Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
391. 04-Oct-2025 06:58 PM 12-Jan-2026 12:00 PM 12-Jan-2026 12:00 PM RFP for Construction of Viaducts, ROR/RFO, Major Bridges, Minor Bridges, Animal Underpass, Animal Overpass, ROB, RUB/LHS, Earthwork, Blanketing, Buildings etc and other associated works for construction of new Double Line track for DFCC loading from Ch.157.920 to Ch.184 (except tunnels) in Koderma Detour section in Sonnagar-Andal 3rd and 4th line project on EPC Mode in Dhanbad Division of East Central Railway./ECR-CAO-C-S-EPC-02-25-26/84713967 Ministry of Railways --
392. 03-Oct-2025 05:00 PM 08-Jan-2026 03:00 PM 09-Jan-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways icon image
393. 01-Oct-2025 06:00 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India icon image
394. 01-Oct-2025 06:00 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)/NHAI/Tech/ TS/2024/239275/2025_NHAI_251031_1 National Highways Authority of India icon image
395. 01-Oct-2025 05:30 PM 16-Dec-2025 11:00 AM 17-Dec-2025 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)/NHAI/Tech /TS/2024/239275/2025_NHAI_251026_1 National Highways Authority of India icon image
396. 29-Sep-2025 05:00 PM 26-Dec-2025 05:00 PM 29-Dec-2025 11:00 AM Rehabilitation and upgradation of Trimbak - Mokhada - Jawhar - Manor - Palghar section of NH-160A to 2-lane/4-lane with paved shoulder (107.035 km) in the State of Maharashtra on EPC Mode./12014/148/2024-MAH/ZONE-IV-II/2025_MoRTH_879578_1 Ministry of Road Transport and Highways icon image
397. 29-Sep-2025 05:00 PM 26-Dec-2025 05:00 PM 29-Dec-2025 11:00 AM Rehabilitation and upgradation of Ghoti to Trimbak section of NH-160A (km 53.500 to km 101.100) to 4-LPS (47.600 km) in the State of Maharashtra on EPC Mode/12014/148/2024-MAH/ZONE-IV-I/2025_MoRTH_879574_1 Ministry of Road Transport and Highways icon image
398. 26-Sep-2025 07:09 PM 22-Jan-2026 02:30 PM 22-Jan-2026 02:30 PM Engineering Procurement and Construction (EPC) Tender for Construction of Formation (Earthwork & Blanketing), Bridges (Major & Minor), Retaining wall, Other Civil work ie. Gate Lodges, Goods Wharf, Service buildings, Passenger Platforms, Platform Shed, Circulating area, Road Work, Foot Over Bridge, Utility shifting etc. from Chainage 39.400 Km to Chainage-103.850 Km in connection with Doubling of Railway Track between Darbhanga and Sitamarhi Stations in Samastipur Division of East Cent/ECR-CAO-C-N-EPC-26-25-26/84519418 Ministry of Railways --
399. 26-Sep-2025 06:30 PM 15-Dec-2025 11:00 AM 16-Dec-2025 11:30 AM Construction of 4lane South-East Bypass for Azamgarh City connecting NH-28 at existing Ch. Km 218.800 to Purvanchal Expressway at existing Ch. Km 247.850 (total length 14.905 Km) in UP on EPC Mode/UPDIV-21/10/ 2025-UP Division/E-294525/2025_NHAI_250647_1 National Highways Authority of India icon image
400. 26-Sep-2025 06:02 PM 24-Dec-2025 02:30 PM 24-Dec-2025 02:30 PM Construction of doubling work including earth work, blanketing, minor bridges, major/ important bridges, stations & other buildings, platform related work, LC work and other miscellaneous works etc. for 25T Indian Railway Standard Loading from Muzaffarpur (excl.) to Sitamarhi (excl.) (i.e. Km. 4.837 to 63.577) (excluding:- track works and work of important bridge no. 12 between Km. 9.300 to 9.900 and important bridge no. 47 between Km 32.600 to 33.400) (total- 57.340 Km) in connection with/ECR-CAO-C-N-EPC-27-25-26/84589390 Ministry of Railways --