Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
2ZAZYP
Enter the characters shown in the image.
Total Tenders : 549
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
481. 10-Oct-2025 12:30 PM 03-Feb-2026 03:30 PM 03-Feb-2026 04:00 PM RFP for Network as a service for LIC of India/CO/IT-BPR/NW/RFP/2025-26/02/2025_LIC_815273_1 Life Insurance Corporation of India icon image
482. 10-Oct-2025 10:00 AM 27-Jan-2026 06:00 PM 06-Feb-2026 03:00 PM Provision of Inline Baggage Handling System along with CT-EDS/AAI/CHQ/ER/BGDGR/BHS/2025/2025_AAI_239505_1 Airports Authority of India icon image
483. 09-Oct-2025 06:20 PM 28-Jan-2026 11:00 AM 29-Jan-2026 11:30 AM Overlaying strengthening of Rampur Chowka section of NH 33 from km 140.00 to km 217.300 in the State of Jharkhand on item rate percentage basis/NHAI/RO/RNC/JH/2025-26/13/2025_NHAI_251820_1 National Highways Authority of India icon image
484. 09-Oct-2025 01:00 PM 04-Feb-2026 11:00 AM 05-Feb-2026 11:30 AM 4 laning of NH 167 from Gudebellur at Design Km 182.930 to Mahabubnagar at Design Km 262.940 of Hyderabad Panaji section (Length 80.01km) under NH(O) on Hybrid Annuity Mode (HAM) in the state of Telangana/NHAI/Tech/TS /NH 167/2024/E72619/2025_NHAI_251709_1 National Highways Authority of India icon image
485. 09-Oct-2025 09:00 AM 20-Jan-2026 03:00 PM 21-Jan-2026 03:30 PM Development, Operation and Maintenance of the Multi Modal Logistics Park (MMLP) Nagpur at Sindi, in Wardha District in the State of Maharashtra through Public Private Partnership on Design, Build, Finance, Operate and Transfer (DBFOT) basis/MMPL/MMLP/Nagpur/Conc./2025/2025_NHAI_251673_1 National Highways Authority of India icon image
486. 06-Oct-2025 01:00 PM 25-Feb-2026 03:00 PM 27-Feb-2026 11:00 AM Widening and strengthening to 2-Lane with Paved Shoulder of NH-322 Musrigharari to Darbhanga (Km 72.05 to Km 96.00) in the state of Bihar on EPC Mode for the year 2025-26 Job No. NH-322/BHR/2025-26/132 (Including Utility Shifting)./03/NH/Samastipur/EPC/2025-26/2025_MoRTH_880199_1 Ministry of Road Transport and Highways icon image
487. 03-Oct-2025 05:00 PM 09-Feb-2026 03:00 PM 10-Feb-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways icon image
488. 01-Oct-2025 06:00 PM 04-Feb-2026 11:00 AM 05-Feb-2026 11:30 AM 4-Laning of Jagtial Karimnagar Section of NH-563 from Design Ch.0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near SH1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866 km) on BOT (Toll) mode./NHAI/Tech /TS/2024/239275/2025_NHAI_251035_1 National Highways Authority of India icon image
489. 01-Oct-2025 06:00 PM 04-Feb-2026 11:00 AM 05-Feb-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Jagtial (design km. 92.700) to Mancherial (design km. 160.995) total length 68.295 on Hybrid Annuity Mode (HAM)/NHAI/Tech/ TS/2024/239275/2025_NHAI_251031_1 National Highways Authority of India icon image
490. 01-Oct-2025 05:30 PM 04-Feb-2026 11:00 AM 05-Feb-2026 11:30 AM 4-laning of Armoor - Jagtial - Mancherial Section of NH-63 from Armoor (design km. 29.100) to Jagtial (design km. 92.700) (total length 63.300 km) on Hybrid Annuity Mode (HAM)/NHAI/Tech /TS/2024/239275/2025_NHAI_251026_1 National Highways Authority of India icon image

Note : For more details and clarifications, please refer to the respective Portal.