Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
7PM552
Enter the characters shown in the image.
Total Tenders : 477
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
441. 30-Oct-2025 06:55 PM 19-Mar-2026 11:00 AM 20-Mar-2026 11:00 AM Construction of Elevated Corridor at Kherwara Town on Udaipur Ratanpur Shamlaji Section of NH-48 in Udaipur District in the State of Rajasthan on EPC mode./NHAI/ Kherwara Elevated/ 2025/2025_NHAI_253928_1 National Highways Authority of India icon image
442. 27-Oct-2025 05:00 PM 17-Mar-2026 05:00 PM 18-Mar-2026 03:00 PM MD/Green Tug Transition/2025/MD/Green Tug Transition/2025/2025_COPT_816973_1 Cochin Port Trust icon image
443. 16-Oct-2025 04:30 PM 17-Mar-2026 04:30 PM 18-Mar-2026 04:30 PM Supply, Installation, Testing and Commissioning of Dual View Hand Baggage and Registered Baggage XBIS at various Airports with one-year onsite warranty and Seven years Comprehensive Annual Maintenance Contract with spares/(AS)-03/2025-26/2025_AAI_251393_1 Airports Authority of India icon image
444. 06-Oct-2025 01:00 PM 07-Apr-2026 03:00 PM 09-Apr-2026 11:00 AM Widening and strengthening to 2-Lane with Paved Shoulder of NH-322 Musrigharari to Darbhanga (Km 72.05 to Km 96.00) in the state of Bihar on EPC Mode for the year 2025-26 Job No. NH-322/BHR/2025-26/132 (Including Utility Shifting)./03/NH/Samastipur/EPC/2025-26/2025_MoRTH_880199_1 Ministry of Road Transport and Highways icon image
445. 03-Oct-2025 05:00 PM 09-Apr-2026 03:00 PM 10-Apr-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways icon image
446. 01-Oct-2025 06:00 PM 18-Mar-2026 11:00 AM 19-Mar-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)/NHAI/Tech/ TS/2024/239275/2025_NHAI_251031_1 National Highways Authority of India icon image
447. 01-Oct-2025 06:00 PM 18-Mar-2026 11:00 AM 19-Mar-2026 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India icon image
448. 01-Oct-2025 05:30 PM 18-Mar-2026 11:00 AM 19-Mar-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)/NHAI/Tech /TS/2024/239275/2025_NHAI_251026_1 National Highways Authority of India icon image
449. 29-Sep-2025 05:00 PM 23-Mar-2026 05:00 PM 24-Mar-2026 11:00 AM Rehabilitation and upgradation of Ghoti to Trimbak section of NH-160A (km 53.500 to km 101.100) to 4-LPS (47.600 km) in the State of Maharashtra on EPC Mode/12014/148/2024-MAH/ZONE-IV-I/2025_MoRTH_879574_1 Ministry of Road Transport and Highways icon image
450. 29-Sep-2025 05:00 PM 23-Mar-2026 05:00 PM 24-Mar-2026 11:00 AM Rehabilitation and upgradation of Trimbak - Mokhada - Jawhar - Manor - Palghar section of NH-160A to 2-lane/4-lane with paved shoulder (107.035 km) in the State of Maharashtra on EPC Mode./12014/148/2024-MAH/ZONE-IV-II/2025_MoRTH_879578_1 Ministry of Road Transport and Highways icon image

Note : For more details and clarifications, please refer to the respective Portal.