Tenders By Closing Date
Tenders Closing by Day
Closing Date
E.g., 24-Jan-2021
Enter Captcha
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 2380
« Previous123456789...237238Next »
Sl.No. e-Published Date Bid Submission Closing Date Tender Opening Date Title and Ref.No./Tender Id State Name Corrigendum
1. 11-Dec-2020 06:00 PM 26-Dec-2020 06:30 PM 28-Dec-2020 04:00 PM Construction of WBM Road at mahankal colony in Ward no.05 Dewas 129/Pwd/20 date 11-12-2020 / 2020_UAD_118170_1 Madhya Pradesh --
2. 19-Dec-2020 02:00 PM 26-Dec-2020 01:00 PM 26-Dec-2020 02:00 PM TENDER NO 130/EDCL/2020-21 130/EDCL/2020-21 / 2020_MVVNL_536182_2 Uttar Pradesh --
3. 21-Dec-2020 09:00 AM 26-Dec-2020 12:00 PM 26-Dec-2020 04:00 PM Supply and carriage of pea gravel 2.00 mm to 3.35 mm size from Lal Kuwan to Munderwa Store Basti, Tubewell construction division, Gorakhpur 11/EENKGKP/2020-21 DATE 10-12-2020 / 2020_UPIDM_539497_1 Uttar Pradesh --
4. 21-Dec-2020 09:00 AM 26-Dec-2020 12:00 PM 26-Dec-2020 04:00 PM Supply and carriage of pea gravel 2.00 mm to 3.35 mm size from Lal Kuwan to Pipeeganj store Gorakhpur Tubewell Construction Division Gorakhpur 10/EENKGKP/2020-21 DATE 10-12-2020 / 2020_UPIDM_539492_1 Uttar Pradesh --
5. 12-Dec-2020 03:20 PM 26-Dec-2020 06:00 PM 28-Dec-2020 10:00 AM Supply of Bearing housing assembly with belt pulley ACSM/RCNO/327/2020/E / 2020_TNCSF_187632_1 Tamil Nadu --
6. 19-Dec-2020 02:00 PM 26-Dec-2020 02:00 PM 28-Dec-2020 02:00 PM Channelization of Shayok river at Hunderi village Nobra 38 of I and FC of 2020-21 / 2020_PWD_1757_4 Ladakh UT --
7. 21-Dec-2020 09:00 AM 26-Dec-2020 12:00 PM 26-Dec-2020 03:00 PM Supply and carriage of pea gravel 2.00 mm to 3.35 mm size from Lal Kuwan to Gauribazar store Deoria Tubewell Construction Division Gorakhpur 13/EENKGKP/2020-21 DATE 10-12-2020 / 2020_UPIDM_539501_1 Uttar Pradesh --
8. 12-Dec-2020 04:00 PM 26-Dec-2020 05:30 PM 28-Dec-2020 03:00 PM Construction of C.C. Drain 3734/PWD/Cons/2020 Katni, Dated 10.12.2020 / 2020_UAD_118151_7 Madhya Pradesh --
9. 12-Dec-2020 03:35 PM 26-Dec-2020 06:00 PM 28-Dec-2020 10:00 AM Supply of Pan injection pump with coupling ACSM/RCNO/328/2020/E / 2020_TNCSF_187635_1 Tamil Nadu --
10. 12-Dec-2020 03:45 PM 26-Dec-2020 06:00 PM 28-Dec-2020 10:00 AM Supply of super heated water wash pump ACSM/RCNO/329/2020/E / 2020_TNCSF_187636_1 Tamil Nadu --
« Previous123456789...237238Next »