1. |
25-May-2023 06:55 PM |
05-Jun-2023 03:30 PM |
05-Jun-2023 04:00 PM |
[Work contract of complete repairing/refurbishment of Raw water in house discharge valve gear box installed at 2x660 MW, SSTPP, MPPGCL,Dongalia.]
[WE-2100][2023_MPPGC_710724_2]
|
Madhya Pradesh Power Generating Company Limited||Executive Director(Gen.)- Shri Singaji Thermal Power Station- MPPGCL
|
2. |
26-May-2023 06:30 PM |
05-Jun-2023 03:30 PM |
05-Jun-2023 04:00 PM |
[Urgent operation of water supply valves situated in different locations of DEF type colony for facilitating the water supply in colony area under sector no 3 to 7 at STPS Sarni ]
[T-187][2023_MPPGC_712883_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Satpura Thermal Power Station Sarni MPPGCL
|
3. |
17-May-2023 06:00 PM |
05-Jun-2023 03:30 PM |
05-Jun-2023 04:00 PM |
[Enquiry for supply of wireless intake level measurement set with complete installation at 3 x 105 MW THPS-I, MPPGCL,Sirmour,Distt. Rewa (M.P.)]
[91-84/PNW/P/3361][2023_MPPGC_705854_3]
|
Madhya Pradesh Power Generating Company Limited||Addl Chief Engineer (THC)- Tons Hydel Power Station- MPPGCL
|
4. |
02-Jun-2023 06:00 PM |
05-Jun-2023 03:30 PM |
05-Jun-2023 04:00 PM |
[ENQUIRY FOR WORK CONTRACT FOR INSTALLATION OF NEW MIV TABLE TYPE HYDRAULIC CONTROL PANEL,BRAKE DUST COLLECTOR,MIV HYDRAULIC BYPASS VALVE AND FLOW METERS IN 3 DIFFERENT SIZES PIPE LINES IN UNIT 1 AS PER SCOPE OF WORK AT THPS SIRMOUR]
[91-84/PNW/W/531][2023_MPPGC_712506_3]
|
Madhya Pradesh Power Generating Company Limited||Addl Chief Engineer (THC)- Tons Hydel Power Station- MPPGCL
|
5. |
17-May-2023 06:00 PM |
05-Jun-2023 03:30 PM |
05-Jun-2023 04:00 PM |
[Enquiry for supply of Rotor temperature indicator set at 3 x 105 MW THPS-I,MPPGCL, Sirmour,Distt. Rewa (M.P.)]
[91-84/PNW/P/3363][2023_MPPGC_705857_3]
|
Madhya Pradesh Power Generating Company Limited||Addl Chief Engineer (THC)- Tons Hydel Power Station- MPPGCL
|
6. |
25-May-2023 12:30 PM |
05-Jun-2023 03:30 PM |
05-Jun-2023 04:00 PM |
[Replacement of major spares of Apron Feeders at Downhill 11C for FY 2023 24 reg]
[GM PL OCSL Plant LTE 2023 811][2023_NMDC_712638_1]
|
NMDC Limited||NMDC Ltd.-Kirandul||Services Mechanical
|
7. |
18-May-2023 04:00 PM |
05-Jun-2023 03:30 PM |
05-Jun-2023 04:00 PM |
[ENQ-08]
[ENQ-08][2023_MPPGC_711717_1]
|
Madhya Pradesh Power Generating Company Limited||Superintending Engineer(O and M)- Rajghat Hydel Power Station- MPPGCL
|
8. |
30-May-2023 01:20 PM |
05-Jun-2023 03:30 PM |
05-Jun-2023 04:00 PM |
[Procurement of drum type coupling and its auxiliaries for travelling tripper installed at 1x500 MW CHP, at SGTPS, MPPGCL Birsinghpur ]
[Enq./P-106/659][2023_MPPGC_713198_1]
|
Madhya Pradesh Power Generating Company Limited||Chief Engineer(Gen.)- Sanjay Gandhi Thermal Power Station- MPPGCL
|
9. |
01-Jun-2023 06:00 PM |
05-Jun-2023 03:30 PM |
05-Jun-2023 04:00 PM |
[ENQUIRY FOR WORK CONTRACT OF SERVICING AND CLEANING OF GENERATOR AIR COOLER,FABRICATION OF ITS DRAIN PIPELINES MOUNTING OF VENTING VALVES AND SERVICING OF ITS ALL ASSOCIATED VALVES OF UNIT #1 AT 3 X 105 MW THPS SIRMOUR]
[91-84/PNW/W/642][2023_MPPGC_713557_1]
|
Madhya Pradesh Power Generating Company Limited||Addl Chief Engineer (THC)- Tons Hydel Power Station- MPPGCL
|
10. |
29-May-2023 11:00 AM |
05-Jun-2023 03:30 PM |
05-Jun-2023 04:00 PM |
[Parties who have done such type of jobs have to quote rates submit copy of earlier work order placed by WCL/]
[na-3210-enm-q-010-2023-24][2023_WCL_712959_1]
|
Western Coalfields Limited||WCL-Nagpur Area
|