |
02-Jun-2025 05:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance to Raipur-Balodabazar-Sarangarh Road section of NH-130B from Km 86.000 to Km 133.300 in the state of Chhattisgarh.]
[41/CE/NH/TC/44-24/2025][2025_MoRTH_862691_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
162 |
02-Jun-2025 05:00 PM |
16-Jul-2025 05:00 PM |
17-Jul-2025 05:00 PM |
[One-time improvement to the Bypassed stretches of NH 216 from Km 50.100 to 51.040 (Yendapalli village limits), Km 51.761 to 52.421 (Penduru village limits), Km.63.800 to 65.000 (Machilipatnam town limits), Km 161.900 to Km 162.200 (Yazili Re]
[NIT No. SENHVJA/08/2025-26 Date.30.05.2025][2025_MoRTH_862591_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
163 |
02-Jun-2025 05:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM 0.000 TO km 30.600 OF NH 930.]
[43/CE/NH/TC/44-26/2025][2025_MoRTH_862693_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
164 |
02-Jun-2025 05:00 PM |
17-Jul-2025 11:00 AM |
18-Jul-2025 11:30 AM |
[Land Slide Mitigation including Slope Stabilization at Km 316.880 to Km 317.250 near Nigulsari and Km 330.350 to Km 330.560 near Nathpa on NH 05 in the State of Himachal Pradesh]
[PW-CE-NH-CTR-Tender Notice/EPC-73/2025-1012-19][2025_MoRTH_862785_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Shimla - MoRTH||Circle Shahpur - MoRTH |
165 |
02-Jun-2025 05:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance to Abhanpur Rajim Gariyaband Devbhog road section of NH 130 C from Km 40.400 to Km 61.800, Km 66.000 to 99.800 in the state of Chhattisgarh.]
[46/CE/NH/TC/44-29/2025][2025_MoRTH_862696_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
166 |
02-Jun-2025 05:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance to Ghodari Mahasamund Bagbahara Odissa Border Road section of NH353 from Km 0.000 to Km 65.900 in the state of Chhattisgarh.]
[44/CE/NH/TC/44-27/2025][2025_MoRTH_862694_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
167 |
02-Jun-2025 05:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance to Raipur-Balodabazar-Sarangarh Road section of NH-130B from Km 133.300 to Km 186.750 in the state of Chhattisgarh.]
[42/CE/NH/TC/44-25/2025][2025_MoRTH_862692_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
168 |
02-Jun-2025 05:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance to Raipur-Balodabazar-Sarangarh Road section of NH-130B from Km 10.900 to Km 51.900 in the state of Chhattisgarh.]
[39/CE/NH/TC/44-22/2025][2025_MoRTH_862689_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
169 |
02-Jun-2025 05:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance to Raipur Balodabazar Sarangarh Road section of NH130B from Km 51.900 to Km 86.000 in the state of Chhattisgarh.]
[40/CE/NH/TC/44-23/2025][2025_MoRTH_862690_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
170 |
02-Jun-2025 05:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance to Simga-Kawardha-Jabalpur Road section of NH-30 (12A) from Km 50.878 to Km 55.430 in the state of Chhattisgarh.]
[45/CE/NH/TC/44-28/2025][2025_MoRTH_862695_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
171 |
02-Jun-2025 05:00 PM |
16-Jul-2025 05:00 PM |
17-Jul-2025 05:00 PM |
[One Time Improvements of Bypassed Stretches of the towns Macherla from km 173.934 to km 177.924 Rentachintala from km .190.485 to km .194.578 and Gurazala from km 198.554 to km 204.170 of NH-167AD in the state of Andhra Pradesh for the year 2024-25]
[NIT No. SENHVJA/04/2025-26 Date.30.05.2025][2025_MoRTH_862506_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
172 |
02-Jun-2025 04:15 PM |
09-Jul-2025 05:00 PM |
10-Jul-2025 05:05 PM |
[Engaging an expert consultant for Preconstruction activities for forest diversion under FCA1980 with Demarcation of Center line and RoW including wildlife clearance and Land Acquisition for NH 130D from Km. 0.00 to 84.00 Section Alapalli To Gundenoo]
[03/EENH/GAD/2025-26][2025_MoRTH_862812_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Nagpur - MoRTH |
173 |
02-Jun-2025 03:30 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 12:30 PM |
[CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF UP-GRADATION OF PICHHORE-DINARA SECTION OF NH-346 FROM KM 292.750 TO 334.550 TO TWO LANE WITH PAVED SHOULDERS IN THE STATE OF MADHYA PRADESH ON EPC MODE.]
[14/SAC/NHGWL/2025-26][2025_MoRTH_862758_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||Cheif Engineer PWD-Bhopal - MoRTH |
174 |
02-Jun-2025 10:40 AM |
17-Jul-2025 11:00 AM |
18-Jul-2025 11:15 AM |
[Widening and upgradation of road from 2 lane with PS to 4 lane with PS for rectification of black spot ID PB 03 189 of series 2017 19 at location Km 159.550 Pakho Kalan on NH 703 in the State of Punjab including utility shifting and excluding GST]
[04][2025_MoRTH_862716_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Chandigarh - MoRTH||NH Punjab PWD-Patiala - MoRTH |
175 |
02-Jun-2025 10:00 AM |
17-Jul-2025 11:00 AM |
18-Jul-2025 11:00 AM |
[Widening and Strengthening of NH 148B from km. 226.370 to km. 234.900 i.e. from Tohana Haryana Border to Moonak Jakhal excluding stretch from km. 233.830 to km. 234.300 on EPC Mode in State of Punjab ]
[3][2025_MoRTH_862452_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Chandigarh - MoRTH||NH Punjab PWD-Patiala - MoRTH |
176 |
31-May-2025 02:00 PM |
14-Jul-2025 05:05 PM |
15-Jul-2025 05:05 PM |
[Performance based Maintenance Contracts PBMC Estimate of Rehabilitation and Up-gradation to two / four lane with paved shoulders from Amdi Junction to Saoner, from Km 226.140 to Km 265.724 Design Chainage of NH753 in the state of Maharashtra Total Le]
[NIT-07/EENH/NGP/2025-26][2025_MoRTH_862625_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
177 |
31-May-2025 01:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM. 210.000 to KM 254.000 (RAIPUR TO JAGDALPUR ROAD) TOTAL LENGTH 44.00 KM. OF NH-30 IN THE STATE OF CHHATTISGARH]
[37/CE/NH/TC/44-20/2025][2025_MoRTH_862486_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
178 |
31-May-2025 01:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM. 180.000 to KM 210.000 (RAIPUR TO JAGDALPUR ROAD) TOTAL LENGTH 30.00 KM. OF NH-30 IN THE STATE OF CHHATTISGARH]
[36/CE/NH/TC/44-19/2025][2025_MoRTH_862484_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
179 |
31-May-2025 01:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM. 105.000 to KM 130.000 (DHAMTARI - KANKER SECTION) TOTAL LENGTH 25.000 KM. OF NH-30 IN THE STATE OF CHHATTISGARH]
[35/CE/NH/TC/44-18/2025][2025_MoRTH_862483_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
180 |
31-May-2025 01:00 PM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM. 81.500 to KM 105.000 (DHAMTARI - KANKER SECTION) TOTAL LENGTH 23.500 KM. OF NH-30 IN THE STATE OF CHHATTISGARH.]
[34/CE/NH/TC/44-17/2025][2025_MoRTH_862481_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
181 |
31-May-2025 11:00 AM |
02-Jul-2025 03:00 PM |
03-Jul-2025 03:00 PM |
[Widening and improvements from ML to Dual Two lane divided carriageway with paved shoulder at km 90/0-92/900 of Thoppur- Mettur -Bhavani -Erode road (SH-20) including construction of storm water drain and construction of additional High Level Bridge ]
[TNNo5/HDO/NH/25-26/Dt30.5.25 ][2025_MoRTH_862567_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Chennai - MoRTH||NH Division-Salem - MoRTH |
182 |
30-May-2025 06:55 PM |
16-Jul-2025 05:00 PM |
18-Jul-2025 12:00 PM |
[Consultancy services for preparation of DPR and Land acquisition of Gangakhed City Bypass 4Lane PS Configuration Road on NH361F connecting to NH361F km at 17.650 to km 33.400 and NH 752K in Gangakhed Taluka District Parbhani in the state of Maharas]
[No./NHDN/TEN/DPR/Nan/1526/2025][2025_MoRTH_862575_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nanded - MoRTH |
183 |
30-May-2025 06:30 PM |
16-Jul-2025 05:00 PM |
18-Jul-2025 12:00 PM |
[Consultancy services for preparation of DPR and Land Acquisition of Vasmat City Bypass road on NH61 connecting to NH61 km 60.00 to km 75.400 in Vasmat Taluka District Hingoli in the state of Maharashtra on EPC Mode. Tentative Length 17.50 km]
[No/NHDN/TEN/DPR/Nan/1526/2025][2025_MoRTH_862565_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nanded - MoRTH |
184 |
30-May-2025 05:45 PM |
14-Jul-2025 03:00 PM |
15-Jul-2025 04:00 PM |
[Curve Improvements at Km 41.500 on NH-69 Black Spot ID KA 05 37 and construction of RCC Culvert at Km 35.600 on Honnavar Sagar Section in the state Karnataka on EPC mode ]
[RW/BNG/ BLACKSPOT/KWR DVN/2023(2nd Call)][2025_MoRTH_862555_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Bangalore - MoRTH |
185 |
30-May-2025 05:00 PM |
14-Jul-2025 03:00 PM |
15-Jul-2025 03:00 PM |
[CS for Supervision of 4 Lane Raniganj ByPass of length 5.261 Km on NH 60 (New NH 14) from Km 275.20 of NH 60 to Km 478.18 of NH 02 (New NH 19) in Paschim Bardhaman West Bengal in EPC Mode ]
[MORTH/RO-KOL/NIT/AE/2025-26/01 ][2025_MoRTH_862485_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Kolkata - MoRTH |
186 |
30-May-2025 05:00 PM |
30-Jul-2025 05:30 PM |
31-Jul-2025 05:30 PM |
[abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas]
[05/EEH/AKL/2025-26, Dt.28.05.2025][2025_MoRTH_862532_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
187 |
30-May-2025 03:00 PM |
14-Jul-2025 04:00 PM |
15-Jul-2025 04:00 PM |
[Consultancy Service for Authority Engineer for Supervision of Up-gradation to two lane with Paved Shoulder from Design Chainage Km. 118.813 to Km. 148.810 and Km. 155 to Km. 165.082 of NH-351 in the state of Gujarat]
[RW- AE -2025-26-NH351-Pkg-IV][2025_MoRTH_862394_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Gandhinagar - MoRTH |
188 |
30-May-2025 10:00 AM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[Construction and Up-gradation to Two lane with paved shoulder In km 90.990 to 98.160 Total Length 7.170 km Kutul to Nilangur Maharashtra Border Road of NH-130D PKG-4 (PART-1) in the State of Chhattisgarh.]
[31/CE/NH/TC/44-14/2025][2025_MoRTH_862176_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
189 |
30-May-2025 10:00 AM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[Construction and Up- gradation to Two lane with paved shoulder In km 98.160 to 105.330 Total Length 7.170 km Kutul to Nilangur Maharashtra Border Road of NH-130D PKG-4 (PART-2) in the State of Chhattisgarh.]
[32/CE/NH/TC/44-15/2025][2025_MoRTH_862177_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
190 |
30-May-2025 10:00 AM |
14-Jul-2025 05:30 PM |
16-Jul-2025 11:30 AM |
[Construction and Up- gradation to Two lane with paved shoulder In km 105.330 to 112.500 total length 7.170 km Kutul to Nilangur Maharashtra Border Road of NH-130D PKG-4 (PART-3) in the State of Chhattisgarh.]
[33/CE/NH/TC/44-16/2025][2025_MoRTH_862178_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
191 |
29-May-2025 06:55 PM |
01-Jul-2025 05:30 PM |
03-Jul-2025 12:30 PM |
[One Time Improvement In Bhoura Town Portion, Shahpur Town Portion and Padhar Town Portion on NH 69 (Old) NH 46 (New) Itarsi Betul Road in the State of Madhya Pradesh on EPC mode]
[20/SAC/Tender/NH/2022-23][2023_MoRTH_770427_3]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Madhya Pradesh PWD-Indore - MoRTH |
192 |
29-May-2025 05:00 PM |
10-Jul-2025 04:00 PM |
12-Jul-2025 04:00 PM |
[Construction of 2 Lannig with paved shoulder of Daudnagar, Nasriganj and Dawath Bypass of NH 120 in the State of Bihar on EPC mode for Year 2024 2025.]
[04/EPC/NH Gaya/2024-25][2025_MoRTH_862247_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Patna - MoRTH||NH Division-Gaya - MoRTH |
193 |
29-May-2025 02:15 PM |
14-Jul-2025 05:30 PM |
15-Jul-2025 05:30 PM |
[Repair and Maintenance of Ajanta Buldana section of NH 753E from Km 0.00 to 49.130 (Length 49.130Km) in the state of Maharashtra (At Risk and Cost of contractor) (2nd Call)]
[50][2025_MoRTH_853651_2]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
194 |
28-May-2025 06:55 PM |
24-Jul-2025 02:00 PM |
25-Jul-2025 02:00 PM |
[Construction of RCC Draintotal 8.06 km of NH-512 NH Division VII]
[02 of 2025-26 of SE, NHC-II][2025_MoRTH_862173_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Kolkata - MoRTH||NH West Bengal PWD-Birbhum - MoRTH |
195 |
28-May-2025 05:10 PM |
11-Jul-2025 03:00 PM |
14-Jul-2025 04:00 PM |
[Performance Based Maintenance Contract PBMC for NH 150A from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to National Highway Division, Vijayapura in the State of Karnataka]
[RW/BNG/PBMC/NH-150A/Km 142.00-171.60/75/2024][2025_MoRTH_862139_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Bangalore - MoRTH |
196 |
28-May-2025 02:00 PM |
14-Jul-2025 11:00 AM |
16-Jul-2025 11:00 AM |
[Consultancy Services for the Preparation of Detailed Project Report (DPR) for the four lane Bypass of NH stretch from km 44/600 to km 56/600 (Thamarassery Ghat) of NH-766 in the State of Kerala.]
[RW/TRI/OE/NH-766/138/2017-18][2025_MoRTH_861993_2]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Thiruvananthapuram - MoRTH |
197 |
27-May-2025 05:00 PM |
11-Jul-2025 11:00 AM |
14-Jul-2025 11:30 AM |
[Construction of 180 mtrSpan Bridge at Bhatti Nallah at RD 106.530 on NH154A in the state of Himachal Pradesh.]
[PW-CE-NH-CTR-Tender Notice/EPC-72/2025- 897-905][2025_MoRTH_861846_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Shimla - MoRTH||Circle Shahpur - MoRTH |
198 |
27-May-2025 05:00 PM |
11-Jul-2025 11:00 AM |
14-Jul-2025 11:30 AM |
[Construction Of 48.10 M. Bridge Over Barana Khad At Km. 37.120 and 74.20 M. Borewali Khad At Km. 38.580 and LVUP At Km. 37.425 On NH503 Extn. in the State Of HP.]
[PW-CE-NH-CTR-Tender Notice/EPC-71/2025-889-96][2025_MoRTH_861858_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Shimla - MoRTH||Circle Shahpur - MoRTH |
199 |
27-May-2025 01:30 PM |
14-Jul-2025 03:00 PM |
22-Jul-2025 03:00 PM |
[Realignment from km 15/4 to km 16/350 of NH -179A (Salem- Thirupathur - Vaniyambadi) under AP 2024- 25 in the state of Tamil Nadu]
[TNNo4/HDO/NH/25-26/Dt26.5.25 ][2025_MoRTH_861804_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Chennai - MoRTH||NH Division-Salem - MoRTH |
200 |
26-May-2025 06:00 PM |
11-Aug-2025 05:00 PM |
13-Aug-2025 11:00 AM |
[Consultancy Services for Detailed Project Report (DPR) for construction of 4/6-lane Ring Road / Bypass (180 Km) to decongest NH-66 in the State of Goa.]
[RO/MUM/AP/Goa/NH-66/DPR][2025_MoRTH_861680_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH |
201 |
26-May-2025 09:00 AM |
07-Jul-2025 11:00 AM |
08-Jul-2025 01:00 PM |
[Construction of Limited Height Subway RUB near proposed ROB at Railway km. 576 10 11 LC No C61 on NH89 Old NH at Ch 165 550 Left out portion of Nagaur Bikaner Section in the state of Rajasthan on EPC Mode]
[02/2025-26 SE PWD NH Circle Bikaner ][2025_MoRTH_861511_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH||National Highway Rajasthan PWD-BIKANER - MoRTH |
202 |
22-May-2025 04:30 PM |
22-Jul-2025 02:00 PM |
23-Jul-2025 02:00 PM |
[Revised Cost Estimate for Construction of 2 lane Major Bridge over Brahmaputra between Majuli on North Bank and Jorhat on South Bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on NH-715K in the state of Assam.(Job No715/AS/2020-21/213)]
[NH-12013/05/2020/AS/Zone-V][2025_MoRTH_861218_1]
|
Ministry of Road Transport and Highways||NER and SARDP-NE - MoRTH |
203 |
22-May-2025 04:00 PM |
07-Jul-2025 05:30 PM |
08-Jul-2025 05:30 PM |
[Rehabilitation and Upgradation of 2L road with paved shoulders of Mangrulpir to Mahan NH 161A (Design Km.75.000 to 107.500)(Total length 32.50 Km) in the state of Maharashtra (Maintenance work at Risk and Cost of contractor)(2nd Call)]
[51/EENH/AKL/2024-25, Dt.18/03/2025][2025_MoRTH_853676_2]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
204 |
22-May-2025 01:00 PM |
07-Jul-2025 05:30 PM |
08-Jul-2025 05:30 PM |
[Construction of Toll Plaza at Ch.11.800 near karanja ramjanpur on Shegaon to Deori Phata from Km 0.000 to Km 41.500 section of NH 548 C in the state of Maharashtra on Risk and Cost of contractor.(2nd call)]
[43/EENH/AKL/2024-25, Dt.17/02/2025][2025_MoRTH_849650_2]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
205 |
21-May-2025 06:00 PM |
05-Jul-2025 11:00 AM |
07-Jul-2025 11:30 AM |
[Construction of 125 mtr Span Arch bridge at RD 42 410 on NH 154A SH 125 mtr Span Through Arch Bridge Formation Cutting and Filling Protection Work Metalling and Tarring Road Side Drain Road Furniture]
[PW-CE-NH-CTR-Tender Notice/EPC-70/2025- 743-50 ][2025_MoRTH_861026_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Shimla - MoRTH||Circle Shahpur - MoRTH |
206 |
21-May-2025 06:00 PM |
05-Jul-2025 11:00 AM |
07-Jul-2025 11:30 AM |
[Construction of Bridge Over Swan River at Km 13 450 On NH 503A in District Una Himachal Pradesh]
[PW-CE-NH-CTR-Tender Notice/EPC-69/2022- 735-42][2025_MoRTH_861044_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Shimla - MoRTH||Circle Shahpur - MoRTH |
207 |
21-May-2025 06:00 PM |
05-Jul-2025 11:00 AM |
07-Jul-2025 11:30 AM |
[Construction of Bridge at Luna RD 150 450 on NH 154A in the State of Himachal Pradesh SH 41 5 m Span Steel composite Bridge, Bailey Bridge Dismantling of Bailey Bridge Formation Cutting and Filling Protection work Metalling and Tarring ]
[PW-CE-NH-CTR-Tender Notice/EPC-68/2025- 751-58][2025_MoRTH_861017_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Shimla - MoRTH||Circle Shahpur - MoRTH |
208 |
17-May-2025 12:30 PM |
17-Jul-2025 11:00 AM |
18-Jul-2025 12:00 PM |
[SITC and Operation and Maintenance of Advanced Traffic Management System (ATMS) on National Highway 92, 730B, 730C, and 731K from Etawah to Pilibhit (length 240.726 Km.)in the state of UP (GNHCP) with loan assistance of World Bank on EPC mode]
[GNHCP_UP_ATMS_1 dated 17.05.2025][2025_MoRTH_860498_1]
|
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH |
209 |
16-May-2025 10:00 AM |
07-Jul-2025 11:00 AM |
09-Jul-2025 11:30 AM |
[Reconstruction of Box Cell in Km. 31.600, Km. 31.700 Km. 42.600, Km. 44.000, Km. 51.600, Km. 122.400, Km. 124.400, Km. 135.000, Km. 153.800 of NH-30(Old NH-221) in the State of Chhattisgarh.]
[28/CE/NH/TC/44-12/2025 (1st Call)][2025_MoRTH_859976_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
210 |
16-May-2025 10:00 AM |
07-Jul-2025 05:30 PM |
09-Jul-2025 11:30 AM |
[Short term maintenance of Takhatpur Ex. Road from Km. 26.542 to Km. 32.093, Mungeli Ex. Road from Km. 45.786 to Km. 56.275, Pandariya Ex. Road from Km. 82.582 to Km. 87.133 and Pondi Ex. Road from Km. 103.166 to Km. 104.756 on NH130A]
[24/CE/NH/TC/44-17/2024 (2nd Call)][2025_MoRTH_859964_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
211 |
16-May-2025 10:00 AM |
21-Jul-2025 05:30 PM |
25-Jul-2025 11:00 AM |
[Construction Railway RoB at Km. 3.485 along Parali Bypass on Deogaon fata_Parali_Latur_Omerga_road NH 548B in the State of Maharashtra.]
[NIT No. 07/EENHD/Latur/956/2025][2025_MoRTH_860253_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Aurangabad - MoRTH |
212 |
16-May-2025 10:00 AM |
07-Jul-2025 11:00 AM |
09-Jul-2025 11:30 AM |
[Construction of Two LANE Road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of Bhopalpatnam Venktapura Warangal Hyderabad Road of NH163 in the State of Chhattisgarh.]
[27/CE/NH/TC/44-11/2025 (1st Call)][2025_MoRTH_859975_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Raipur - MoRTH||NH Chhattisgarh PWD-Raipur - MoRTH |
213 |
16-May-2025 09:00 AM |
17-Jul-2025 11:00 AM |
18-Jul-2025 11:00 AM |
[CONSTRUCTION OF LIMITED HEIGHT SUBWAY (LHS)/RUB NEAR PROPOSED AT KM 503/0-1 (LC NO-85) ON NH-89 (AJMER NAGAUR SECTION) IN THE STATE OF RAJASTHAN ON EPC MODE]
[NIT 04/2025-26 CE (NH) PWD Rajasthan Jaipur][2025_MoRTH_860300_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH||National Highway Rajasthan PWD-Jaipur - MoRTH |
214 |
15-May-2025 09:00 AM |
30-Jul-2025 05:30 PM |
31-Jul-2025 05:30 PM |
[Construction of ROB with approaches in lieu of Railway crossing LC 20 on NH 161H at km 24.913 in the state of Maharashtra on EPC mode]
[04/EEH/AKL/2025-26, Dt.14.05.2025][2025_MoRTH_860129_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
215 |
14-May-2025 06:00 PM |
21-Jul-2025 05:30 PM |
22-Jul-2025 12:30 PM |
[Maintenance Rectification Work under risk and cost for Rehabilitation and up gradation of NH 753F of Section II Sillod Fardapur Road Design Ch Km 60 630 to Km 99 660 L 32 63 Km to four lane with Earthen Shoulder Descope length km 87 700 to 94 100 c]
[EENHD/Chh.S./Tender/NIT No-1/4000089][2025_MoRTH_860036_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Aurangabad - MoRTH |
216 |
13-May-2025 06:00 PM |
21-Jul-2025 05:00 PM |
28-Jul-2025 11:00 AM |
[Reconstruction of Distressed Minor bridge over Dhari Jhora at Km 617.945 of NH-31 -New NH-17 under NH Division IX in the district of Jalpaiguri, West Bengal on EPC mode Job-568.]
[WBPW_Rd/SE/NHC3/eRFP-2/2025-26][2025_MoRTH_859831_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH||RO Kolkata - MoRTH||NH West Bengal PWD-Siliguri - MoRTH |
217 |
13-May-2025 05:00 PM |
04-Jul-2025 05:00 PM |
07-Jul-2025 05:00 PM |
[Consultancy services for Authoritys Engineer for supervision of Construction of four lane of Chausa_Buxar Bypass from km 45.000 to km 65.915 (Package 2) of NH 319A in the state of Bihar on EPC mode.]
[RW/PAT/NH-319A(Pkg.2)/CS/2024][2025_MoRTH_859809_1]
|
Ministry of Road Transport and Highways||P3 Delhi - MoRTH |
218 |
10-May-2025 05:45 PM |
15-Jul-2025 05:00 PM |
17-Jul-2025 05:05 PM |
[Rehabilitation and Upgradation of Maharashtra MP Border to Tumsar section of NH 543K from km.51.000 to 69.000 to two lane with paved shoulder configuration in the State of Maharashtra on EPC mode total length 18.00 km]
[NIT-06/EENH/NGP/2025-26][2025_MoRTH_859720_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
219 |
01-May-2025 06:00 PM |
17-Jul-2025 11:00 AM |
18-Jul-2025 11:00 AM |
[Construction of FOB at km 6.420 (Amity university), grade separated structures/flyover at km 7.965 and 8.075 (RIICO KANT Kalwar), 11.780 (Achrol) and 25.300 (Kukas) with slip road on NH-248 for rectification of identified blackspots/accident spots in]
[NIT 03/2025-26 CE (NH) PWD Rajasthan, Jaipur][2025_MoRTH_858611_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Jaipur - MoRTH||National Highway Rajasthan PWD-Jaipur - MoRTH |
220 |
30-Apr-2025 04:00 PM |
03-Jul-2025 05:00 PM |
07-Jul-2025 03:00 PM |
[Construction of 6 lane VUP at Junction of NH-148B (4-L) and NH-709E (4-L) on Bhiwani Bypass Bhiwani in Bhiwani District]
[NH-148B and 709E-HR-2024-25-427][2025_MoRTH_858435_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Chandigarh - MoRTH||NH Division-Rohatak - MoRTH |
221 |
29-Apr-2025 05:00 PM |
14-Jul-2025 11:00 AM |
15-Jul-2025 03:30 PM |
[Consultancy services for Authoritys Engineer for Supervision of Work of Rehabilitation and Upgradation of Sendhwa to Khetiya (MP/MH Border) Section from km 0/000 to km 55/600 of NH-752(G) to 2L with PS in the State of Madhya Pradesh on EPC mode]
[CE-RO/BHP/Tender/AE/04/2025-26][2025_MoRTH_857846_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH |
222 |
29-Apr-2025 03:30 PM |
07-Jul-2025 05:00 PM |
08-Jul-2025 05:05 PM |
[Rehabilitation and Up-Gradation of Wardha Salod Hirapur - Pulgaon Section of NH 347A from Km 134.283 to Km 159.075 Design Chainage Km 0.000 to Km 24.792 to Two Laning with paved shoulder in the state of Maharashtra on EPC mode]
[NIT-03/EENH/NGP/2025-26][2025_MoRTH_858260_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
223 |
28-Apr-2025 05:30 PM |
12-Aug-2025 05:30 PM |
14-Aug-2025 12:30 PM |
[Independent Engineer services for Upgradation of Existing Road to 2L with PS for the Stretch of Tikamgarh Badagon Ghuwara Shahgarh from km 75/000 to km 155/700 (NH 539) in the State of Madhya Pradesh on Hybrid Annuity Mode]
[CE-RO/BPL/IE/NH-539/03/2025-26][2025_MoRTH_857774_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Division-Bhopal - MoRTH |
224 |
28-Apr-2025 11:45 AM |
12-Aug-2025 05:30 PM |
14-Aug-2025 12:30 PM |
[Consultancy services for Authoritys Engineer for Supervision of Work of Upgradation of Existing Intermediate Lane Flexible Pavement to 2L with PS from Km 0.00 to Km 75.00 on Orchha Tikamgarh Shahgarh NH 539 in the State of Madhya Pradesh on EPC Mode]
[CE-RO/BHP/Tender/AE/02/2025-26][2025_MoRTH_857688_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Division-Bhopal - MoRTH |
225 |
28-Apr-2025 10:00 AM |
25-Jul-2025 05:30 PM |
28-Jul-2025 05:30 PM |
[Rehabilitation and Up.gradation of Guhagar Chiplun Helwak Road from existing Km 26.890 to 403.610, Design Km 26.230 to 403.000 NH 166 E Length 13.77 Km two lanes with paved shoulders configuration in the state of Maharashtra on Engineering, Procureme]
[Bid/Package No/EENH/Ratnagiri/NIT No.4 / 1032][2025_MoRTH_858014_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Ratnagiri - MoRTH |
226 |
25-Apr-2025 06:00 PM |
25-Jul-2025 05:30 PM |
28-Jul-2025 05:30 PM |
[construction of Foot Over Bridge at Parshuram Ghat, Kamthe and Sawarde and Service Road, Bus Bay with Bus Shelter etc in km 205.400 to km 241.300 Parshuram Ghat.Arawali Section Dist. Ratnagiri in State of Maharashtra on EPC mode]
[Bid/Package No/EENH/Ratnagiri/NIT No.5 / 1051][2025_MoRTH_857930_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Ratnagiri - MoRTH |
227 |
25-Apr-2025 04:00 PM |
04-Jul-2025 05:30 PM |
07-Jul-2025 11:00 AM |
[ehabilitation and Upgradation for Kopargaon to Savli Vihir section from km. 354.000 to km.362.663 Total Length 8.663 of NH 752 G to 4L.PS in the state of Maharashtra. Repairs of bad patches and diversions at the risk and cost of the contractor as per]
[NIT02][2025_MoRTH_857869_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Pune - MoRTH |
228 |
22-Apr-2025 05:00 PM |
14-Jul-2025 05:00 PM |
15-Jul-2025 05:00 PM |
[Strengthening of existing stretch from Km 101/880 to 105/300 of NH-167BG inKavali town along with One-Time Improvement of bypassed stretch of Jaladanki town from Km 91/770 to 94/300 on EPC mode in SPSR Nellore District in the State of Andhra Pradesh]
[SENHVJA/02/2025-26 Dated 19.04.2025][2025_MoRTH_857176_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Vijayawada - MoRTH||NH Division-Vijayawada - MoRTH |
229 |
21-Apr-2025 06:30 PM |
12-Aug-2025 05:30 PM |
14-Aug-2025 12:30 PM |
[Construction/Upgradation of Existing Road to Two Lane with Paved Shoulder for the Stretch of Tikamgarh Badagon Ghuwara Shahgarh from Km 75/000 to Km 155/700 (NH-539) in the State of Madhya Pradesh on Hybrid Annuity Mode]
[CE-RO/BHP/Tender/01/2025-26][2025_MoRTH_856607_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Division-Bhopal - MoRTH |
230 |
21-Apr-2025 05:00 PM |
10-Jul-2025 03:00 PM |
11-Jul-2025 03:30 PM |
[Consultancy Services for Traffic Simulation Model, Road Safety Audit and City Logistic Plan for Navi Mumbai and Thane Cities of Maharashtra]
[IAHE/Trg./33/TrafSim-NaviMum][2025_MoRTH_857024_1]
|
Ministry of Road Transport and Highways||IAHE Noida - MoRTH |
231 |
16-Apr-2025 06:30 PM |
07-Jul-2025 12:00 PM |
08-Jul-2025 12:00 PM |
[Construction of new 4 lane bridge over Umardashi river with approachesat Km. 153.300 Design Km. 153.080 of NH 58 near Palanpur Merwada village in the State of Gujarat. Job No. 058.GJ.2024.25.776 UPC_M.00058.25776.GJ]
[Tender Notice No. 01 of 2025-2026][2025_MoRTH_856849_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Gandhinagar - MoRTH||NH Division-Ahmedabad - MoRTH |
232 |
29-Mar-2025 02:00 PM |
12-Jul-2025 03:00 PM |
14-Jul-2025 03:00 PM |
[Strengthening from km 0.00 to 13.200 ( Majhola to Khatima) on NH-731k on EPC mode under Annual Plan 2024-25 in The State of Uttarkhand]
[1133/12M-NH/2025 dt 27.03.2025][2025_MoRTH_854977_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Dehradun - MoRTH||NH Uttarakhand PWD-Doiwala - MoRTH |
233 |
28-Mar-2025 06:00 PM |
07-Jul-2025 05:30 PM |
08-Jul-2025 11:00 AM |
[Construction of ROB in LIEU of L C No 99 at Km 247 1 2 of bow string 1x62 RCC Girder 2x15M and limited height subway of 1x5x3 M between Selu Satuna Stations on Manmad Mudkhed section in the State of Maharashtra on EPC Mode]
[EENH/Jalna/Tender/NIT No-12/292][2025_MoRTH_853139_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
234 |
27-Mar-2025 05:55 PM |
09-Jul-2025 05:30 PM |
10-Jul-2025 05:30 PM |
[Repair of Rehabilitation and upgradation of Digras Darwha Karanja section in (km 0.000 to 74.351) NH 361C two lanes with paved shoulder configuration in the state of Maharashtra.(Under Risk and Cost).]
[53/EENH/AKL/2024-25, Dt.26/03/2025][2025_MoRTH_854817_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
235 |
27-Mar-2025 05:40 PM |
09-Jul-2025 05:30 PM |
10-Jul-2025 05:30 PM |
[Repair and Maintenance of Jalgaon Jamod Nandura Road NH 161H (ch.0.00 to 25.00 in the state of Maharashtra. (At Risk and Cost of contractor)]
[52/EENH/AKL/2024-25, Dt.26/03/2025][2025_MoRTH_854809_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
236 |
26-Mar-2025 06:00 PM |
10-Jul-2025 05:00 PM |
11-Jul-2025 05:30 PM |
[Rehabilitation and Upgradation of Sendhwa to Khetiya (MP/MH Border) Section from km 0/000 to km 55/600 of NH-752(G) to two lane with paved shoulders in the State of Madhya Pradesh on EPC Mode.]
[CE-RO/BHP/Tender/04/2024-25][2025_MoRTH_854623_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH |
237 |
26-Mar-2025 05:30 PM |
12-Aug-2025 05:30 PM |
14-Aug-2025 12:30 PM |
[Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode]
[CE-RO/BHP/Tender/03/2024-25][2025_MoRTH_854576_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH||NH Division-Bhopal - MoRTH |
238 |
26-Mar-2025 11:00 AM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:00 AM |
[Rehabilitaion and Up gradation of Existing Km. 98.750 Design Ch 121.500 to Existing Km 83.690 design Ch 136.500 and from Existing Km 78.050 Design Ch 161.281 to Pimpalgaon Baswant Existing km 59.100 Design Ch. 161.281 to two lane with paved shoulders]
[NIT09][2025_MoRTH_854531_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Pune - MoRTH |
239 |
25-Mar-2025 03:00 PM |
30-Jul-2025 12:00 PM |
05-Aug-2025 03:30 PM |
[Construction of Four lane Road Over Bridge (ROB No. 357) on New B.G. line from Khurda Road-Bolangir and its approaches at km. 156/088 (Village Baringi) of NH-57 in the state of Odisha on EPC Mode]
[22 CE NH of 2024-25][2025_MoRTH_854438_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Kesinga - MoRTH |
240 |
25-Mar-2025 03:00 PM |
30-Jul-2025 12:00 PM |
05-Aug-2025 03:30 PM |
[Construction of Four lane Road Over Bridge (ROB No. 399) on New B.G. line from Khurda Road-Bolangir and its approaches at km. 138/435 (Village Kardakotha) of NH-57 in the state of Odisha on EPC Mode]
[23 CE NH of 2024-25][2025_MoRTH_854448_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Kesinga - MoRTH |
241 |
25-Mar-2025 03:00 PM |
30-Jul-2025 12:00 PM |
05-Aug-2025 03:30 PM |
[Construction of Four lane Road Over Bridge (ROB No. 413) on New B.G. line from Khurda Road- Bolangir and its approaches at km. 134.274 (Charichhak) of NH-57 in the state of Odisha on EPC Mode]
[24 CE NH of 2024-25][2025_MoRTH_854453_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Kesinga - MoRTH |
242 |
19-Mar-2025 01:00 PM |
01-Aug-2025 05:30 PM |
04-Aug-2025 05:30 PM |
[Construction of MNB 28.880 on Digras Darwha Karanja section in (km ch.0.00 to 74.351) NH361C two lanes with paved shoulder in the state of Maharashtra. (At Risk Cost of contractor)]
[49/EENH/AKL/2024-25, Dt.04/03/2025][2025_MoRTH_853316_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
243 |
17-Mar-2025 09:00 AM |
01-Aug-2025 05:30 PM |
04-Aug-2025 05:30 PM |
[Construction of balance work in punch lists of Ajanta Buldhana section of NH753E from Km 0.00 to 49.130 in the state of Maharashtra on Risk and Cost of contractor]
[48/EENH/AKL/2024-25, Dt.04/03/2025][2025_MoRTH_853306_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
244 |
17-Mar-2025 09:00 AM |
01-Aug-2025 05:30 PM |
04-Aug-2025 05:30 PM |
[Rehabilitation Upgradation to Four Lane road with Paved Shoulders length in Buldhana City from KM.52.450 to KM. 54.470 (Total length 2.02 KM) and Reconstruction of MNB at Ch 80.170 Ch 89.610 Ch 93.310 Ch 96.750 of Buldhana Khamgaon section (Ch 52.450]
[47/EENH/AKL/2024-25, Dt.04/03/2025][2025_MoRTH_853278_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
245 |
13-Mar-2025 02:00 PM |
21-Jul-2025 04:00 PM |
22-Jul-2025 04:00 PM |
[Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 Bagasara to Thangalol section of NH351 in the state of Gujarat Package IV on EPC mode]
[24 of 2024-2025][2025_MoRTH_853175_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Gandhinagar - MoRTH||NH Division-Rajkot - MoRTH |
246 |
07-Mar-2025 06:30 PM |
23-Jul-2025 05:30 PM |
25-Jul-2025 11:00 AM |
[Construction of Major Bridge across Godavari River at Dusalgaon Village at Km. 75.660 Design km. 29.040 and reconstruction of Minor Bridge across Irrigation Canal at Ch. 57.665 Design km 11.045 along Parbhani Gangakhed Road NH 752K in the state of MH]
[NIT No. 05/EENHD/Latur/480/2025 ][2025_MoRTH_852423_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Aurangabad - MoRTH |
247 |
25-Feb-2025 06:00 PM |
05-Jul-2025 06:00 PM |
07-Jul-2025 11:00 AM |
[Consultancy services of Independent Engineer for Upgradation to two lane with paved shoulder configuration from Km. 0/000 to 62/822 (Limbdi-Dhrangadhra section) of NH-51 in the State of Gujarat (Total Length- 62.822Km) on HAM Mode]
[NH-51/IE][2025_MoRTH_850891_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Gandhinagar - MoRTH |
248 |
25-Feb-2025 10:30 AM |
28-Jul-2025 05:30 PM |
30-Jul-2025 03:00 PM |
[Reconstruction of Narrow Minor Bridge 3 Nos. to Four lane configuration N.H.63 Section Kuslamb Yedshi at Ch. 4.113 and 9.748 and 10.203 on EPC Mode in the state of Maharashtra]
[NHD/TC/EPC/637/2025 dt 21/02/2025][2025_MoRTH_850567_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-SOLAPUR - MoRTH |
249 |
25-Feb-2025 10:30 AM |
28-Jul-2025 05:30 PM |
30-Jul-2025 03:00 PM |
[Widening of Narrow Major Bridge 2No to four lane configuration NH 548C Section Tembhurni to Kuslamb at Ch. 194.470 Sina River Bridge and Ch. 197.125 Widening of Narrrow Minor Bridge 2 No at Ch. 168.270 and Ch. 180.525 and Reconstruction of Narrow M]
[NHD/TC/EPC/638/2025 Dt 21/02/2025][2025_MoRTH_850569_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-SOLAPUR - MoRTH |
250 |
25-Feb-2025 10:30 AM |
28-Jul-2025 05:30 PM |
30-Jul-2025 03:00 PM |
[Rehabilitation Upgradation of existing road to 2 Lane 4 Lane with paved shoulders configuration of Murum Alur Waghdari Akkalkot Nagansur Tolnur Maharashtra State Border NH 548B Design Chainage Km 289.300 to 342.890 Length 52.556 Km Approx) Distr]
[NHD/TC/EPC/639/2025 Dt 21/02/2025][2025_MoRTH_850571_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-SOLAPUR - MoRTH |
251 |
21-Feb-2025 05:30 PM |
03-Jul-2025 05:30 PM |
04-Jul-2025 05:30 PM |
[Construction of Toll Plaza at Ch. 80.100 near Narsi Namdeo on Risod to Hingoli from Km 44.220 to Km 97.450 section of NH 461 B in the state of Maharashtra on Risk and Cost of contractor on EPC Basis mode.]
[44/EENH/AKL/2024-25, Dt.20/02/2025][2025_MoRTH_850462_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Division-Akola - MoRTH |
252 |
03-Feb-2025 05:00 PM |
10-Jul-2025 05:00 PM |
14-Jul-2025 11:00 AM |
[Rehabilitation and Up-gradation from Design Ch km 35.300 to km 65.740 (Length-30.440Km) of NH-166G (Gaganbawada to Kale) to 2LPS in the state of Maharashtra on EPC mode.]
[RO/MUM/TENDER/2023-24/13][2025_MoRTH_847336_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH |
253 |
01-Feb-2025 06:30 PM |
07-Jul-2025 11:00 AM |
08-Jul-2025 03:00 PM |
[Construction of proposed R.O.B. and its approaches in replacement of existing level crossing No.21X at Km Ch.107/500 of NH 64 District Anand in the state of Gujarat]
[EPC 03 of 2024-25][2025_MoRTH_847245_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH||RO Gandhinagar - MoRTH||NH Division-Varodara - MoRTH |
254 |
31-Jan-2025 05:00 PM |
02-Aug-2025 03:00 PM |
04-Aug-2025 03:30 PM |
[Upgradation to two lane with paved shoulder configuration from Km0.000 to Km 62.822 (Limbdi - Dharangadhra) of NH-51 in the State of Gujarat on Hybrid Annuity Mode (HAM) (Total Length- 62.822 Km).]
[RW/NH-12014/111/2024/GJ/Zone-V][2025_MoRTH_847097_1]
|
Ministry of Road Transport and Highways||P4 Delhi - MoRTH |
255 |
30-Jan-2025 01:00 PM |
17-Jul-2025 11:00 AM |
18-Jul-2025 03:30 PM |
[Consultancy services for Authoritys Engineer for Supervision of Work of Upgradation and reconstruction of Mandla - Nainpur Section of NH 543 from Km 190/400 to Km 236/500 to 2L with PS configuration in the State of Madhya Pradesh on EPC mode]
[CE-RO/BHP/Tender/02/2024-25][2025_MoRTH_846024_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH |
256 |
14-Jan-2025 06:30 PM |
31-Jul-2025 05:00 PM |
01-Aug-2025 05:30 PM |
[Upgradation and reconstruction of Mandla - Nainpur Section of NH 543 from Km 190/400 to Km 236/500 to two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode]
[CE-RO/BHP/Tender/01/2024-25][2025_MoRTH_844435_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH |
257 |
16-Dec-2024 04:00 PM |
15-Jul-2025 05:30 PM |
16-Jul-2025 11:00 AM |
[Maintenance of Rehabilitation and Upgradation of existing Highway to 2 lane 4 lane with paved shoulder configuration from Dhangarpimpri to Jalna and Ambad chowk to Mantha Chowk Km 30 390 to Km 50 264 and 0 000 to 5 243 two lane with paved shoulder]
[EENH/Jalna/Tender/NIT No 8/1918][2024_MoRTH_839864_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
258 |
11-Dec-2024 04:00 PM |
15-Jul-2025 05:30 PM |
16-Jul-2025 11:00 AM |
[Maintenance of Rehabilitation and upgradation of existing carriageway to 2 lane 4 lane with paved shoulder configuration from Wadigodri to Dhangripimpri Km 0 000 to Km 30 390 Section of NH753H on EPC Mode in the state of Maharashtra Package1 Risk and]
[EENH/Jalna/Tender/NIT No-09/1919][2024_MoRTH_839167_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
259 |
10-Dec-2024 06:15 PM |
10-Jul-2025 05:00 PM |
14-Jul-2025 11:00 AM |
[Rehabilitation and Upgradation of NH 753B from Nandurbar to Taloda (Km. 49.050 to Km. 78.270) to 4 LPS in the States of Maharashtra/Gujarat on EPC mode.]
[RO/MUM/TENDER/2024-25/11][2024_MoRTH_839025_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH |
260 |
15-Nov-2024 05:30 PM |
22-Jul-2025 11:00 AM |
23-Jul-2025 11:30 AM |
[IMPROVEMENT CONSTRUCTION OF EXISTING CL 5 ROAD TO NH INTERMEDIATE LANE SPECIFICATION WITH HARD SHOULDER FROM EXISTING KM 00 000 TO KM 75 991 DESIGN KM 00 000 TO KM 73 830 DESIGN LENGTH 73.830 KM OF NH 505 SUMDO KAZA GRAMPHOO ROAD IN THE STATE OF HP.]
[RO/HP/Works (262) BRO PKG-IV/2024-25][2024_MoRTH_835173_1]
|
Ministry of Road Transport and Highways||P1 Delhi - MoRTH||RO Shimla - MoRTH |
261 |
08-Nov-2024 06:55 PM |
17-Jul-2025 11:00 AM |
18-Jul-2025 03:00 PM |
[RFP for the work of Improvement and up-gradation to two lane with Paved Shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) Hadia Chauraha to Karmaini Ghat section of NH-328 in the State of Uttar Pradesh]
[CE-RO/LKO/NH (O)/11/NH-328/Civil Work/2022-23 Dated 08.11.2024][2024_MoRTH_834312_1]
|
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH |
262 |
29-Oct-2024 04:15 PM |
14-Jul-2025 03:00 PM |
16-Jul-2025 04:00 PM |
[Widening and strengthening of Daringbadi ghat portion from km 231.000 to 256.000 (Design chainage from km 229.500 to 256.468) of NH-59 under NH(O) in Hybrid Annuity Mode Plan 2023-24 in the State of Odisha (Design length 26.968 Kms).]
[RO/BBSR/11017/NH(O)/2023-24][2024_MoRTH_833034_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH |
263 |
24-Oct-2024 06:55 PM |
23-Jul-2025 12:00 PM |
29-Jul-2025 03:30 PM |
[Reconstruction of 3 nos. of damaged bridges of NH-326 at Toyaput Nallah at Ch. Km 261/060, Khudipadar Nallah at Ch. 268/780 km and Debagarh river at Ch. 270/260 km on NH-326 in the State of Odisha. (Bid Ref No. 11 CE NH of 2024-25)]
[11 CE NH of 2024-25][2024_MoRTH_832354_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Kesinga - MoRTH |
264 |
24-Oct-2024 06:55 PM |
23-Jul-2025 12:00 PM |
29-Jul-2025 03:30 PM |
[Construction of Bypass Road to Rayagada Town and JK Pur Town on NH-326 in the State of Odisha. ]
[10 CE NH of 2024-25][2024_MoRTH_832345_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Kesinga - MoRTH |
265 |
17-Oct-2024 06:55 PM |
23-Jul-2025 12:00 PM |
29-Jul-2025 03:30 PM |
[Construction of Flyover at chainage Km 165.020 (Pastikudi) on NH-26 including approaches in the state of Odisha on EPC Mode.]
[09 CE NH of 2024-25][2024_MoRTH_831331_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Kesinga - MoRTH |
266 |
16-Oct-2024 11:30 AM |
12-Aug-2025 03:00 PM |
13-Aug-2025 11:00 AM |
[Supply Installation Commissioning Maintenance of Sensors Data Acquisition Data Transmission Analysis Management Reporting for the same for BHMS for New Cable Stayed Zuari Bridge, Old Zuari Bridge on NH-66 and Borim Bridge on NH-566 in State of Goa]
[13/1/2024-25/PWD/ WDXIV/NH/ASW/09 Dt 15/10/2024][2024_MoRTH_830862_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||PWD / CE(NH)-Goa - MoRTH |
267 |
14-Oct-2024 04:30 PM |
30-Jul-2025 05:00 PM |
02-Aug-2025 05:05 PM |
[Consrtuction of Boxculvert at Ch.84/200 on Deori to Korchi Road Section from Km 80/025 to 124/965 on Balaghat- Gondia-Amgaon-Deori-Korchi Road NH 543 tahsil Deori ,District Gondia in the State of Maharashtra]
[NIT-24/EENH/NGP/2024-25][2024_MoRTH_830570_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
268 |
14-Oct-2024 04:15 PM |
30-Jul-2025 05:00 PM |
02-Aug-2025 05:05 PM |
[Construction of 4 lane concrete White topping Nagbhid city portion ]
[NIT-27/EENH/NGP/2024-25][2024_MoRTH_830674_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
269 |
14-Oct-2024 03:00 PM |
30-Jul-2025 05:00 PM |
02-Aug-2025 05:05 PM |
[Short Term Maintenance Contract (STMC) for Maintenance of NH247 in Kamptee to Gumthala section in Km 19/200 to 25/900 and Km 27/600 to 32/000 of Dahegaon - Kuhi Road (Total Length 11.100 Km) in Nagpur District in the state of Maharashtra]
[NIT-25/EENH/NGP/2024-25][2024_MoRTH_830637_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
270 |
14-Oct-2024 02:30 PM |
30-Jul-2025 05:00 PM |
02-Aug-2025 05:05 PM |
[Short Term Maintenance Contract (STMC) for maintenance of NH 753 in Amdi to Saoner section in Km 226/140 to 226/280 Km 231/600 to 232/540 Km 256/245 to 256/800 and Km 264/800 to 265/724. (Total Length 2.560 Km) in Nagpur District in the state of Ma]
[NIT-25/EENH/NGP/2024-25][2024_MoRTH_830634_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
271 |
12-Oct-2024 05:15 PM |
30-Jul-2025 05:00 PM |
02-Aug-2025 05:05 PM |
[Upgradation of BSNL Office to Railway Crossing in Bhandara City from Chainage Km 168/180 to Km 168/920 (Length 0.740 Km) of NH-247 to Two Lane with Paved Shoulder Configuration of Bhandara-Khat-Ghotitok road in the state of MaharashtrA ON EPC MODE]
[NIT-15/EENH/NGP/2024-25][2024_MoRTH_830547_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
272 |
12-Oct-2024 04:45 PM |
30-Jul-2025 05:00 PM |
02-Aug-2025 05:05 PM |
[Balance work of Up-Gradation of Tirora Gondia section of NH 753 to Two Lane with Paved Shoulders / 4 Lane in Km. 87/000 to 92/152 and Km. 98/100 to 105/405 Total Length 12/457 Km in Gondia District in the state of Maharashtra on EPC Mode]
[NIT-14/EENH/NGP/2024-25][2024_MoRTH_830545_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
273 |
11-Oct-2024 01:00 PM |
14-Jul-2025 05:30 PM |
16-Jul-2025 03:00 PM |
[Contractor Risk and Cost Basis Rehabilitation and UP gradation to two lanes with paved shoulder four lane configurations for the work of NH 561 A Pandharpur Mangalwedha Marwade Umdai from Ch. 40.800 to ch.95.136 Package No.II Length 54.336 in the sta]
[NHD/TC/EPC/2726/2024][2024_MoRTH_830374_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-SOLAPUR - MoRTH |
274 |
11-Oct-2024 09:00 AM |
07-Jul-2025 05:30 PM |
08-Jul-2025 12:00 PM |
[Rehabilitation and Up-gradation to 2 Lane with paved shoulder configuration for the work of Charthana Jintur section of NH 752 I from Design Km.25 100 to 47 100 Design Length 22 00 Km in the State of Maharashtra on EPC Mode]
[EENH/Jalna/Tender/NIT No-06/1644][2024_MoRTH_830341_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH||NH Maharashtra PWD-Nagpur - MoRTH |
275 |
09-Oct-2024 06:55 PM |
23-Jul-2025 12:00 PM |
29-Jul-2025 03:30 PM |
[Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km. 39.000 (Design ch. 7.250 ) of NH-157 in the state of Odisha on EPC Mode]
[08 CE NH of 2024-25][2024_MoRTH_829943_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhubaneswar - MoRTH||NH Odisha PWD-Kesinga - MoRTH |
276 |
08-Oct-2024 06:55 PM |
10-Jul-2025 05:00 PM |
14-Jul-2025 11:00 AM |
[Widening, Reconstruction and Up-gradation to 2PLS configuration for the work of Bhimashankar-Taleghar- Wada- Rajgurunagar the State of Maharashtra on HAM.]
[RO/MUM/TENDER/2022-25/03][2024_MoRTH_829881_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH |
277 |
08-Oct-2024 06:55 PM |
10-Jul-2025 05:00 PM |
14-Jul-2025 11:00 AM |
[ Reconstruction and Up-gradation to 2LPS for the work of Junnar - Ghodegaon - Taleghar Road (NH-61 Spur) from km 13-880 to km 69-820 (Design length - 55.940 Km) in the state of Maharashtra on HAM.]
[RO/MUM/TENDER/2024-24/04][2024_MoRTH_829893_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Mumbai - MoRTH |
278 |
04-Jul-2024 06:55 PM |
04-Aug-2025 11:00 AM |
05-Aug-2025 11:30 AM |
[RFP FOR Construction of 4 lane Jaunpur Bypass from km 80.220 to km 107.780 of NH 135A Pkg I (Jaunpur Akbarpur Section) in the State of Uttar Pradesh on HAM Mode.]
[CE-RO/LKO/NH-135A/PKG I/2023-24 Dated. 04.07.2024][2024_MoRTH_814994_1]
|
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH |
279 |
26-Jun-2024 06:00 PM |
04-Aug-2025 03:00 PM |
05-Aug-2025 03:00 PM |
[Widening Re Construction to Four Lane from Km 0.000 to Km 15.870 Near Miriyan Telangana Karnataka Border Chincholi Section of NH 167N in Kalaburagi District in the State of Karnataka on HAM under Annual Plan 2023 24 ]
[RW/BNG/NH-167N/ Km0-15.850/03/2023][2024_MoRTH_813722_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Bangalore - MoRTH |
280 |
26-Jun-2024 03:00 PM |
04-Aug-2025 03:00 PM |
05-Aug-2025 03:00 PM |
[Widening to Four Lane with Paved Shoulders from NH Chainage Km. 105.780 SH Chainage Km. 537.500 to Km. 128.080 SH Chainange 559.800 Yedegowdanahalli to Arjunahalli section of NH-373 in the State of Karnataka on HAM under NHO Annual Plan 2023 24]
[RW/BNG/NH-373/Km105.780 128.080/27/2024][2024_MoRTH_813655_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Bangalore - MoRTH |
281 |
15-Jun-2024 09:00 AM |
10-Jul-2025 03:00 PM |
11-Jul-2025 03:00 PM |
[Widening to Two Lane Paved Shoulders from Km 0.000 Mudigere to Km 26.326 Mugutihalli of NH 173 Mudigere Kadur section in the State of Karnataka on EPC Mode ]
[RW/BNG/NH-173/Km.0 26.326/13/2023][2024_MoRTH_811988_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Bangalore - MoRTH |
282 |
14-Jun-2024 06:00 PM |
10-Jul-2025 03:00 PM |
11-Jul-2025 03:00 PM |
[Construction of Bypass to the Holenarasipura Town from Km 87.280 near Chikknahalli to Km 97.580 Near Hullahalli on NH 373 in the State of Karnataka on EPC mode ]
[RW/BNG /NH-373/Bypass Holenarasipura/14/2022 ][2024_MoRTH_811973_1]
|
Ministry of Road Transport and Highways||P6 Delhi - MoRTH||RO Bangalore - MoRTH |
283 |
13-Mar-2024 10:00 AM |
24-Jul-2025 03:30 PM |
25-Jul-2025 05:00 PM |
[Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km 154/000 to Km 187/99 (Design Length - 33.99 Km) of NH-39 (Old NH-75E) to four lane with paved shoulder in the State of Madhya Pradesh]
[CE-RO/BPL/Tender/12/2023-24][2024_MoRTH_800261_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH |
284 |
13-Mar-2024 10:00 AM |
24-Jul-2025 03:30 PM |
25-Jul-2025 05:00 PM |
[Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km 119/000 to Km 154/000 (Design Length - 35.00 Km) of NH-39 (Old NH-75E) to four lane with paved shoulder in the State of Madhya Pradesh]
[CE-RO/BPL/Tender/11/2023-24][2024_MoRTH_800258_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH |
285 |
13-Mar-2024 10:00 AM |
24-Jul-2025 03:30 PM |
25-Jul-2025 05:00 PM |
[Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km 82/400 to Km 119/000 (Design Length 36.600 Km) of NH-39 (Old NH-75E) to four lane with paved shoulder in the State of Madhya Pradesh]
[CE-RO/BPL/Tender/10/2023-24][2024_MoRTH_800235_1]
|
Ministry of Road Transport and Highways||P5 Delhi / LWE - MoRTH||RO Bhopal - MoRTH |
286 |
07-Oct-2023 03:00 PM |
16-Jul-2025 03:00 PM |
17-Jul-2025 03:00 PM |
[Rehabilitation and Upgradation to 2 4 lane with paved shoulders from Km 79.300 to Km 87.360 and Km 88.437 to Km 93.819 of NH 167K Bridge Approaches of Iconic Bridge across river Krishna in the State of Telangana and Andhra Pradesh on EPC Basis.]
[RW/HYD/Misc-28/NIT/2023-24/008 dt 07.10.2023][2023_MoRTH_775185_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Hyderabad - MoRTH |
287 |
07-Oct-2023 03:00 PM |
16-Jul-2025 03:00 PM |
17-Jul-2025 03:00 PM |
[Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH 167K Design Chainage km 87.360 to km 88.437 in the States of Telangana and Andhra Pradesh on EPC Basis]
[RW/HYD/Misc-28/NIT/2023-24/007 dt 07.10.2023][2023_MoRTH_775191_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Hyderabad - MoRTH |
288 |
07-Oct-2023 03:00 PM |
16-Jul-2025 03:00 PM |
17-Jul-2025 03:00 PM |
[Rehabilitation and Upgradation of Nehru Nagar to Kothagudem Section to Two Lane Four Lane with Paved Shoulders from Km 178.500 to Km 230.580 of NH 930P in the State of Telangana on EPC Basis]
[RW/HYD/Misc-28/NIT/2023-24/009 dt 07.10.2023][2023_MoRTH_775194_1]
|
Ministry of Road Transport and Highways||P7 Delh - MoRTH||RO Hyderabad - MoRTH |
289 |
15-Sep-2023 05:00 PM |
21-Jul-2025 04:00 PM |
22-Jul-2025 11:00 AM |
[Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode]
[RW/PAT/NH133E/Bhaglpur73/22-23][2023_MoRTH_771865_1]
|
Ministry of Road Transport and Highways |
290 |
26-Apr-2023 06:55 PM |
23-Jul-2025 11:00 AM |
24-Jul-2025 03:00 PM |
[RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh. ]
[CE-RO/LKO/NH 330D/2021-22/Civil Work dt.26.04.2023][2023_MoRTH_750739_1]
|
Ministry of Road Transport and Highways||P2 Delhi - MoRTH||RO Lucknow - MoRTH |