Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
b622a5
Enter the characters shown in the image.
Total Tenders : 402
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
241. 15-May-2026 07:22 PM 17-Jul-2026 03:00 PM 17-Jul-2026 03:00 PM SCR Construction Organization: Engineering, Procurement and Construction (EPC) contract for New Bypass line between Yerpedu and Pudi Stations with Signalling & Telecommunication, Electrification works including augmentation of existing 1X25kv TSS/SP/SSP to suit proposed line in Guntakal division in the State of Andhra Pradesh./EPC-11-CAO-C-SC-2026/88748753 Ministry of Railways --
242. 15-May-2026 06:20 PM 06-Jul-2026 03:00 PM 06-Jul-2026 03:30 PM Last-mile dark fibre hiring for existing hired links in the states of Bihar, Uttar Pradesh and Madhya Pradesh under the Patna Territory of RailTel Corporation of India Ltd, Eastern Region (Zone-2)/GEM/2026/B/7545050 Dt. 15.05.2026/2026_RTCIL_838279_1 Rail Tel Corporation of India Ltd icon image
243. 15-May-2026 06:20 PM 06-Jul-2026 03:00 PM 06-Jul-2026 03:30 PM Last-mile dark fibre hiring for existing hired links in the states of Bihar, Uttar Pradesh and Madhya Pradesh under the Patna Territory of RailTel Corporation of India Ltd, Eastern Region (Zone-1)/GEM/2026/B/7543471 Dt. 15.05.2026/2026_RTCIL_838277_1 Rail Tel Corporation of India Ltd icon image
244. 15-May-2026 06:15 PM 18-Jun-2026 02:30 PM 18-Jun-2026 02:30 PM Construction of Two wheeler ROB/FOB between Varanasi - Prayagraj Rambag Section for 130 KMPH under Sr. DEN/III/Varanasi (Total = 19 Nos)/NER-BSB-2026-63/89320728 Ministry of Railways --
245. 15-May-2026 06:13 PM 03-Jul-2026 03:00 PM 03-Jul-2026 03:00 PM Plan, Construct, Develop & Operate Gati Shakti Multi-Modal Cargo Terminal (GCT) for handling Cargo by extension of common loop line no. 1 towards Dadri end of New Nilje station on DFCCIL/Railway Land Under Schedule- 2 of GCT Policy of Indian Railways/HQ-OPBD0BDGFTD_12_2025/89356901 Ministry of Railways --
246. 14-May-2026 05:25 PM 19-Jun-2026 12:00 PM 19-Jun-2026 12:00 PM i. Construction of Road Over Bridge (ROB) at Rly Km 531/1- 3 of (1 X 60.0m) Camel Back Type Truss Girder and 10 X 20.04m RCC T-Beam girder on NH-16 Side and 8 x 25.0m on Barkul Pantha Niwas Side for Approach Portion, In Lieu of LC No- 261 At KM 531/3-5, in between Stations Balugaon (BALU) & Chilka (CLKA) on Howrah- Visakhapatnam Main Line Under Khurda Road Division. ii. Construction of Road Over Bridge (ROB) with 1 x 60.00 m Camel Back Type Truss Girder for Railway portion at Km 538/15-17/CAOCRSPBBS-24-2026/89323082 Ministry of Railways --
247. 14-May-2026 05:25 PM 19-Jun-2026 12:00 PM 19-Jun-2026 12:00 PM i. Construction of Road Over Bridge (ROB) (1 X 60.0m) Camel Back Type Truss Girder + (1 X 36.0m) Composite Girder for Rly. Portion in Lieu of LC No-224 and Proposed Span of 6 X 25.04m RCC Girder on Routapada & 10 X 25.04m RCC Girder on Tentuliapada Side for Approach Portion, At Rly Km 488/3-5 in between Stations Nirakarpur & Bhusanpur on Howrah- Visakhapatnam Main Line Under Khurda Road Division. ii. Construction of Road Over Bridge (ROB) (1 x 60.0 m Camel Back Type Truss Girder) f/CAOCRSPBBS-23-2026/89301334 Ministry of Railways --
248. 14-May-2026 05:22 PM 19-Jun-2026 02:30 PM 19-Jun-2026 02:30 PM RFP for Construction of 8 Nos. of Major Bridges and rebuilding of 3 Nos. of ROB, including associated S and T works in connection with Aluabari Road (AUB)-New Jalpaiguri (NJP) 3rd and 4th Line (57Km) of Northeast Frontier Railway ./CE-CON-EPC-ANJ-2026-01/88936269 Ministry of Railways --
249. 14-May-2026 05:00 PM 29-Jun-2026 05:30 PM 01-Jul-2026 11:00 AM Rehabilitaion and Up gradation of Existing from Adhalgaon to Jamkhed Km 132.600 to km 195.375 to two lanes with Paved Shoulders configuration Section of NH 548 D Package No. Nashik IV i.e. Nhavra Inamgaon Kashti Shrigonda Adhalgaon Jalgaon Jamkhed/NIT5/2026_MoRTH_908704_1 Ministry of Road Transport and Highways --
250. 14-May-2026 03:27 PM 14-Jul-2026 12:00 PM 14-Jul-2026 12:00 PM Gunupur-Theruvali New BG line project : Design and Construction of New BG Railway line from Km 122.750 to Km 141.940 (Excluding RCC BOX, ROB Br. No 388 from km 137.725 to 137.925 but including P Way & OHE works) involving 08 Nos of Tunnels (T-2 to T-9) & from Km 110.02 to Km 113.12 involving 1 No Tunnel(T-1), BLT Works & its approaches and Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Over Bridge (ROBs),/EPC-CONIIVSKP2026019/89176367 Ministry of Railways --

Note : For more details and clarifications, please refer to the respective Portal.