1. |
02-Jul-2025 06:30 PM |
07-Jul-2025 03:30 PM |
07-Jul-2025 04:00 PM |
[Work contract for beakdown maintenance of Boiler Pressure parts of 2x600 MW, Unit-1 and 2, Stage-I, SSTPP, MPPGCL, Dongalia.]
[WE-2630][2025_MPPGC_800521_4]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)- Shri Singaji Thermal Power Station- MPPGCL
|
2. |
04-Jul-2025 10:35 AM |
07-Jul-2025 03:30 PM |
07-Jul-2025 04:00 PM |
[Work for Providing 08 Nos. VTC trained persons on contractual basis to deploy immidiately at CIC Area of M/s SECL from where rakes are frequenty dispatched to SGTPS, MPPGCL, Birsinghpur and other Power Houses of MPPGCL for witnessing the work of 3rd]
[Enq./W-28/1159][2025_MPPGC_804040_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Sanjay Gandhi Thermal Power Station- MPPGCL
|
3. |
27-Jun-2025 04:30 PM |
07-Jul-2025 03:30 PM |
07-Jul-2025 04:00 PM |
[Enquiry for Availing Expert Supervisory Service for Overhauling of LRSB during (AOH) of 1x500 MW unit at SGTPS, MPPGCL, Birsinghpur. ]
[Enq./W-25/1004][2025_MPPGC_803375_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Sanjay Gandhi Thermal Power Station- MPPGCL
|
4. |
23-Jun-2025 10:00 AM |
07-Jul-2025 03:30 PM |
07-Jul-2025 04:00 PM |
[Retender for premises required on lease basis for palampur distt kangra H.P. 176061]
[Retender for Premises shifting in palampur distt k][2025_UBoI_802619_1]
|
Union Bank of India||Regional office Chandigarh-UBoI
|
5. |
01-Jul-2025 04:40 PM |
07-Jul-2025 03:30 PM |
07-Jul-2025 04:00 PM |
[Enquiry for procurement of Bearings for turbine Auxiliaries C category for unit no. 1 to 4, at SGTPS, MPPGCL, Birsinghpur. ]
[Enq./P-10/868][2025_MPPGC_803692_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Sanjay Gandhi Thermal Power Station- MPPGCL
|
6. |
02-Jul-2025 05:00 PM |
07-Jul-2025 03:30 PM |
07-Jul-2025 04:00 PM |
[Work contract for Preparation and Operation of Sky Climber Assembly/ Scaffolding in Boiler Pressure part of Unit 1 and 2, 2x600 MW, SSTPP, MPPGCL, Dongalia]
[WE-2629][2025_MPPGC_800531_4]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)- Shri Singaji Thermal Power Station- MPPGCL
|
7. |
01-Jul-2025 04:20 PM |
07-Jul-2025 03:30 PM |
07-Jul-2025 04:00 PM |
[Enquiry for procurement of Various types of Gland Packing for Boiler and Turbine area 1x500 MW, at SGTPS, MPPGCL, Birsinghpur. ]
[Enq./P-07/719][2025_MPPGC_803683_2]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Sanjay Gandhi Thermal Power Station- MPPGCL
|
8. |
01-Jul-2025 01:40 PM |
07-Jul-2025 03:30 PM |
07-Jul-2025 04:00 PM |
[Enquiry for procurement of Rubber Suction Hose for 2 nos. Fire Tender at SGTPS, MPPGCL, Birsinghpur. ]
[Enq./P-09/839][2025_MPPGC_803648_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Sanjay Gandhi Thermal Power Station- MPPGCL
|
9. |
11-Jun-2025 12:30 PM |
07-Jul-2025 03:30 PM |
07-Jul-2025 03:30 PM |
[BOLT AND NUTS FOR UY-168 to 170]
[UCSL/MAT/PROJ/2025-26/1566 dt 11.06.2025][2025_CSL_801294_2]
|
Cochin Shipyard Limited||ISD-CSL
|
10. |
01-Jul-2025 09:00 AM |
07-Jul-2025 03:30 PM |
08-Jul-2025 03:30 PM |
[Work Enquiry for Work of rehabilitation of Coal Settling tanks installed at various location of CHP-IV, STPS, MPPGCL, Sarni.]
[WE-336][2025_MPPGC_803598_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Satpura Thermal Power Station Sarni MPPGCL
|