Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
65M46H
Enter the characters shown in the image.
Total Tenders : 402
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
381. 03-Oct-2025 05:00 PM 29-Jun-2026 03:00 PM 30-Jun-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways icon image
382. 01-Oct-2025 06:00 PM 24-Jun-2026 11:00 AM 25-Jun-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)/NHAI/Tech/ TS/2024/239275/2025_NHAI_251031_1 National Highways Authority of India icon image
383. 01-Oct-2025 06:00 PM 24-Jun-2026 11:00 AM 25-Jun-2026 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India icon image
384. 01-Oct-2025 05:30 PM 24-Jun-2026 11:00 AM 25-Jun-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)/NHAI/Tech /TS/2024/239275/2025_NHAI_251026_1 National Highways Authority of India icon image
385. 12-Sep-2025 06:30 PM 15-Jul-2026 11:00 AM 16-Jul-2026 11:30 AM Upgradation to Four lane with paved shoulder of Kalavad-Jamnagar section (Package-II) of NH-927D from Design km 0.000 (Ex. km 50.925) to Design km 47.572 (Ex. km 3.720) in the State of Gujarat on Hybrid Annuity Mode./RW/NH-12014/164/2024/GJ/Zone-V/2025_MoRTH_877275_1 Ministry of Road Transport and Highways icon image
386. 12-Sep-2025 06:30 PM 30-Jun-2026 11:00 AM 01-Jul-2026 11:30 AM Upgradation to 2 Lane with Paved Shoulders from Design km 0.000 to km 48.742 and km 61.732 to km 102.284 of Bagasara-Una Section of NH-351K in the State of Gujarat on Hybrid Annuity Mode/RW/NH-12014/136/2024/GJ/Zone-V/2025_MoRTH_877249_1 Ministry of Road Transport and Highways icon image
387. 22-Aug-2025 06:55 PM 22-Jun-2026 03:00 PM 23-Jun-2026 03:00 PM Agency lining-up for Outright Sale of Spent Catalyst containing precious metal platinum./Agency lining-up for Outright Sale of Spent Catalyst containing precious metal platinum./2025_MR_186402_1 IndianOil icon image
388. 19-Aug-2025 05:30 PM 22-Jun-2026 05:30 PM 24-Jun-2026 12:30 PM Upgradation and Reconstruction of Sirmaur - Dabhaura Section of NH-135B from Km 36/700 to Km 73/813 to two lane with paved shoulder Configuration in the State of Madhya Pradesh on EPC mode/09/SAC/Tender/Rewa/2025-26/2025_MoRTH_873770_1 Ministry of Road Transport and Highways icon image
389. 18-Aug-2025 03:00 PM 25-Jun-2026 11:00 AM 26-Jun-2026 11:30 AM Construction of 6-lane Elevated Corridor from Maduravoyal Junction (Chainage Km 13.965) Chennai Outer Ring Road (Chainage Km 22.100) including Junction Improvements at km. 22.368 of NH-48 (Old NH4) in Tamil Nadu on Hybrid Annuity Mode (Project Lengt/TNDIV-21013/64 /2024-PIU Chennai-I/2025_NHAI_245545_1 National Highways Authority of India icon image
390. 07-Aug-2025 04:30 PM 03-Aug-2026 11:00 AM 04-Aug-2026 11:30 AM Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode under NH(O)/NHAI/PIU/Panvel/ Pagote-Chowk/PATSC and SFC/2025_NHAI_244402_1 National Highways Authority of India icon image

Note : For more details and clarifications, please refer to the respective Portal.