Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
EXQSRE
Enter the characters shown in the image.
Total Tenders : 480
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
451. 01-Oct-2025 06:00 PM 09-Apr-2026 11:00 AM 10-Apr-2026 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India icon image
452. 01-Oct-2025 06:00 PM 09-Apr-2026 11:00 AM 10-Apr-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)/NHAI/Tech/ TS/2024/239275/2025_NHAI_251031_1 National Highways Authority of India icon image
453. 01-Oct-2025 05:30 PM 09-Apr-2026 11:00 AM 10-Apr-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)/NHAI/Tech /TS/2024/239275/2025_NHAI_251026_1 National Highways Authority of India icon image
454. 29-Sep-2025 05:00 PM 01-Apr-2026 05:00 PM 02-Apr-2026 11:00 AM Rehabilitation and upgradation of Ghoti to Trimbak section of NH-160A (km 53.500 to km 101.100) to 4-LPS (47.600 km) in the State of Maharashtra on EPC Mode/12014/148/2024-MAH/ZONE-IV-I/2025_MoRTH_879574_1 Ministry of Road Transport and Highways icon image
455. 29-Sep-2025 05:00 PM 01-Apr-2026 05:00 PM 02-Apr-2026 11:00 AM Rehabilitation and upgradation of Trimbak - Mokhada - Jawhar - Manor - Palghar section of NH-160A to 2-lane/4-lane with paved shoulder (107.035 km) in the State of Maharashtra on EPC Mode./12014/148/2024-MAH/ZONE-IV-II/2025_MoRTH_879578_1 Ministry of Road Transport and Highways icon image
456. 12-Sep-2025 06:30 PM 07-May-2026 11:00 AM 08-May-2026 11:30 AM Upgradation to 2 Lane with Paved Shoulders from Design km 0.000 to km 48.742 and km 61.732 to km 102.284 of Bagasara-Una Section of NH-351K in the State of Gujarat on Hybrid Annuity Mode/RW/NH-12014/136/2024/GJ/Zone-V/2025_MoRTH_877249_1 Ministry of Road Transport and Highways icon image
457. 12-Sep-2025 06:30 PM 07-May-2026 11:00 AM 08-May-2026 11:30 AM Upgradation to Four lane with paved shoulder of Kalavad-Jamnagar section (Package-II) of NH-927D from Design km 0.000 (Ex. km 50.925) to Design km 47.572 (Ex. km 3.720) in the State of Gujarat on Hybrid Annuity Mode./RW/NH-12014/164/2024/GJ/Zone-V/2025_MoRTH_877275_1 Ministry of Road Transport and Highways icon image
458. 11-Sep-2025 05:30 PM 23-Apr-2026 11:00 AM 24-Apr-2026 11:30 AM Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode/NHAI/ Pinjore baddi Nalagarh / Balance work /EPC /HP/ 2025/2025_NHAI_248391_1 National Highways Authority of India icon image
459. 06-Sep-2025 09:00 AM 07-Apr-2026 02:00 PM 10-Apr-2026 03:00 PM SJVN/CC-Delhi/REIA/2025/WIND-4/SJVN/CC-Delhi/REIA/2025/WIND-4/2025_SJVNL_811489_1 SJVN Ltd icon image
460. 22-Aug-2025 06:55 PM 06-May-2026 03:00 PM 07-May-2026 03:00 PM Agency lining-up for Outright Sale of Spent Catalyst containing precious metal platinum./Agency lining-up for Outright Sale of Spent Catalyst containing precious metal platinum./2025_MR_186402_1 IndianOil icon image

Note : For more details and clarifications, please refer to the respective Portal.