Total Tenders: 671

Organisation Name : Chennai Metro Rail Limited

Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
521. 26-Feb-2019 06:55 PM 13-Apr-2019 03:00 PM 15-Apr-2019 03:00 PM Replacement of Conventional Lights with LED Lights with buy back of conventional lights in Administrative Building and Koyambedu Depot of Chennai Metro Rail Limited/CMRL/MEP/DEPOT/22/2018/2019_CMRL_449197_1 Chennai Metro Rail Limited
522. 26-Feb-2019 04:00 PM 28-Mar-2019 03:00 PM 29-Mar-2019 03:05 PM Licensing of retail spaces/CMRL/BD/Retail-4/2018/482/02/2019_CMRL_449096_1 Chennai Metro Rail Limited --
523. 22-Feb-2019 10:00 AM 09-Mar-2019 03:00 PM 11-Mar-2019 03:00 PM Supply, Installation, Erection, Testing and Commissioning of LT Cable (Electrical Supply) and Plumbing Pipes (Water Supply) required for installation of E- Toilets in Street Level of Kilpauk Medical College Metro Station/CMRL/MEP/STAGE 2A/04/2018/2019_CMRL_446142_1 Chennai Metro Rail Limited --
524. 15-Feb-2019 05:00 PM 25-Mar-2019 03:00 PM 26-Mar-2019 03:05 PM Licensing of semiNaming Rights/CMRL/BD/SNR/2018/490/02/2019_CMRL_444637_1 Chennai Metro Rail Limited
525. 14-Feb-2019 06:55 PM 18-Mar-2019 03:00 PM 19-Mar-2019 03:00 PM Detailed Geotechnical Investigations by drilling Boreholes and collecting and testing the samples and submission of geotechnical reports from BUTT ROAD to KOVILAMBAKKAM of Corridor-5/CMRL/PHASE II/P2C5/GEO-4/2019/2019_CMRL_444504_1 Chennai Metro Rail Limited
526. 14-Feb-2019 06:55 PM 11-Mar-2019 03:00 PM 12-Mar-2019 03:00 PM Detailed Geotechnical Investigations by drilling Boreholes and collecting and testing the samples and submission of geotechnical reports from SHOLINGANALLUR to SIPCOT of Corridor-3 including depot at sipcot./CMRL/PHASE II/P2C3/GEO-5/2019/2019_CMRL_444393_1 Chennai Metro Rail Limited
527. 14-Feb-2019 06:55 PM 18-Mar-2019 03:00 PM 19-Mar-2019 03:00 PM Detailed Geotechnical Investigations by drilling Boreholes and collecting and testing the samples and submission of geotechnical reports from RAMCHANDRA HOSPITAL to POONAMALLEE of Corridor-4 including 400 M of depot approach and depot at Poonamallee/CMRL/PHASE II/P2C4/GEO-3/2019/2019_CMRL_444464_1 Chennai Metro Rail Limited
528. 14-Feb-2019 06:55 PM 18-Mar-2019 03:00 PM 19-Mar-2019 03:00 PM Detailed Geotechnical Investigations by drilling Boreholes and collecting and testing the samples and submission of geotechnical reports from KOVILAMBAKKAM to SHOLINGANALLUR of Corridor-5./CMRL/PHASE II/P2C5/GEO-5/2019/2019_CMRL_444515_1 Chennai Metro Rail Limited
529. 14-Feb-2019 06:55 PM 18-Mar-2019 03:00 PM 19-Mar-2019 03:00 PM Detailed Geotechnical Investigations by drilling Boreholes and collecting and testing the samples and submission of geotechnical reports from CMBT to BUTT ROAD of Corridor-5./CMRL/PHASE II/P2C5/GEO-3/2019/2019_CMRL_444483_1 Chennai Metro Rail Limited
530. 14-Feb-2019 06:55 PM 18-Mar-2019 03:00 PM 19-Mar-2019 03:00 PM Detailed Geotechnical Investigations by drilling Boreholes and collecting and testing the samples and submission of geotechnical reports from POWER HOUSE Ramp to RAMACHANDRA HOSPITAL of Corridor-4./CMRL/PHASE II/P2C4/GEO-2/2019/2019_CMRL_444438_1 Chennai Metro Rail Limited