Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
7aAQa4
Enter the characters shown in the image.
Total Tenders : 541
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
491. 07-Aug-2025 05:40 PM 31-Dec-2025 11:00 AM 01-Jan-2026 11:30 AM Development of 8Lane Elevated Flyover at Tier1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg-1 12.190 to km 28.925) sec of NH60 in Maharashtra on BOT (Toll) Mode./NHAI/Tech/ MH/N-P-K/2024/Pkg-1/2025_NHAI_244433_1 National Highways Authority of India icon image
492. 07-Aug-2025 04:30 PM 31-Dec-2025 11:00 AM 01-Jan-2026 11:30 AM Construction of six lane Greenfield Highway starting from its Junction with NH4B (New NH348) near Pagote (Design km. 0.000) till its Junction on NH48 at Chowk (Design km. 29.219) in Maharashtra to be executed on BOT (Toll) mode under NH(O)/NHAI/PIU/Panvel/ Pagote-Chowk/PATSC and SFC/2025_NHAI_244402_1 National Highways Authority of India icon image
493. 24-Jul-2025 01:00 PM 23-Dec-2025 11:00 AM 24-Dec-2025 11:30 AM Widening of exis 2L to 4L divided carriageway with PS from Km243.800 to Km270.500 of NH 39(Rewa to Churhat Tunnel North portal excluding Churhat Tunnel)and from Km286.200 to Km 313.700 of NH39(Churhat to Sidhi sec)L-54.20 Km under NH(O) in MP on HAM/MPDIV/16 /2024-NHAI- RO Bhopal (266127)/2025_NHAI_242402_1 National Highways Authority of India icon image
494. 24-Jul-2025 12:00 PM 06-Jan-2026 11:00 AM 07-Jan-2026 11:30 AM Construction of 4 lane Greenfield Section of NH-33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode/PROJ/34/2025 Bihar Division/2025_NHAI_242359_1 National Highways Authority of India icon image
495. 24-Jul-2025 09:00 AM 23-Dec-2025 11:00 AM 24-Dec-2025 11:30 AM Construction of 4 laning of Sahebganj Areraj Bettiah of NH 139W (Total length 78.942 km) in the State of Bihar on Hybrid Annuity Mode comprising (i) Section 1 Sahebganj to Areraj (38.362 km) and (ii) Section 2 Areraj to Bettiah (40.580 km)/BRDIV-20021/11/2025 Bihar Division/2025_NHAI_242354_1 National Highways Authority of India icon image
496. 22-Jul-2025 05:30 PM 13-Jan-2026 11:00 AM 14-Jan-2026 11:30 AM Up-gradation of existing 2 lane to 4 lane with paved shoulder from Deshgaon to Julwaniya section of NH-347B from design km 0.000 Existing km 99.924 on NH-347BG to design km 108.643 (Ex km 129.900 on NH-52) under NH(O) in Madhya Pradesh on HAM/MPDIV-21017/ 38/2025-MP Division/2025_NHAI_242181_1 National Highways Authority of India icon image
497. 22-Jul-2025 05:05 PM 13-Jan-2026 11:00 AM 14-Jan-2026 11:30 AM Construction of 2 lane with paved shoulder from Hiwarkhedi-Roshni NH-347B from km 0.000-km 90.010 and 2-4 Lane from km 114.000 near Ashapur Village to km 149.000 near Rudhy village of Betul-Khandwa corridor 125.010 km in MP on HAM under NHO/MPDIV-21017/37/ 2025-MP Division/2025_NHAI_242172_1 National Highways Authority of India icon image
498. 17-Jul-2025 06:55 PM 22-Dec-2025 05:00 PM 26-Dec-2025 05:45 PM Development of New Greenfield Airport at Bundi, Kota Rajasthan. Detailed Designing, Engineering, Procurement and Construction of New Terminal Building, ATC Tower, Fire Station, Car Parking, City Side Development and other associated works./AAI/CHQ-NR/ENGG(C)/KOTA/TB/2025_AAI_241133_1 Airports Authority of India icon image
499. 01-Jul-2025 06:55 PM 08-Jan-2026 03:00 PM 09-Jan-2026 03:30 PM Integrated development of Outer Container Terminal and berth No. 1 though 5 NSD at KDS, SMPK on DBFOT basis through PPP mode./SMPK/KDS/CIV/T/OCT-PPP/2967/40/2025_KoPT_866983_1 Kolkata Port Trust icon image
500. 24-Jun-2025 03:30 PM 07-Jan-2026 11:00 AM 08-Jan-2026 11:30 AM Develop. of 4L Badvel to Nellore Highway from Badvel Gopavaram Vill on NH-67 Ch.630.960 to Guruvindapudi Vill on NH16 Ch.739.094 in AP on BOT mode for a total length of 108.134 km/NHAI/Tech/AP /NH-67/ Bad-Nel/ BOT/2025/2025_NHAI_239297_1 National Highways Authority of India icon image

Note : For more details and clarifications, please refer to the respective Portal.