Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
M67QQH
Enter the characters shown in the image.
Total Tenders : 478
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
271. 26-Sep-2025 08:24 PM 24-Oct-2025 11:30 AM 24-Oct-2025 11:30 AM Construction of (Bridge portion & Approaches) of four lane Road over bridge (ROB) in lieu of level crossing No. 164A/2-E at Km 353.990 between Doraha and Sahnewal station on Ambala - Ludhiana section of Ambala Division & Construction of two lane Road over bridge (ROB) in lieu of level crossing No. B-4/E-2 at Km 3/2-3 between Amritsar-Khemkaran section near Bhagtanwala Railway station of Firozpur Division of Northern Railway under the Road Safety Project Unit (RSPU)/NR New Delhi./17-W-09-2025-WA-DyCEC-RSP/82785321 Ministry of Railways --
272. 26-Sep-2025 07:09 PM 22-Jan-2026 02:30 PM 22-Jan-2026 02:30 PM Engineering Procurement and Construction (EPC) Tender for Construction of Formation (Earthwork & Blanketing), Bridges (Major & Minor), Retaining wall, Other Civil work ie. Gate Lodges, Goods Wharf, Service buildings, Passenger Platforms, Platform Shed, Circulating area, Road Work, Foot Over Bridge, Utility shifting etc. from Chainage 39.400 Km to Chainage-103.850 Km in connection with Doubling of Railway Track between Darbhanga and Sitamarhi Stations in Samastipur Division of East Cent/ECR-CAO-C-N-EPC-26-25-26/84519418 Ministry of Railways --
273. 26-Sep-2025 06:55 PM 31-Oct-2025 04:00 PM 31-Oct-2025 04:30 PM Selection of service provider for end to end reconciliation for Digital/Non Digital transactions/GEM/2025/B/6730369 Dated 26.09.2025/2025_UCO_814067_1 UCO Bank icon image
274. 26-Sep-2025 06:30 PM 13-Nov-2025 11:00 AM 14-Nov-2025 11:30 AM Construction of 4lane South-East Bypass for Azamgarh City connecting NH-28 at existing Ch. Km 218.800 to Purvanchal Expressway at existing Ch. Km 247.850 (total length 14.905 Km) in UP on EPC Mode/UPDIV-21/10/ 2025-UP Division/E-294525/2025_NHAI_250647_1 National Highways Authority of India --
275. 26-Sep-2025 06:02 PM 24-Dec-2025 02:30 PM 24-Dec-2025 02:30 PM Construction of doubling work including earth work, blanketing, minor bridges, major/ important bridges, stations & other buildings, platform related work, LC work and other miscellaneous works etc. for 25T Indian Railway Standard Loading from Muzaffarpur (excl.) to Sitamarhi (excl.) (i.e. Km. 4.837 to 63.577) (excluding:- track works and work of important bridge no. 12 between Km. 9.300 to 9.900 and important bridge no. 47 between Km 32.600 to 33.400) (total- 57.340 Km) in connection with/ECR-CAO-C-N-EPC-27-25-26/84589390 Ministry of Railways --
276. 26-Sep-2025 05:45 PM 28-Oct-2025 03:00 PM 28-Oct-2025 03:00 PM Construction of proposed ROB near Haur /Station in lieu of LC No. 49 (1x 36 m Composite Girder, 1x60 m Bow String Steel Girder and 1X36 M Composite Girder) and approaches with viaduct etc.. at Km 79/17-19 between Khirai and Haur stations on Howrah-Kharagpur section of South Eastern Railway at 5th Km. on Ratulia - Gobardhanpur Road (ODR) in the District of Purba Mednipur./DCE-RSP-9-2025/84548442 Ministry of Railways --
277. 26-Sep-2025 05:40 PM 10-Nov-2025 05:30 PM 12-Nov-2025 11:00 AM Upgradation to four lane with paved shoulder configuration of the Nashik to Peth section of NH848 from km 11.600 to 53.600 excluding 4 lane sections Length 36.371 km in the state of Maharashtra on EPC mode./NIT10/2025_MoRTH_879360_1 Ministry of Road Transport and Highways --
278. 26-Sep-2025 05:40 PM 30-Oct-2025 04:00 PM 30-Oct-2025 04:30 PM Procurement of National Automated Clearing House NACH Solution/GEM/2025/B/6733231 dated 26.09.2025/2025_UCO_814054_1 UCO Bank icon image
279. 26-Sep-2025 05:33 PM 28-Oct-2025 02:30 PM 28-Oct-2025 02:30 PM BRAKE DISC FOR WHEEL SET/05251405B/106841877 Ministry of Railways --
280. 26-Sep-2025 05:21 PM 28-Oct-2025 03:30 PM 28-Oct-2025 03:30 PM (i.)Construction of Road Over Bridge (ROB) of span 1x36.0m Composite Girder + 3x24.0m Composite Girder + 2x10.37m Solid Slab + 1x14.0m T-Beam Girder in lieu of LC no.-363 at 667/23-25 Km in between Mandasa - Summadevi Stations on the Howrah-Visakhapatnam main line in Khurda road division. (ii.) Technical Services for undertaking Feasibility Study, Detailed Project Report and Design Development for elimination of 13 no s Level Crossings through construction of ROB/RUB, FOB, drainage improv/CAOCRSPBBS-28-2025/84573910 Ministry of Railways --

Note : For more details and clarifications, please refer to the respective Portal.