Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
a5SE2Y
Enter the characters shown in the image.
Total Tenders : 479
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
391. 08-Sep-2025 06:10 PM 01-Dec-2025 11:00 AM 02-Dec-2025 11:30 AM Cons. of Slip/Service road at various locations (25.140 Km (LHS-RHS) Flyover (2x25m) at Borivali Jun. (Km. 528.550) and LVUP (1x15m) at Sherekarpada (528.800)on PimpriSado-Vadape sec. of NH-848 from 460.900 to Km. 537.000 in Maharashtra on EPC NH(O)/MHDIV-20017/16/ 2025-PIU Nashik/E-290114/2025_NHAI_247937_1 National Highways Authority of India icon image
392. 06-Sep-2025 09:00 AM 09-Dec-2025 02:00 PM 12-Dec-2025 03:00 PM SJVN/CC-Delhi/REIA/2025/WIND-4/SJVN/CC-Delhi/REIA/2025/WIND-4/2025_SJVNL_811489_1 SJVN Ltd icon image
393. 04-Sep-2025 06:55 PM 22-Dec-2025 06:00 PM 29-Dec-2025 12:00 PM ENGINEERING PROCUREMENT AND CONSTRUCTION EPC OF PROVN OF TECHNICAL BLDG AW SERVICES AT SHESHARTHANG LEH/180140/E8/2025_MES_729479_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES icon image
394. 04-Sep-2025 09:00 AM 25-Nov-2025 11:00 AM 25-Nov-2025 02:00 PM Charter Hire of 01 number of 3000 HP Drilling Rig Package in Assam and Arunachal Pradesh/CDG0167P26/T1607604 Oil India Limited icon image
395. 03-Sep-2025 06:00 PM 18-Dec-2025 11:00 AM 19-Dec-2025 11:30 AM Construction of 4 Lanning of Badnawar Petlawad Thandla Timarwani section of (NH752D) (Package 1) from Badnawar Bypass Ch. 70.400 to Village Temaria Ch. 114.400 in Madhya Pradesh on Hybrid Annuity Mode under NH(O)/MPDIV 21018/42/2025 MP Division/2025_NHAI_247468_1 National Highways Authority of India icon image
396. 03-Sep-2025 12:00 PM 31-Dec-2025 11:00 AM 01-Jan-2026 11:30 AM Construction of 4 lane (expandable to 8 lane) access controlled Highway section of NH248S for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH 48) (Design length32.180Km) under NH (O) in Maharashtra on EPC Mode/MHDIV-20019/51/2024- NHAI-RO-Mumbai/E-262235/2025_NHAI_247377_1 National Highways Authority of India icon image
397. 01-Sep-2025 05:00 PM 15-Dec-2025 03:00 PM 16-Dec-2025 03:30 PM Widening to 4 Lane PS from Km 347.500 Intersection with NH 48 at Km 116.800 Near Sira to Km 367.700 Near Badavanahalli including bypass to Sira town of NH 69 in the state of Karnataka on EPC mode under Annual Plan 2024 25/RW/BNG /NH-69/Km.347 500-367 700/03/2024/2025_MoRTH_875524_1 Ministry of Road Transport and Highways icon image
398. 30-Aug-2025 03:00 PM 15-Dec-2025 11:00 AM 16-Dec-2025 11:30 AM Upgradation of Existing Two-Lane Carriageway to Two Lane Carriageway with Paved Shoulder from Ch. 665.686 (Existing Km. 665.686) in Khanpur Village to Ch. 710.462 ( Km. 710.483 in Karvad Village (Length 44.776) Sec. of NH-56 in Gujarat on EPC Mode./NHAI/2025/Guj/NH-56/ Vansda-Vapi/e-292380/2025_NHAI_246985_1 National Highways Authority of India icon image
399. 28-Aug-2025 06:00 PM 02-Dec-2025 11:00 AM 03-Dec-2025 11:30 AM Construction of Long Term Remedial measures of identified Landslide location i.e. Thalout Ch. 229.600 To Ch. 230.100 between PANDOH TO KULLU Section of NH 03 (Old NH 21) in the State of Himachal Pradesh under NH(O) on EPC mode/NHAI/Pandoh Manali/ Slope Protection work/EPC/HP/ Thalout/2025/2025_NHAI_246815_1 National Highways Authority of India icon image
400. 27-Aug-2025 05:41 PM 24-Dec-2025 12:00 PM 24-Dec-2025 12:00 PM Construction of Flyover at Haridaspur to connect Haridaspur-Paradeep line including Electrification works and Shifting of Utilities, signalling cables and equipments but excluding signalling & Telecommunication Works on EPC mode/EPC-CECONIIIBBS2025035/83960682 Ministry of Railways --

Note : For more details and clarifications, please refer to the respective Portal.