Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
KbKYTG
Enter the characters shown in the image.
Total Tenders : 448
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
391. 07-Aug-2025 06:00 PM 31-Dec-2025 11:00 AM 01-Jan-2026 11:30 AM Development of 8Lane Elevated Flyover at Tier1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (12.190 to km 42.113) section of NH60 in Maharashtra on BOT (Toll) Mode./NHAI/Tech/MH/N-P-K /2024/Combined-Bid/2025_NHAI_244447_1 National Highways Authority of India icon image
392. 07-Aug-2025 06:00 PM 31-Dec-2025 11:00 AM 01-Jan-2026 11:30 AM Development of 8-Lane Elevated Flyover at Tier-1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg2 28.925 to km 42.113) section of NH60 in Maharashtra on (BOT) Mode./NHAI/Tech/ MH/N-P-K/2024/Pkg-2/2025_NHAI_244441_1 National Highways Authority of India icon image
393. 07-Aug-2025 05:40 PM 31-Dec-2025 11:00 AM 01-Jan-2026 11:30 AM Development of 8Lane Elevated Flyover at Tier1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg-1 12.190 to km 28.925) sec of NH60 in Maharashtra on BOT (Toll) Mode./NHAI/Tech/ MH/N-P-K/2024/Pkg-1/2025_NHAI_244433_1 National Highways Authority of India icon image
394. 07-Aug-2025 04:30 PM 31-Dec-2025 11:00 AM 01-Jan-2026 11:30 AM Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode under NH(O)/NHAI/PIU/Panvel/ Pagote-Chowk/PATSC and SFC/2025_NHAI_244402_1 National Highways Authority of India icon image
395. 01-Aug-2025 05:45 PM 09-Dec-2025 11:00 AM 10-Dec-2025 11:30 AM RFP for Improvement and widening to two Laning with Paved Shoulder of National Highway 127B from Km. 0.000 to Km 31.500 in the State of Meghalaya on EPC basis under NE Road Network Connectivity Improvement through JICA ODA Loan Phase-VII/NH-12014//JICA/Pkg-I/2025_WBRTH_871632_1 Ministry Of Road Transport and Highways - World Bank Tenders icon image
396. 24-Jul-2025 01:00 PM 23-Dec-2025 11:00 AM 24-Dec-2025 11:30 AM Widening of exis 2L to 4L divided carriageway with PS from Km243.800 to Km270.500 of NH 39(Rewa to Churhat Tunnel North portal excluding Churhat Tunnel)and from Km286.200 to Km 313.700 of NH39(Churhat to Sidhi sec)L-54.20 Km under NH(O) in MP on HAM/MPDIV/16 /2024-NHAI- RO Bhopal (266127)/2025_NHAI_242402_1 National Highways Authority of India icon image
397. 24-Jul-2025 12:00 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:30 AM Construction of 4 lane Greenfield Section of NH-33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode/PROJ/34/2025 Bihar Division/2025_NHAI_242359_1 National Highways Authority of India icon image
398. 24-Jul-2025 09:00 AM 09-Dec-2025 11:00 AM 10-Dec-2025 11:30 AM Construction of 4 laning of Sahebganj Areraj Bettiah of NH 139W (Total length 78.942 km) in the State of Bihar on Hybrid Annuity Mode comprising (i) Section 1 Sahebganj to Areraj (38.362 km) and (ii) Section 2 Areraj to Bettiah (40.580 km)/BRDIV-20021/11/2025 Bihar Division/2025_NHAI_242354_1 National Highways Authority of India icon image
399. 22-Jul-2025 05:30 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:30 AM Up-gradation of existing 2 lane to 4 lane with paved shoulder from Deshgaon to Julwaniya section of NH-347B from design km 0.000 Existing km 99.924 on NH-347BG to design km 108.643 (Ex km 129.900 on NH-52) under NH(O) in Madhya Pradesh on HAM/MPDIV-21017/ 38/2025-MP Division/2025_NHAI_242181_1 National Highways Authority of India icon image
400. 22-Jul-2025 05:05 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:30 AM Construction of 2 lane with paved shoulder from Hiwarkhedi-Roshni NH-347B from km 0.000-km 90.010 and 2-4 Lane from km 114.000 near Ashapur Village to km 149.000 near Rudhy village of Betul-Khandwa corridor 125.010 km in MP on HAM under NHO/MPDIV-21017/37/ 2025-MP Division/2025_NHAI_242172_1 National Highways Authority of India icon image

Note : For more details and clarifications, please refer to the respective Portal.