Search for High Value Tenders - Central

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
HNHAQL
Enter the characters shown in the image.
Total Tenders : 137
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
91. 16-Feb-2021 09:00 AM 27-Apr-2021 06:00 PM 29-Apr-2021 11:00 AM Construction of Passenger Terminal Building and Allied works for New Greenfield Airport at Hirasar Rajkot, Gujarat, India/AAI/CHQ/ENGG/WR/HIRASAR/TB/2021_AAI_68792_1 Airports Authority of India
92. 08-Feb-2021 05:40 PM 26-Apr-2021 11:00 AM 26-Apr-2021 11:30 AM CONSTRUCTION OF DOUBLE LINE BALLAST LESS TRACK BLT FOR ELEVATED VIADUCT PORTION BETWEEN NICCO PARK HAVING CH. 13841.585 M TO TITUMIR CH. 25891.527 M INCLUDING POINTS AND CROSSINGS, ETC. IN CONNECTION WITH CONSTRUCTION OF METRO RAILWAY CORRIDOR/RVNL/KOL/NGA-AIRPORT/METRO/BLT /NICCO PARK-TITUMIR/2021_RVNL_588534_1 Rail Vikas Nigam Ltd
93. 06-Feb-2021 02:00 PM 22-Apr-2021 03:30 PM 23-Apr-2021 03:30 PM Major Maintenance including strengthening of the Existing 4-6 Laning from Thrissur (km 270.000) to Edappally (km 342.000) section of NH544 in the state of Kerala at Risk and Cost of the Concessionaire during O and M period./NHAI/RO-Kerala/Risk and Cost/2021/01/2021_NHAI_69376_1 National Highways Authority of India
94. 04-Feb-2021 08:38 PM 05-Jun-2021 11:00 AM 05-Jun-2021 11:00 AM Provision of 3rd and 4th line between Barabanki (Excluding)-Malhaur (Excluding) Stations (2X13.50 Km) including Electrification & Signalling works on Lucknow Division of Northern Railway./01-W-DyCE-C-IV-LKO/56926409 Ministry of Railways --
95. 30-Jan-2021 06:00 PM 23-Apr-2021 05:00 PM 26-Apr-2021 11:00 AM Mine Development and Operation(MDO) of Piparwar Phase-I underground mine for extraction of coal and delivery thereof in accordance with the Mining Plan through a mine operator for 14 Years/CCL/GM(CMC)/PPR(UG) MDO/2021/05/2021_CCL_195047_1 Central Coalfields Limited
96. 29-Jan-2021 06:10 PM 12-May-2021 11:00 AM 13-May-2021 11:30 AM Construction of Eight lane access controlled Expressway from Km 43.000 to Km 69.800 (Amne to Bhoj Section-SPUR of Vadodara Mumbai Expressway) on Hybrid Annuity mode under Bharatmala Pariyojana (Phase II-Package XVI)/NHAI/VME/PPPAC/2016/Pkg XVI/2021_NHAI_68624_1 National Highways Authority of India
97. 29-Jan-2021 06:00 PM 12-May-2021 11:00 AM 13-May-2021 11:30 AM Construction of Eight lane access controlled Expressway from Km 20.200-Km 43.000 (Akloli to Amne Section-SPUR of Vadodara Mumbai Expressway) in the State of Maharashtra on Hybrid Annuity mode under Bharatmala Pariyojana (Phase II-Package XV)/NHAI/VME/PPPAC/2016/Pkg XV/2021_NHAI_68621_1 National Highways Authority of India
98. 29-Jan-2021 05:50 PM 12-May-2021 11:00 AM 13-May-2021 11:30 AM Construction of Eight lane access controlled Expressway from Km 3.000-Km 20.200 (Shirsad to Akloli Section-SPUR of Vadodara Mumbai Expressway) in the State of Maharashtra on Hybrid Annuity mode under Bharatmala Pariyojana (Phase II-Package XIV)/NHAI/VME/PPPAC/2016/Pkg XIV/2021_NHAI_68605_1 National Highways Authority of India
99. 25-Jan-2021 05:20 PM 27-Apr-2021 11:00 AM 28-Apr-2021 11:30 AM Construction of Four Lane Divided Carriageway with Paved Shoulder from Patan (Near Khan Sarover lake) to Gojariya km 49.775 (design) to km 128.950 (design) length 79.175 km of NH-68 in the State of Gujarat under NHDP V on EPC Mode/NHAI/Guj/ Patan-Gojaria/2021/2021_NHAI_68196_1 National Highways Authority of India
100. 20-Jan-2021 06:00 PM 04-May-2021 11:00 AM 05-May-2021 11:30 AM Development of 6-lane access controlled LudhianaBathinda Greenfield highway sec of NH754AD from Jn. with MogaBarnala Rd NH703 to Jn. with DelhiKatra Exp way NE5 Ludhiana vill Ballowal as a part of LudhianaAjmer EC in Punjab on HAM under BMP Ph-1 Pkg2/BMP/Ph-I/LA/EC/ LudhianBathinda Greenfield/Pkg2/21/2021_NHAI_67717_1 National Highways Authority of India