Logo
Notices ePublishing System, Government of India
 
 
 
  Tenders/Auctions Closing Today
 
 
 Search By     
 
 
 
 
S.No e-Published Date Bid Submission Closing Date Tender Opening Date Title and Ref.No./Tender ID Organisation Chain
1. 30-Sep-2022 01:40 PM 01-Oct-2022 10:00 AM 01-Oct-2022 11:00 AM [GENERATOR ROTOR SLIP RING IN-SITU MACHINING AND POLISHING OF UNIT-2, 210 MW (KWU DESIGN) AT MEJIA TPS, DVC, WEST BENGAL.] [PSER-PUR-MJA-S496-22 ][2022_BHEL_680574_1] Bharat Heavy Electricals Limited||BHEL-Power Sector Eastern Regions, Kolkata
2. 13-Sep-2022 04:20 PM 01-Oct-2022 10:00 AM 01-Oct-2022 02:30 PM [Modification and restoration of existing CCTV surveillance system at PPPU, Thirumayam] [PPPU_WC_22_017][2022_BHEL_677983_1] Bharat Heavy Electricals Limited||BHEL-Power Plant Piping Unit, Thirumayam||MM - PPPU
3. 24-Sep-2022 12:30 PM 01-Oct-2022 10:45 AM 01-Oct-2022 11:00 AM [Distempering and Painting and PF Vitrified Floor Tile in IQAC D.E GENERAL corridor 3 Floor wing A, dministrative Block AMU. Based on DSR 2018] [104/Bldg/22][2022_AMU_679695_1] Aligarh Muslim University||Building Department
4. 24-Sep-2022 12:30 PM 01-Oct-2022 10:45 AM 01-Oct-2022 11:00 AM [a. Replacement of damaged G.I shed of store near Assembly Hall, Main Building ZHCET b. Repair work of valley GI shed Gola etc in workshop D o mechanical Engineering, ZHCET c. Re pointing of Roof, Repair of Parapet Plaster, Gola etc and Replace] [103/Bldg/22][2022_AMU_679693_1] Aligarh Muslim University||Building Department
5. 24-Sep-2022 12:00 PM 01-Oct-2022 10:45 AM 01-Oct-2022 11:00 AM [Renovation of two Toilet Near Library First Floor and Second Floor JNMCH. Based on DSR-2018] [101/Bldg/22][2022_AMU_679689_1] Aligarh Muslim University||Building Department
6. 24-Sep-2022 12:00 PM 01-Oct-2022 10:45 AM 01-Oct-2022 11:00 AM [P F Vitrified Floor Tiles in Principal Office, ZHCET. Based on DSR-2018] [100/Bldg/22][2022_AMU_679688_1] Aligarh Muslim University||Building Department
7. 24-Sep-2022 01:00 PM 01-Oct-2022 10:45 AM 01-Oct-2022 11:00 AM [Raising of Existing Low Lying Pathway in front of G.I. Shed Classrooms up to FM lab Pathway by 80 mm thick CC Paver Blocks, D o Mechanical Engineering. Based on DSR-2018] [110/Bldg/22][2022_AMU_679707_1] Aligarh Muslim University||Building Department
8. 24-Sep-2022 01:00 PM 01-Oct-2022 10:45 AM 01-Oct-2022 11:00 AM [Distempering Painting in R.P. Unit, Administrative Block, AMU Aligarh. Based on DSR-2018] [109/Bldg/22][2022_AMU_679705_1] Aligarh Muslim University||Building Department
9. 24-Sep-2022 01:00 PM 01-Oct-2022 10:45 AM 01-Oct-2022 11:00 AM [Providing and laying Paver Block AND Raising of Manholes at Canteen JNMC. Based on DSR-2018] [108/Bldg/22][2022_AMU_679704_1] Aligarh Muslim University||Building Department
10. 24-Sep-2022 01:00 PM 01-Oct-2022 10:45 AM 01-Oct-2022 11:00 AM [Construction of Pre-Feb boundary wall along with two MS Gate in front of Duplex Quarter. Based on DSR-2018] [107/Bldg/22][2022_AMU_679702_1] Aligarh Muslim University||Building Department
Contents owned and maintained by concerned Departments in coordination with Finance Department and Information Technology Department, Government of India