| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 23011. |
30-Mar-2026 06:30 PM |
06-Apr-2026 06:55 PM |
07-Apr-2026 10:00 AM |
Estimate for providing and fixing RCC Grill from Mahavir Colony Puliya to Bye pass road near Chandawali Disposed in Ward No. 39 Ballabgarh.(Recall)/2026CED12748 E69C 4F2D BA1B 331E3003DAB8284ULB/2026_HRY_511992_1 |
Haryana |
-- |
| 23012. |
30-Mar-2026 06:30 PM |
06-Apr-2026 06:55 PM |
07-Apr-2026 10:00 AM |
Construction of Toilet Block at Market Sector-22 in Ward No. 04, Ballabgarh.(Recall)/202600945538 7294 45CE 85F7 D62C9E6D48E1284ULB/2026_HRY_511994_1 |
Haryana |
-- |
| 23013. |
30-Mar-2026 06:30 PM |
06-Apr-2026 06:55 PM |
07-Apr-2026 10:00 AM |
Construction of Kitchen/Store in the area of Arya Nagar Community Centre in Ward No. 42, Ballabgarh. (Recall)/2026F01F3D74 ADD1 4D6F AC71 A31F1B6D2E33284ULB/2026_HRY_511905_1 |
Haryana |
-- |
| 23014. |
30-Mar-2026 06:55 PM |
06-Apr-2026 06:55 PM |
07-Apr-2026 11:00 AM |
Providing and laying 250mm dia S.W. Pipe Sewer line in Village Bhankri, Ward No.19 (New), Faridabad./2026A81FE283 7847 4BCE 8BE6 C428BA0E3F0E284ULB/2026_HRY_511949_1 |
Haryana |
-- |
| 23015. |
30-Mar-2026 06:55 PM |
06-Apr-2026 06:55 PM |
07-Apr-2026 10:00 AM |
Construction of CFC Centre at Adarsh Nagar Community Center, Ward No. 39, Ballabgarh, Faridabad. (Recall)/2026C7733BFB D2B5 485F AC8B 00CF5E96FB02284ULB/2026_HRY_511996_1 |
Haryana |
-- |
| 23016. |
30-Mar-2026 06:55 PM |
06-Apr-2026 06:55 PM |
07-Apr-2026 10:00 AM |
Estimate for Construction of RCC Nallah 2ft wide from Holy Chowk (RHS) to Gaunchi Drain in Ward No. 03, Ballabgarh. (Recall)/20261387D7BA BBE2 406E 9680 18527ACFB852284ULB/2026_HRY_511876_1 |
Haryana |
-- |
| 23017. |
30-Mar-2026 06:55 PM |
06-Apr-2026 06:55 PM |
07-Apr-2026 10:00 AM |
Estimate for Providing and laying 600mm dia. RCC NP-3 sewer line and making connection of surrounding streets through 200mm dia. S. W. Sewer line at 22 ft road Sanjay Colony in Ward No. 04, Ballabgarh. (Recall)/20260EA1D51D 846E 48EE B810 38A3AA42449C284ULB/2026_HRY_512000_1 |
Haryana |
-- |
| 23018. |
30-Mar-2026 06:55 PM |
06-Apr-2026 06:55 PM |
07-Apr-2026 10:00 AM |
Estimate for P/L 200mm dia. S.W. Sewer line, 100mm dia. PVC water supply line and RMC M-25 grade with 80mm thick M-40 grade interlocking tiles both side in Gali No. 46-47 33ft. road, Sanjay Colony in Ward No. 04, Ballabgarh. (Recall)/2026912D9EA7 83CE 49A2 BE3E 52196C9720A5284ULB/2026_HRY_512001_1 |
Haryana |
-- |
| 23019. |
30-Mar-2026 06:55 PM |
06-Apr-2026 06:55 PM |
07-Apr-2026 10:00 AM |
Estimate for supply and installation of 200 KVA generator (DG set) at Anaj Mandi disposal ,Ballabhgarh Recall/202691748E57 E18E 47FB 8E0B EAFC3256135E284ULB/2026_HRY_512002_1 |
Haryana |
-- |
| 23020. |
30-Mar-2026 06:55 PM |
06-Apr-2026 06:55 PM |
07-Apr-2026 10:00 AM |
Construction of a multipurpose hall along with toilet near agarsain park boosting ward no. 41, Ballabgarh.(Recall)/2026A1A7F8E4 7269 4745 9FBD 5DB96BFF12FE284ULB/2026_HRY_512004_1 |
Haryana |
-- |