S.No e-Published Date Closing Date Opening Date Title and Ref.No./Tender ID Organisation Chain
1 11-May-2024 10:00 AM 01-Jun-2024 05:00 PM 07-Jun-2024 03:00 PM [Repair of Drains, Tiles, Flooring etc. of Field Hostel-1 to Field Hostel -4, Old B-type and Old C-Type Buildings in Township of Kishanganga Power Station, Bandipora, J and K (PKG-482).] [NH/KG/PnC/TS/PKG-482/2024][2024_NHPC_806820_1] NHPC Limited||Kishanganga Project-NHPC
2 10-May-2024 05:00 PM 24-May-2024 05:00 PM 27-May-2024 03:00 PM [Repair and painting of Nursery School building at CPS 1 Khairi] [NH/CPS-1/PnC/W-1449/2024-25/79 Dated- 10/05/2024][2024_NHPC_806795_1] NHPC Limited||Chamera Power Station-I-NHPC
3 10-May-2024 01:00 PM 31-May-2024 05:00 PM 04-Jun-2024 05:00 PM [Replacement of cover plate of Cable Channel and Repair at Switch Yard area of Sewa-II Power Station Mashka,(JK) (CW-618)] [NH/Sewa2/Cont/CW618/NIT-03/339 Dt.09.05.24 ][2024_NHPC_806636_1] NHPC Limited||Sewa Power Station-NHPC
4 10-May-2024 10:00 AM 30-May-2024 05:00 PM 06-Jun-2024 04:00 PM [Providing protection work near power intake of Uri-II Power Station, JK] [NH/Uri-II/CnP/24-25/113][2024_NHPC_806710_1] NHPC Limited||Uri-II Power Station-NHPC
5 07-May-2024 06:00 PM 22-May-2024 03:00 PM 27-May-2024 03:30 PM [Procurement, Installation, Commissioning and Maintenance work of Early Warning System (EWS)] [NH/TLD-IV PS/W-914/2024/934 ][2024_NHPC_806366_1] NHPC Limited||Teesta Low Dam Project Stage IV-NHPC
6 07-May-2024 05:30 PM 22-May-2024 05:30 PM 28-May-2024 11:30 AM [Providing Security and surveillance Services at Liaison Office, Kolkata, NHPC Ltd., for the period of 24 months] [NH/RO-SLG/C/NIT-01/2024-2025/ ][2024_NHPC_806380_1] NHPC Limited||Siliguri Region Office-NHPC
7 07-May-2024 10:00 AM 27-May-2024 03:00 PM 31-May-2024 03:30 PM [Repair, Maintenance, Flushing and Revival of Twin Tube Piezometer at Baira Dam] [NH/BSPS/CC/CW/01/2024-25/75][2024_NHPC_806263_1] NHPC Limited||Bairasiul Power Station-NHPC
8 06-May-2024 05:00 PM 27-May-2024 06:55 PM 01-Jun-2024 03:00 PM [Supply Installation and Annual maintenance of LED Display board at Nagwain, Parbati HE Project (Stage-II)(Package No. C-741)] [NH/PP-II/PnC/Pkg. No. C-741/2024][2024_NHPC_806100_1] NHPC Limited||Parbati II Project-NHPC
9 04-May-2024 05:00 PM 25-May-2024 06:55 PM 31-May-2024 03:00 PM [Repair of Jigrai Trench Weir surface at Jigrai Nallah site of Parbati H.E. Project (Stage-II), (Package No-C-749)] [NH/PP-II/PnC/Pkg. No. C-749/2024][2024_NHPC_805995_1] NHPC Limited||Parbati II Project-NHPC
10 04-May-2024 11:00 AM 25-May-2024 11:00 AM 28-May-2024 11:00 AM [Construction work of breast wall near the fallen tower near Chudi Bridge of Chamera-III Power Station (Pkg.No. PHC3-04) ] [NH/CPS- III/Cont./PHC3-04/2024-25/ 49][2024_NHPC_806029_1] NHPC Limited||Chamera-III Power Station-NHPC
11 04-May-2024 10:00 AM 20-May-2024 05:00 PM 25-May-2024 03:00 PM [Protection of Left bank road of Intake Adit facing river and slope protection of Right bank at entrance of CFRD at Dam Site Gurez of KGPS, Bandipora (PKG-483)] [NH/KG/PnC/DAM/PKG-483/2024][2024_NHPC_806048_1] NHPC Limited||Kishanganga Project-NHPC
12 03-May-2024 06:55 PM 24-May-2024 05:00 PM 28-May-2024 03:00 PM [Service, repair and maintenance contract of Package/DuctableACs installed at Power House and Colony of Chamera-I Power Station] [NH/CPS-1/PnC/W-1447/2024-25/23 Dated 03/05/2024][2024_NHPC_805991_1] NHPC Limited||Chamera Power Station-I-NHPC
13 02-May-2024 10:00 AM 22-May-2024 03:00 PM 27-May-2024 03:30 PM [Carrying out Annual Maintenance and Repair of underwater parts of three Generating Units of 3X60 MW of BSPS] [NH/BSPS/CC/PH/03/2024-25/66][2024_NHPC_805488_1] NHPC Limited||Bairasiul Power Station-NHPC
14 01-May-2024 06:00 PM 16-May-2024 06:00 PM 20-May-2024 03:00 PM [Supply, Installation and commissioning of MS Effluent Water Digital Flow Meters for Sewage Treatment Plants at Dulhasti Power Station, Kishtwar] [NH/DPS/Cont/NIT-195/2024/ E115348 dated 01.05.2024][2024_NHPC_805572_1] NHPC Limited||Dulhasti Power Station-NHPC
15 01-May-2024 04:00 PM 16-May-2024 05:00 PM 22-May-2024 03:00 PM [Hiring of Consultancy Services for undertaking laboratory testing for impervious clay samples for Construction Material Survey of West Seti HE Project, Nepal] [NH/Cont(EnM)II/PR52723/77/2024][2024_NHPC_805487_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-E and M-CO-NHPC
16 30-Apr-2024 06:55 PM 21-May-2024 06:55 PM 27-May-2024 03:00 PM [Replacement of Wooden Flooring of Badminton Court of Community Hall/Multipurpose Hall at Nagwain Township of Parbati-H.E. Project (Stage-II), (Package No-C-748)] [NH/PP-II/PnC/Pkg. No. C-748/2024][2024_NHPC_805509_1] NHPC Limited||Parbati II Project-NHPC
17 29-Apr-2024 05:00 PM 14-May-2024 05:00 PM 18-May-2024 05:00 PM [Establishment of Water Level and Discharge Sensor for Early Warning System for Chamera III project (Pkg. No. DIII-10)] [NH/CPS- III/Cont./DIII-10/2024-25/33][2024_NHPC_805225_1] NHPC Limited||Chamera-III Power Station-NHPC
18 29-Apr-2024 05:00 PM 20-May-2024 03:00 PM 24-May-2024 03:00 PM [Water Proofing Treatment at roofs of various buildings in residential colony, Alchi.] [NBPS/CnP/2024-25/W-01/215][2024_NHPC_805297_1] NHPC Limited||Nimoo Bazgo Power Station-NHPC
19 29-Apr-2024 05:00 PM 20-May-2024 05:00 PM 25-May-2024 03:00 PM [Painting of temporary and permanent KVS building at Sainj, Parbati-H.E. Project (Stage-II), (Package No-C-750)] [NH/PP-II/PnC/Pkg. No. C-750/2024][2024_NHPC_805204_1] NHPC Limited||Parbati II Project-NHPC
20 29-Apr-2024 10:00 AM 21-May-2024 05:00 PM 29-May-2024 04:00 PM [NH/Uri-II/CnP/24-25/112] [NH/Uri-II/CnP/24-25/112 ][2024_NHPC_805275_1] NHPC Limited||Uri-II Power Station-NHPC
21 29-Apr-2024 10:00 AM 21-May-2024 05:00 PM 29-May-2024 04:00 PM [Supply and Installation of anti-corrosive coating and Thermal lagging of cooling water pipe line at Uri-II Power House] [NH/Uri-II/CnP/24-25/111][2024_NHPC_805274_1] NHPC Limited||Uri-II Power Station-NHPC
22 27-Apr-2024 06:00 PM 13-May-2024 03:00 PM 17-May-2024 03:30 PM [Establishment of Automatic Water Level Recorder (AWLR)/ Velocity Sensor for Early Warning System at Upstream GnD sites for TLD-III PS reservoir] [NH/TLD-IIIPS/PROC/F-1150/33][2024_NHPC_805255_1] NHPC Limited||Teesta Low Dam III Power Station-NHPC
23 26-Apr-2024 05:00 PM 07-Jun-2024 05:30 PM 12-Jun-2024 11:30 AM [Sale of Power from 50 MW Wind Power Project, Jaisalmer] [NH/CCW/CC-I/CO-307/PR60823/10 ][2024_NHPC_804799_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
24 25-Apr-2024 05:00 PM 16-May-2024 05:00 PM 24-May-2024 11:00 AM [Repairing of CRPF barrack at Power House Colony, Leimatak.] [NH-LPS-HOP012(22)/1/2024-CD I and III/1039][2024_NHPC_805002_1] NHPC Limited||Loktak power station-NHPC
25 25-Apr-2024 12:05 PM 17-May-2024 03:00 PM 22-May-2024 03:00 PM [Supply and Installation of Dewatering Pump Motor set along with pipe, valves, fitting etc. of Power House at Nimoo Bazgo PS, Alchi, Leh.] [NBPS/CnP/2024-25/W-03/217][2024_NHPC_804928_1] NHPC Limited||Nimoo Bazgo Power Station-NHPC
26 24-Apr-2024 05:30 PM 15-May-2024 03:00 PM 20-May-2024 03:00 PM [Repair of Dam Gallery of Nimoo Bazgo Power Station.] [NBPS/CnP/2024-25/W-02/216 ][2024_NHPC_804441_1] NHPC Limited||Nimoo Bazgo Power Station-NHPC
27 24-Apr-2024 03:00 PM 14-May-2024 05:00 PM 21-May-2024 03:00 PM [Deployment of Security Guard/ Supervisor (Ex-Servicemen) at TLD IV-PS (for Kalijhora and Vidyut Nagar] [NH/TLD-IV PS/P and C/W-912/2024/899 ][2024_NHPC_804760_1] NHPC Limited||Teesta Low Dam Project Stage IV-NHPC
28 23-Apr-2024 03:00 PM 14-May-2024 03:00 PM 23-May-2024 03:00 PM [Repair and HP-HVOF coating of four sets of Guide Vanes (one set comprising 20 Nos. Guide Vanes) of Dhauliganga Power Station (2024-25)] [NH/DG/Contract/1044/2024-25/04 Dated 23/04/2024][2024_NHPC_804606_1] NHPC Limited||Dhauliganga Power Station-NHPC
29 23-Apr-2024 03:00 PM 14-May-2024 03:00 PM 23-May-2024 03:00 PM [Repair and HP-HVOF Coating of 04 Nos. Runners of 70 MW Francis Hydro Turbine of Dhauliganga Power Station (2024-25)] [NH/DG/Contract/1046/2024-25/05 Dated 23/04/2024][2024_NHPC_804630_1] NHPC Limited||Dhauliganga Power Station-NHPC
30 23-Apr-2024 11:30 AM 14-May-2024 11:30 AM 17-May-2024 11:30 AM [Repair and Painting of A-type and B-type quarters at TPS Banbasa] [NH/TPS/PnC/NIT/202 /E108197/1014/33 dt 22/04/2024][2024_NHPC_804607_1] NHPC Limited||Tanakpur Power Station-NHPC
31 20-Apr-2024 05:00 PM 11-May-2024 05:00 PM 21-May-2024 11:00 AM [Repairing of Water Supply System in Old Colony and New Colony of Loktak Project.] [NH-LPS-CDIV/5/2023-CIVIL/1038][2024_NHPC_804464_1] NHPC Limited||Loktak power station-NHPC
32 19-Apr-2024 06:00 PM 16-May-2024 05:00 PM 24-May-2024 12:00 PM [Repair and Overhauling of four (04) numbers Aqua Make 150 HP Drainage / Dewatering Submersible pumps of TLD-IV Power Station] [NH/TLD-IV PS/P and C/W-906/2024/ 889 ][2024_NHPC_804362_1] NHPC Limited||Teesta Low Dam Project Stage IV-NHPC
33 18-Apr-2024 06:00 PM 17-May-2024 05:00 PM 21-May-2024 04:00 PM [Construction of High Raised Watch Tower near Pump House at TRC area of Sewa-II Power Station, Mashka, JK(CW-620)] [NH/Sewa2/Cont/CW620/NIT-02/309 Dt.18.04.24][2024_NHPC_804311_1] NHPC Limited||Sewa Power Station-NHPC
34 18-Apr-2024 11:00 AM 15-May-2024 04:00 PM 22-May-2024 03:00 PM [Restoration of Damaged Left Bank Sainj Suind Road between RD 567 (U/s) to RD 1284 (D/s) and boundary wall of CISF Camp, Sallah of Parbati-III Power Station] [PR11923/281/1 Damaged Left Bank Sainj Suind Road ][2024_NHPC_804165_1] NHPC Limited||Parbati III Power Station-NHPC
35 15-Apr-2024 05:00 PM 13-May-2024 05:00 PM 22-May-2024 03:00 PM [Renovation of 36A Type quarters at NHPC Colony, Nigalpani, DGPS] [NH/DG/Contract/1045/2024-25/03 Dated 15/04/2024][2024_NHPC_803975_1] NHPC Limited||Dhauliganga Power Station-NHPC
36 11-Apr-2024 03:00 PM 18-May-2024 05:00 PM 22-May-2024 03:30 PM [Supply and Laying of 12 Core Optical Fiber Cable from Admin block via 132 KV switchyard Semna colony to Hunjala Dul Dam area at DPS, Kishtwar] [NH/DPS/CONT/NIT-183/2024/ E114442 dated 11.04.2024][2024_NHPC_803499_1] NHPC Limited||Dulhasti Power Station-NHPC
37 10-Apr-2024 06:30 PM 22-May-2024 05:00 PM 27-May-2024 03:30 PM [Lot- 5B Package for Hydro-Mechanical Works for Intake and Draft Tube Gates and Hoists of Dibang Multipurpose Project, 2880 MW , located in Lower Dibang Valley District in the State of Arunachal Pradesh, India] [NH/CCW/CCIII/CO310/PR12923/177][2024_NHPC_803559_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
38 09-Apr-2024 06:00 PM 13-May-2024 03:00 PM 17-May-2024 03:00 PM [Protective measures of left bank road adjacent to spillway radial gate-1 up to CISF exit post at TLD-III PS] [NH/TLD-III PS/Cont/F-1149/02][2024_NHPC_802785_1] NHPC Limited||Teesta Low Dam III Power Station-NHPC
39 09-Apr-2024 02:00 PM 21-May-2024 05:00 PM 25-May-2024 03:30 PM [Repairing of 02 Nos Multistage case booster pump WL 100/4 and 02 Nos 3 (Three) Phase induction motor 170 HP (125 KW) at Shalimar Pumping Station at DPS Kishtwar] [NH/DPS/CONT/NIT-184/2024/ E112876 dated 09.04.2024][2024_NHPC_803358_1] NHPC Limited||Dulhasti Power Station-NHPC
40 05-Apr-2024 10:00 AM 14-May-2024 05:00 PM 18-May-2024 04:30 PM [Modification/Refurbishment with design and engineering of three Monorail Hoists with supply of different components and installation and commissioning for making the hoists fully functional at Dam site of Dulhasti Power Station, NHPC Ltd., Kishtwar] [NH/DPS/CONT/NIT-188/2024/ E112711 dated 05.04.2024][2024_NHPC_802879_1] NHPC Limited||Dulhasti Power Station-NHPC
41 03-Apr-2024 10:00 AM 11-May-2024 05:00 PM 16-May-2024 04:00 PM [Creation of CRECHE/ DAY CARE CENTRE facility at Uri-II Power Station-Repair and Painting work of some portion of Nursery School building at Nowpora complex thereof ] [NH/Uri-II/CnP/24-25/110][2024_NHPC_802742_1] NHPC Limited||Uri-II Power Station-NHPC
42 27-Mar-2024 03:00 PM 23-May-2024 05:30 PM 30-May-2024 04:00 PM [Upgradation of SCADA System at Teesta-V Power Station- Ensuring Efficiency and Security] [NH/TSV/Cont/EC-150/NIT-908][2024_NHPC_802327_1] NHPC Limited||Teesta-V Power Station-NHPC
43 18-Mar-2024 06:00 PM 14-May-2024 05:30 PM 20-May-2024 04:00 PM [Repair of two numbers of Servomotors of Teesta-V Power Station] [NH/TSV/Cont/MC-138/NIT-906][2024_NHPC_801444_1] NHPC Limited||Teesta-V Power Station-NHPC
44 15-Mar-2024 06:00 PM 24-May-2024 05:30 PM 29-May-2024 11:30 AM [Selection of RE Power Developers For Supply of 1200MW Firm and Dispatchable power from ISTS connected Renewable Energy Power Projects coupled with energy storage system on anywhere in India basis under Tariff Based Competitive Bidding (TBCB)-II] [NH/CCW/CC-III/CO-301 /PR16923/45][2024_NHPC_800202_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
45 07-Mar-2024 03:00 PM 21-May-2024 05:30 PM 27-May-2024 04:00 PM [Repair and maintenance of Project Hospital and Incinerator room Helipad at NHPC Teesta V Power station Balutar] [NH/TSV/Cont/CC-321/NIT-899][2024_NHPC_799335_1] NHPC Limited||Teesta-V Power Station-NHPC
46 07-Mar-2024 11:00 AM 13-May-2024 05:00 PM 18-May-2024 03:00 PM [Channelization of Seepage in Transformer Cavern, MAT Portal, MIV floor, Platform on GIS floor crane beam of Power House Parbati III Power Station, Behali] [PR11923/210/1Channelization of Seepage in powerhou][2024_NHPC_798865_1] NHPC Limited||Parbati III Power Station-NHPC
47 06-Mar-2024 11:00 AM 13-May-2024 05:00 PM 17-May-2024 03:00 PM [Design, supply, erection and commissioning of mono rail for lifting arrangement of Drainage and Dewatering system] [PR11923/151/1supply erection commission of monorai][2024_NHPC_798857_1] NHPC Limited||Parbati III Power Station-NHPC
48 02-Mar-2024 03:00 PM 11-May-2024 05:30 PM 17-May-2024 04:00 PM [Drilling of 02 Bore wells and installation of casing and submersible pumps along with connecting to water Supply tank pipe line at Balutar colony Right bank Teesta V Power Station] [NH/TSV/Cont/CC-320/NIT-897][2024_NHPC_798540_1] NHPC Limited||Teesta-V Power Station-NHPC
49 13-Feb-2024 06:30 PM 15-May-2024 03:00 PM 22-May-2024 03:00 PM [Regarding repair and servicing of Tata Hitachi make wheel loader TWL3036] [NH/SPS/PNC/NIT-07/2023-24/990 Dt1202][2024_NHPC_795174_1] NHPC Limited||Salal Power Station-NHPC
50 11-Jan-2024 03:30 PM 20-May-2024 05:30 PM 23-May-2024 11:30 AM [Expression of Interest (EOI) From Any Indian / Global Company FOR Empanelment with NHPC Ltd regarding the Development of Offshore Wind Power Projects in India.] [CC-III/CO-284/PR16923/37 ][2024_NHPC_788618_2] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
51 06-Nov-2023 11:30 AM 14-May-2024 02:30 PM 16-May-2024 03:00 PM [Package-I Civil Work of Dugar HE Project, 500 MW, Himachal Pradesh, India.] [NH/CCW/CC-V/CO-270/PR16223/22][2023_NHPC_775644_1] NHPC Limited||Corporate Office-Faridabad-NHPC||Contract-Civil-CO-NHPC
 