Search for Latest Active Corrigendums - Central

# keyword finds match in Tender Id,Tender Title,Tender Ref.No and Tender Description
Image CAPTCHA
Enter the characters shown in the image.
Total Tenders : 4235
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
4161. 15-Nov-2019 06:00 PM 10-Aug-2020 06:00 PM 14-Aug-2020 12:00 PM CONSULTANCY SERVICES FOR STRUCTURAL DESIGN OF ADM BLDG AND OFFRS MESS AND OTHER SERVICES AT NAGROTA/87753-A/E8/2019_MES_297913_1 E-IN-C BRANCH - MILITARY ENGINEER SERVICES
4162. 15-Nov-2019 04:00 PM 13-Jul-2020 12:00 PM 14-Jul-2020 02:00 PM Supply of License, Basic Design and Engineering Package and other related services for Hydrogen Generation Unit/RC/B285-000-LA-TN-8603/1007/2019_EIL_517899_1 Engineers India Limited,MoPNG
4163. 15-Nov-2019 11:00 AM 18-Aug-2020 11:00 AM 19-Aug-2020 11:30 AM Construction of Eight lane access controlled Expressway from Km 103.400 to Km 128.000 of Vadodara Mumbai Expressway (Talasari to Karvad Section) in the State of Gujarat UT of DNH and Maharashtra on HAM under Bharatmala Pariyojana (Phase IPackage X)./NHAI/BM/VMEPhaseIB/2018/PKGX/2019_NHAI_35951_1 National Highways Authority of India
4164. 14-Nov-2019 06:30 PM 18-Aug-2020 11:00 AM 19-Aug-2020 11:30 AM Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway Jujuwa to Gandeva Section in the State of Gujarat on HAM under BMP Phase I-Pkg VIII/NHAI/BM/VMEPhaseIB /2018/PKG VIII/2019_NHAI_35940_1 National Highways Authority of India
4165. 14-Nov-2019 06:15 PM 18-Aug-2020 11:00 AM 19-Aug-2020 11:30 AM Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (karvad to jujuwa section) in the state of Gujarat on Hybrid Annuity mode under Bharatmala Pariyojna (Phase I-Package IX)/NHAI/BM/VMEPhaseIB/2018/PKGIX/2019_NHAI_35941_1 National Highways Authority of India
4166. 13-Nov-2019 05:00 PM 13-Jul-2020 12:00 PM 14-Jul-2020 02:00 PM Supply of License, Basic design and Engineering package and other related services for LPG Treating Unit/RC/B285-000-LA-TN-8601/1006/2019_EIL_517923_1 Engineers India Limited,MoPNG
4167. 12-Nov-2019 05:30 PM 08-Jul-2020 05:00 PM 10-Jul-2020 12:30 PM Construction of 4 lane from Bameetha to Khajuraho section of NH 339B from km 0/000 to km 10/000 under NH(O) in the state of Madhya Pradesh on EPC mode/08/SAC/2019-20/2019_MoRTH_518116_1 Ministry of Road Transport and Highways
4168. 12-Nov-2019 04:30 PM 31-Jul-2020 03:00 PM 01-Aug-2020 03:00 PM Supply of Group Captive renewable power to Chennai Metro Rail Limited for long term through tariff based competitive bidding process/CMRL/MEP/Power Procurement through open access/01//2019_CMRL_518133_1 Chennai Metro Rail Limited
4169. 11-Nov-2019 06:35 PM 15-Jul-2020 11:00 AM 16-Jul-2020 11:30 AM Six Laning of Chengala to Neeleshwaram section of NH-17 (New NH66) from Ch. 56.200 (existing km 57.200) to Ch. 93.468 (existing km 95.650) (Total length 37.268 km) in the State of Kerala on HAM under BP in the category of residual works under NHDP/NHAI/Chengala Neleshwaram/NH17/2017-18/2019_NHAI_35753_1 National Highways Authority of India
4170. 11-Nov-2019 06:20 PM 15-Jul-2020 11:00 AM 16-Jul-2020 11:30 AM Six Laning of Thalapady to Chengala section of NH-17 New NH-66 from Ch. 17.200 existing km 17.200 to Ch. 56.200 existing Km 57.200 Total length 39.00km in the State of Kerala on HAM under BMP in the category of residual works under NHDP/NHAI/Tech/KL/Thala-Chenga/ NH-17/2017-18/2019_NHAI_35752_1 National Highways Authority of India