1. |
30-Jan-2023 05:55 PM |
31-Jan-2023 03:30 PM |
31-Jan-2023 04:00 PM |
[Work of Routine Maintenance contract of boiler firing system coal feed system fuel oil pressuring /unloading system and HP/LP dozing system alongwith complete fan group including LOP system for Unit No. 1 and 2 of PH-I at SGTPS MPPGCL Birsinghpur ]
[4078][2023_MPPGC_696727_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Sanjay Gandhi Thermal Power Station- MPPGCL
|
2. |
11-Jan-2023 01:00 PM |
31-Jan-2023 03:30 PM |
31-Jan-2023 04:00 PM |
[ENQUIRY FOR WORK CONTRACT OF FABRICATION, INSTALLATION AND TESTING OF GANTRY CRANE FOR CW MOTOR AT 2 X 10 MW BHPS-IV JHINNA]
[91-84/PNW/W/2270][2022_MPPGC_689520_3]
|
Madhya Pradesh Power Generating Company Limited||Addl Chief Engineer (THC)- Tons Hydel Power Station- MPPGCL
|
3. |
11-Jan-2023 01:00 PM |
31-Jan-2023 03:30 PM |
31-Jan-2023 04:00 PM |
[ENQUIRY FOR SUPPLY OF MASTER FIRE ALARM CONTROL PANEL AT 2 X 15 MW BHPS-II SILPARA]
[91-84/PNW/P/2074][2022_MPPGC_687082_3]
|
Madhya Pradesh Power Generating Company Limited||Addl Chief Engineer (THC)- Tons Hydel Power Station- MPPGCL
|
4. |
16-Jan-2023 04:30 PM |
31-Jan-2023 03:30 PM |
31-Jan-2023 04:00 PM |
[Enquiry for Procurement of Graphite Seal Ring with Anti Extrusion SS Cap and spiral wound gasket for the valves used in boiler of 2x660 MW Unit, SSTPP Dongalia.]
[PE-1954][2023_MPPGC_694883_1]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)- Shri Singaji Thermal Power Station- MPPGCL
|
5. |
27-Jan-2023 02:00 PM |
31-Jan-2023 03:30 PM |
31-Jan-2023 04:00 PM |
[Enquiry for work of hiring of one no. Diesel car for conveyance of S.E.(ETnI)-III, at SGTPS, MPPGCL, Brs.]
[Enq.07/W- 07/845][2023_MPPGC_696372_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Sanjay Gandhi Thermal Power Station- MPPGCL
|
6. |
24-Jan-2023 02:55 PM |
31-Jan-2023 03:30 PM |
31-Jan-2023 04:00 PM |
[Enquiry for the work of Hiring of one number Tata Indica and equivalent (AC) Car for official duty of SE (OPN)-III of 1X500 MW Unit no. 5 SGTPS, MPPGCL Birsinghpur ]
[1079][2023_MPPGC_696025_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Sanjay Gandhi Thermal Power Station- MPPGCL
|
7. |
23-Jan-2023 03:40 PM |
31-Jan-2023 03:30 PM |
31-Jan-2023 04:00 PM |
[Work of sealing of coal loaded trucks covered with necessary security seals at various mines of SECL at loading end on behalf of MPPGCL, for S.E. (Services)-II, SSTPP, ]
[WE-1892][2022_MPPGC_687984_4]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)- Shri Singaji Thermal Power Station- MPPGCL
|
8. |
23-Jan-2023 06:00 PM |
31-Jan-2023 03:30 PM |
31-Jan-2023 04:00 PM |
[Hiring of se oandm vehicle at Rajghat Hydel power station as per schedule]
[ENQ28][2023_MPPGC_695898_2]
|
Madhya Pradesh Power Generating Company Limited||Superintending Engineer(O and M)- Rajghat Hydel Power Station- MPPGCL
|
9. |
25-Jan-2023 12:00 PM |
31-Jan-2023 03:30 PM |
31-Jan-2023 04:00 PM |
[Dismantling, loading, unloading erection and commissioning of REL DRILL SL.No.6021808.]
[na-3212-exc-qr 20 - of 2022-23][2023_WCL_696109_1]
|
Western Coalfields Limited||WCL-Nagpur Area
|
10. |
24-Jan-2023 03:00 PM |
31-Jan-2023 03:30 PM |
31-Jan-2023 04:00 PM |
[work]
[ma4406-enm-0006-2022-23][2023_WCL_695983_1]
|
Western Coalfields Limited||WCL-Majri Area
|