Search for High Value Tenders - Central
Value of Tenders (Service - 1Cr above, Goods- 50Cr above and Works- 100Cr above)

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 482
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
361. 29-Jun-2026 05:30 PM 07-Sep-2026 03:00 PM 08-Sep-2026 03:30 PM Supply, manning, operation and maintenance of one tug of 45 Ton Bollard Pull or more of with Sea going and ETV capabilities for Haldia Dock Complex for a period of 7 years./GMM/436/Hire/Tug/316/2026_KoPT_915032_1 Kolkata Port Trust icon image
362. 29-Jun-2026 02:00 PM 30-Sep-2026 02:15 PM 30-Sep-2026 02:15 PM Design, Manufacture, Supply, Testing and Commissioning of the 200Nos of 20 Car Next Generation Intercity Trains and Maintenance of Trains/08261572/107104004 Ministry of Railways --
363. 29-Jun-2026 10:00 AM 14-Sep-2026 05:00 PM 15-Sep-2026 05:00 PM Consultancy services for preparation of detailed project report (DPR) and pre-construction activities for widening of existing Single / Intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (Tyuni to Bataghat) of NH-707A./RO/UK/NH-707A/DPR/ Tyuni to Bataghat /2026-27/2026_MoRTH_914977_1 Ministry of Road Transport and Highways icon image
364. 26-Jun-2026 03:30 PM 31-Aug-2026 03:00 PM 01-Sep-2026 03:30 PM Removal of Hard patch in approach channel at NMP/CIVIL/CE(C)/EE(C)/34/2026-27/2026_NMPT_914641_1 New Mangalore Port Trust icon image
365. 26-Jun-2026 11:00 AM 27-Aug-2026 03:00 PM 28-Aug-2026 03:00 PM Design and Construction of Underground Section from Charbagh Metro Station to Chowk Metro Station Approx 6.70 km, Construction of 07 Underground Metro Stations including Civil Works for Phase 1B of Lucknow Metro Rail Project at Lucknow UP/LKCC (02)-03/2026_UPMRC_282117_1 Uttar Pradesh Metro Rail Corporation Limited icon image
366. 25-Jun-2026 06:30 PM 28-Sep-2026 11:00 AM 29-Sep-2026 11:00 AM Constr of 05 caverns, each 63.5m in length, comprising 40m main cavern and 23.5m approach cavern with portal, including 4m x 7.5m niches/ living rooms on both sides of the approach cavern with the approach road connecting to existing rd at/HIMANK/EPC/04/2026-27/2026_BRO_774829_1 Dte General Border Roads Organisation icon image
367. 25-Jun-2026 03:30 PM 31-Aug-2026 03:00 PM 01-Sep-2026 03:30 PM Construction of Multi-purpose Cargo Berth (Berth no 17) with allied civil works at New Mangalore Port, on EPC basis/CIVIL/CE(C)/EE(C)/35/2026-27/2026_NMPT_914699_1 New Mangalore Port Trust icon image
368. 23-Jun-2026 05:36 PM 30-Oct-2026 03:00 PM 30-Oct-2026 03:00 PM Design, Supply, Erection, Testing & Commissioning of 132KV/2X25KV Traction Sub Stations (Scott Connected Transformer) with associated Switching Posts for 2 x 25 KV AT feeding system & SCADA in Jaipur - Sawaimadhopur section of Jaipur Division of North Western Railway./EL-C-EPC-TRD-JP-T01-25-26/88148761 Ministry of Railways --
369. 23-Jun-2026 01:20 PM 08-Sep-2026 11:00 AM 09-Sep-2026 11:30 AM Development of a Link Connector Corridor connecting the NH-31 and Varanasi Ring Road along the River Varuna for Decongestion of Varanasi City PKG2 from Km11.744-km19.420 (TL 14.720Km including Loop Ramp) in the State of Uttar Pradesh on HAM/NHAI/HQ/UP(E)/Varuna Corridor/Pkg-2/2026_NHAI_281721_1 National Highways Authority of India icon image
370. 22-Jun-2026 06:55 PM 31-Aug-2026 05:00 PM 01-Sep-2026 05:00 PM Consultancy services for preparation of detailed project report (DPR) and pre-construction activities for Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (Bataghat to Maletha) on NH-707A./RO/UK/NH-707A/DPR/ Bataghat to Maletha /2026-27/2026_MoRTH_914262_1 Ministry of Road Transport and Highways icon image

Note : For more details and clarifications, please refer to the respective Portal.