| क्र.सं. |
ई-प्रकाशन तिथि |
बोली जमा करने की अंतिम तिथि |
निविदा खुलने की तिथि |
शीर्षक/संदर्भ संख्या/निविदा आईडी |
राज्य का नाम |
शुद्धिपत्र |
| 4821. |
13-Apr-2026 06:00 PM |
27-Apr-2026 05:00 PM |
28-Apr-2026 11:00 AM |
Maintenance of Road (Leveling of Interlocking tile in different Pocket and P/L Mastic Flooring of Main Entry in Sector-34) Noida/03/GM/SM(WC-05)/2026-27/2026_NOIDA_1136564_1 |
Uttar Pradesh |
-- |
| 4822. |
15-Apr-2026 03:05 PM |
27-Apr-2026 05:00 PM |
29-Apr-2026 12:30 PM |
Annual E tender for Liquid Medical Oxygen, Oxygen, Nitrous Oxide, Carbon dioxide gas cylinders refilling, Servicing and Repairing for 2026-28/E-tender/GMCH/1284/2026-27/2026_MERDM_1295099_1 |
Maharashtra |
-- |
| 4823. |
15-Apr-2026 06:30 PM |
27-Apr-2026 05:00 PM |
28-Apr-2026 04:00 PM |
Construction of RCC sewer pipes and chambers from Sajjans house to the Asana Johad drain in Ward No 35/NPPILANI/VIKAS/2026-27/191/2026_DLB_552036_2 |
Rajasthan |
-- |
| 4824. |
15-Apr-2026 06:30 PM |
27-Apr-2026 05:00 PM |
28-Apr-2026 04:00 PM |
Construction of Interlock road in street of north side, south side and behinde of mla sharwan kothi ward no 19/NPPILANI/VIKAS/2026-27/191/2026_DLB_552036_3 |
Rajasthan |
-- |
| 4825. |
13-Apr-2026 06:00 PM |
27-Apr-2026 05:00 PM |
28-Apr-2026 05:00 PM |
AJD/SE/TW/LRC/TN-463 Lot-I/AJD/SE/TW/LRC/TN-463 Lot-I/2026_AVVNL_551499_1 |
Rajasthan |
-- |
| 4826. |
13-Apr-2026 06:00 PM |
27-Apr-2026 05:00 PM |
28-Apr-2026 11:00 AM |
M/o Drain (Repair and Raising of Drain, Re-fixing of Paver Block in front of ARTO Office and P/L C.C. Pavement back side ISCON Temple Road in Sector-33A) Noida/02/GM/SM(WC-05)/2026-27/2026_NOIDA_1136588_1 |
Uttar Pradesh |
-- |
| 4827. |
13-Apr-2026 06:00 PM |
27-Apr-2026 05:00 PM |
28-Apr-2026 11:00 AM |
M/o Drain (Repair, Raising and Covering of Drain Infront of Apana Ghar Ashram, Satya Hospital towards Police Chauki and Billa Bong School in Sector-34) Noida./04/GM/SM(WC-05)/2026-27/2026_NOIDA_1136607_1 |
Uttar Pradesh |
-- |
| 4828. |
13-Apr-2026 06:55 PM |
27-Apr-2026 05:00 PM |
28-Apr-2026 11:00 AM |
M/O tree shurbs and lawan on 120mtr wide road central verge and both side patri ch. 0.00km to 4.00km and m/o tree in 7 percent abadi plots area in sec25(SDZ) for two years , yeida WC-H/YEA/GM(PROJECT)/2026/488 DT-01/04/2026/2026_YEIDA_1134071_25 |
Uttar Pradesh |
-- |
| 4829. |
07-Apr-2026 06:45 PM |
27-Apr-2026 05:00 PM |
29-Apr-2026 03:30 PM |
Strengthening of Road From Saraidih T04 to Dagra Picket (L-8.870 Km.) under Nawdiha Bazar Block/EE/RWD/DALTONGANJ/Z/03/25-26/2026_RWD_112548_1 |
Jharkhand |
-- |
| 4830. |
06-Apr-2026 02:30 PM |
27-Apr-2026 05:00 PM |
28-Apr-2026 11:00 AM |
Laying of 110mm HDPE pipeline from Sangam garments to Danish shop at Mohalla Halvaiyan, Ward no. 06. Length 55 Mt/15VITT/RAJVITT/SWM/E-T-2025-26/2026_DOLBU_1131266_15 |
Uttar Pradesh |
-- |