Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
32ZMPA
Enter the characters shown in the image.
Total Tenders : 456
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
391. 10-Jan-2026 09:00 AM 21-May-2026 11:00 AM 22-May-2026 11:30 AM Const of Gr Separated Structure at 24.907 Abhava Jn 25.720 Mindhola Jn 27.121 Khajod Jn include RE Walls Service Rd and Drains along with missing Service Rd and conversion of Earthen Shoulder to PS on Hazira Port Surat GJ/MH Border of NH53 in GJ on E/NHAI/Gujarat/PIU Surat/Abhava khajod/2026/e 289198/2026_NHAI_262523_1 National Highways Authority of India icon image
392. 09-Jan-2026 04:55 PM 01-Jun-2026 03:30 PM 15-Jun-2026 03:30 PM Engineering, Procurement and Construction of Isotope Production Reactor (IPR) on EPC Mode-1 Basis/BARC(V)/CES/IPR/EPC/208, Dated 06/01/2026/2026_BARC_893016_1 Bhabha Atomic Research Centre icon image
393. 09-Jan-2026 03:30 PM 19-May-2026 02:00 PM 20-May-2026 02:00 PM EPC execution for Power House EM Works of 240 MW Heo HEP/NIB No.487 dtd 09.01.2026/2026_NEEPC_262394_1 North Eastern Electric Power Corporation Limited icon image
394. 09-Jan-2026 09:00 AM 21-May-2026 11:00 AM 22-May-2026 11:30 AM Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in Uttar Pradesh on HAM mode Pkg II/UPDIV/3 /2026-UP Division/ E-304208/2026_NHAI_262336_1 National Highways Authority of India icon image
395. 09-Jan-2026 09:00 AM 21-May-2026 11:00 AM 22-May-2026 11:30 AM Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh on HAM mode PKG I/UPDIV/4/ 2026-UP Division/ E-304213/2026_NHAI_262335_1 National Highways Authority of India icon image
396. 07-Jan-2026 05:30 PM 19-May-2026 11:00 AM 20-May-2026 11:30 AM 4-Laning of Muzaffarpur- Sitamarhi- Sonbarsa section of NH-22 (Design Ch. Km. 0.000 to Design Ch. Km. 82.551 Total Length 82.551 Km) in the state of Bihar on Hybrid Annuity Mode (HAM)/PROJ-29015(103)/1/ 2026-Bihar Division/E-303765/2026_NHAI_262088_1 National Highways Authority of India icon image
397. 02-Jan-2026 05:00 PM 28-May-2026 11:00 AM 29-May-2026 11:00 AM Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode./NHAI/Patau Pachpadara/2026/2026_NHAI_261436_1 National Highways Authority of India icon image
398. 02-Jan-2026 01:30 PM 20-May-2026 03:00 PM 21-May-2026 03:00 PM NHIDCL/Meghalaya/HSC/Package01/NHIDCL/Meghalaya/HSC/Package01/2026_NHIDC_892270_1 National Highways and Infrastructure Development Corporation icon image
399. 01-Jan-2026 06:55 PM 22-May-2026 11:00 AM 23-May-2026 11:00 AM Permanent Rectification of 10 Nos. of Blackspots, 2 Nos of Accident Spots by providing 6 Nos of VUPs, 2 Nos of LVUPs, 2 Nos of Service Road, 2 Nos of Foot Over Bridges with Lift in Madurai to Kayathar section of NH-44 (Old NH-7) in the State of TN/NHAI/17011/01/140/2026/RO Madurai/2026_NHAI_261313_1 National Highways Authority of India icon image
400. 30-Dec-2025 06:30 PM 25-May-2026 03:00 PM 26-May-2026 03:00 PM Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH -167K (Design Chainage km 87.360 to km 88.437) in the States of Telangana and Andhra Pradesh on Engineering, Procurement and Construction (EPC) Basis/RW/HYD/Misc-28/NIT/2025-26/019 dt 30.12.2025/2025_MoRTH_891865_1 Ministry of Road Transport and Highways icon image

Note : For more details and clarifications, please refer to the respective Portal.