Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
471. 20-Jun-2025 06:30 PM 30-Sep-2025 05:00 PM 01-Oct-2025 03:00 PM Rehabilitation and upgradation of Patur-Balapur-Shegaon section of NH-161G from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (Total Length-49.600 km) to 4LPS configuration in the State of Maharashtra on EPC Mode/RO/MUM/TENDER/2025-26/01/2025_MoRTH_865528_1 Ministry of Road Transport and Highways icon image
472. 20-Jun-2025 06:30 PM 26-Sep-2025 05:00 PM 29-Sep-2025 11:00 AM Rehabilitation and upgradation of Armori to Gadchiroli section of NH 353C from km 77-900 to 114-800 to Four Lane standards in the state of Maharashtra on HAM Mode (Length -36.900 Km)./RO/MUM/TENDER/2025-26/03/2025_MoRTH_865553_1 Ministry of Road Transport and Highways icon image
473. 20-Jun-2025 06:30 PM 26-Sep-2025 05:00 PM 29-Sep-2025 11:00 AM Rehabilitation and Upgradation of Umred-Nagbhir Section from km 48-400 to 96-700 (excluding Bhiwapur city portion from km 68-370 to km 70-770 and RUB) of NH-353D to 4LPS configuration in the State of Maharashtra on HAM mode (total length-45. 834 km)./RO/MUM/TENDER/2025-26/04/2025_MoRTH_865564_1 Ministry of Road Transport and Highways icon image
474. 20-Jun-2025 03:30 PM 30-Sep-2025 11:00 AM 01-Oct-2025 11:30 AM Const. of 4lane elevated corridor including approaches from Old Pune Naka to Boramani Naka on NH65 in Solapur City on HAM in Maharashtra (Km 0.050 to Km 9.710)/NHAI/MH/Tech /Old Pune Naka-Boramani Naka/ 2025/2025_NHAI_239021_1 National Highways Authority of India icon image
475. 19-Jun-2025 03:15 PM 19-Sep-2025 02:00 PM 19-Sep-2025 02:00 PM Design, Supply, Erection, Testing & Commissioning of 132 KV Traction Substation, Sectioning & Paralleling post (SPs), and Sub sectioning & Paralleling post (SSPs) in 2x25KV System on Muri-Ranchi-Tori section of Ranchi division of South Eastern Railway to meet 3000MT/SER-EPC-MURI-TORI-2x25kV/82523803 Ministry of Railways --
476. 17-Jun-2025 06:30 PM 09-Oct-2025 05:30 PM 10-Oct-2025 06:00 PM Up-gradation and Construction to 2L with PS of Chanderi-Pichhore road section of NH-346, from design Km 237.600 to Km 292.750 (Design Length-55.150 Chanderi link bypass) in the State of Madhya Pradesh/CE-RO/BHP/Tender/06/2025-26/2025_MoRTH_864978_1 Ministry of Road Transport and Highways icon image
477. 13-Jun-2025 06:00 PM 14-Oct-2025 03:00 PM 15-Oct-2025 03:00 PM Construction of 4 Lane Bypass to Vellore Town starting from Km 47.400 of NH-75 and ending at km 12.650 of NH-38 (Length 20.492 km) in the state of Tamil Nadu./NH-12014/20/2024/TN/South-II/2025_MoRTH_864543_1 Ministry of Road Transport and Highways icon image
478. 12-Jun-2025 07:47 PM 29-Sep-2025 11:00 AM 29-Sep-2025 11:00 AM Design and Construction of New Rail Cum Road Bridge No. 11 over river Ganga, 50 Meters downstream of the existing old Malviya Bridge near Kashi Railway Station, including sub structure and super structure of the Bridge (8 X 108.5 m + 2 X 103.3 m Open Web Steel Girder) for four line tracks on lower deck and six lane Road on upper deck, including Railway and Road approaches as per GAD along with associated OHE Works and General Electric works in Lucknow Division of Northern Railway at Vara/1-W-CPM-C-BSB-EPC/82398273 Ministry of Railways --
479. 10-Jun-2025 05:30 PM 15-Oct-2025 05:30 PM 17-Oct-2025 12:30 PM Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/05/2025-26/2025_MoRTH_863777_1 Ministry of Road Transport and Highways icon image
480. 10-Jun-2025 05:30 PM 17-Sep-2025 11:00 AM 18-Sep-2025 11:30 AM 4 Laning of Paramakudi to Ramanathapuram Sec of NH49 New NH87 from Km 80.360 to Km 127.025 DC in Tamil Nadu on Hybrid Annuity Mode (Project Length-46.665Km)/NHAI/TN/ HAM/NH-49/ Ariya-Peru/ Procurement/2025_NHAI_237981_1 National Highways Authority of India icon image