Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 473
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
231. 03-Aug-2026 05:34 PM 02-Oct-2026 03:00 PM 02-Oct-2026 03:00 PM South Coast Railway (SCoR) (Construction Organization) - Engineering, Procurement and Construction (EPC) Contract for proposed Double Lines with Rail Over Rail (RoR) between new Erragudi & existing Gooty Fort stations, excl. Gooty yard, from Km.0 to Km.7.70 and from Km.9.40 to Km.12.00 (Length - 10.30 Km), in Guntakal division of South Coast Railway (SCoR) in the state of Andhra Pradesh./EPC-01-CAO-C-VSKP-2026/91099217 Ministry of Railways --
232. 03-Aug-2026 04:47 PM 27-Aug-2026 02:30 PM 27-Aug-2026 02:30 PM SUPPLY OF ONE COACH SET OF CHAIR CAR SEATS FOR MC & TC, DTC & EXECUTIVE CHAIR CAR OF TRAIN SET./17251683A/107143271 Ministry of Railways --
233. 03-Aug-2026 04:13 PM 17-Sep-2026 03:00 PM 17-Sep-2026 03:00 PM Design, Supply, Erection, Testing & Commissioning of feeder line, AEC and BEC in connection with upgradation of 1x25KV traction system to 2X25 kV traction system between Bhadrak Khurda Road section of Khurda Road division of East Coast Railway to meet 3000MT loading target. (174RKM/394TKM)/ECoR-2x25-OHE-BK-01A/91129286 Ministry of Railways --
234. 03-Aug-2026 01:29 PM 17-Sep-2026 03:00 PM 17-Sep-2026 03:00 PM Design, Supply, Erection, Testing & Commissioning of feeder line, AEC and BEC in connection with upgradation of 1x25KV traction system to 2X25 kV traction system between Bhadrak Khurda Road section of Khurda Road division of East Coast Railway to meet 3000MT loading target. (174RKM/394TKM)/ECoR-2x25-OHE-BK-01/90983641 Ministry of Railways --
235. 03-Aug-2026 01:24 PM 09-Sep-2026 03:00 PM 09-Sep-2026 03:00 PM South Central Railway - Construction Organisation - Nanded division - Akola-Khandwa Section: Conversion of Track from Metre Gauge (MG) to Broad Gauge (BG) - Construction of Second High-Level Platforms, Foot Over Bridges, Yard Drains, Cover Over Platforms, Collection & Spreading of Ballast, Laying & Linking of track, Transportation, Loading & Unloading of P.Way materials, and Other Miscellaneous Works at Mordar, Jirwan, Takal, Gurhi and Amalakhurd Stations for Development as Crossin/41-CAO-C-SC-2026/90221624 Ministry of Railways --
236. 03-Aug-2026 01:20 PM 08-Sep-2026 03:00 PM 08-Sep-2026 03:00 PM South Central Railway - Construction Organisation : Secunderabad Divison : Secunderabad - Wadi Section : Execution of Earth work in Embankment & Cutting, Blanketing to RDSO standards, Construction of Major bridges, Minor bridges & Road Under Bridges (RUBs), Construction of Station & Service Buildings, Approach Roads, High Level Platforms and Execution of Miscellaneous Civil works in connection with Proposed new 3rd & 4th lines - (1) At Nagalapalli Station yard and (2) Between/40-CAO-C-SC-2026/90438819 Ministry of Railways --
237. 01-Aug-2026 02:02 PM 27-Nov-2026 03:00 PM 27-Nov-2026 03:00 PM NEW BROAD GAUGE SINGLE LINE OF RAILWAY PROJECT COMPRISING THE SECTION COMMENCING FROM PARADOL TAKEOFF POINT (KM 947.257) TO NAGPUR ROAD STATION ( CONNECTING POINT-KM:964.820) AND SLEWING OF EXISTING BORIDAND-CHIRMIRI LINE FROM KM:946.640 TO KM: 947.257 IN THE STATE OF CHHATTISGARH IN THE SOUTH EAST CENTRAL RAILWAY ZONE in EPC Mode./CAO-C-BSP-26-27-15/90263559 Ministry of Railways --
238. 01-Aug-2026 12:34 PM 17-Sep-2026 03:00 PM 17-Sep-2026 03:00 PM Design, Supply, Erection, Testing and Commissioning for OHE upgradation ofexisting 1x25kV system to 2x25kV AT feeding system with feeder and earthingworks in Mahbubnagar(MBNR)(excl)- Dhone(DHNE)(excl) section of HyderabadDivision under South Central Railway. Total 184RKM/184TKM/2x25kV-OHE-MBNR-DHNE-01/91094653 Ministry of Railways --
239. 01-Aug-2026 10:00 AM 31-Aug-2026 03:00 PM 01-Sep-2026 03:00 PM Allotment of covered space exim godown no.4 situated at chennai port/C6/420/2026/T/2026_ChPT_920123_1 Chennai Port Trust icon image
240. 01-Aug-2026 09:00 AM 17-Sep-2026 11:00 AM 18-Sep-2026 11:30 AM Rectification of 25 no of Accident Spots Blackspots in Karur Dindigul Madurai Kayathar sec of NH44 Chettikulam Natham sec of NH785 and Const of Combined Office Building for RO n PIU Madurai in Tamil Nadu on EPC mode/TNDIV-20013/ 12/2026-Tamil Nadu Division/ E-316367/2026_NHAI_286256_1 National Highways Authority of India --

Note : For more details and clarifications, please refer to the respective Portal.