Total Active Tenders: 267

Organisation Name : Ministry of Road Transport and Highways

Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
251. 04-Nov-2025 03:30 PM 10-Jul-2026 05:30 PM 13-Jul-2026 12:00 PM Construction of a 2L PS Road Over Bridge ROB t km 2 135 parallel to the existing ROB and reconstruction of existing 2 lane ROB at km 48 557 to 4L PS standards in the state of Maharashtra on EPC mode/EENH/Jalna/Tender/NIT No-02/1619/2025-26/2025_MoRTH_884104_1 Ministry of Road Transport and Highways
252. 04-Nov-2025 01:00 PM 13-Jul-2026 05:30 PM 15-Jul-2026 01:00 PM Repairs and Construction of PQC Road Damaged portion 14.1 Km from the work of Karnataka Maharashtra Border Km 70.682 to Akkalkot Km 106.526 and Strengthening of Dudhani Km 74.240 to 77.420 Maindargi Km 89.084 to 92.045 and Akkalkote Km 99.580 to/NHD/TC/EPC/2877/2025 dt 04/11/2025/2025_MoRTH_884044_1 Ministry of Road Transport and Highways
253. 06-Oct-2025 01:00 PM 28-Jul-2026 03:00 PM 30-Jul-2026 11:00 AM Widening and strengthening to 2-Lane with Paved Shoulder of NH-322 Musrigharari to Darbhanga (Km 72.05 to Km 96.00) in the state of Bihar on EPC Mode for the year 2025-26 Job No. NH-322/BHR/2025-26/132 (Including Utility Shifting)./03/NH/Samastipur/EPC/2025-26/2025_MoRTH_880199_1 Ministry of Road Transport and Highways
254. 03-Oct-2025 05:00 PM 29-Jun-2026 03:00 PM 30-Jun-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways
255. 12-Sep-2025 06:30 PM 15-Jul-2026 11:00 AM 16-Jul-2026 11:30 AM Upgradation to Four lane with paved shoulder of Kalavad-Jamnagar section (Package-II) of NH-927D from Design km 0.000 (Ex. km 50.925) to Design km 47.572 (Ex. km 3.720) in the State of Gujarat on Hybrid Annuity Mode./RW/NH-12014/164/2024/GJ/Zone-V/2025_MoRTH_877275_1 Ministry of Road Transport and Highways
256. 12-Sep-2025 06:30 PM 30-Jun-2026 11:00 AM 01-Jul-2026 11:30 AM Upgradation to 2 Lane with Paved Shoulders from Design km 0.000 to km 48.742 and km 61.732 to km 102.284 of Bagasara-Una Section of NH-351K in the State of Gujarat on Hybrid Annuity Mode/RW/NH-12014/136/2024/GJ/Zone-V/2025_MoRTH_877249_1 Ministry of Road Transport and Highways
257. 19-Aug-2025 05:30 PM 22-Jun-2026 05:30 PM 24-Jun-2026 12:30 PM Upgradation and Reconstruction of Sirmaur - Dabhaura Section of NH-135B from Km 36/700 to Km 73/813 to two lane with paved shoulder Configuration in the State of Madhya Pradesh on EPC mode/09/SAC/Tender/Rewa/2025-26/2025_MoRTH_873770_1 Ministry of Road Transport and Highways
258. 30-Jul-2025 06:55 PM 29-Jun-2026 05:30 PM 30-Jun-2026 03:00 PM Balance work under Risk and Cost for Up gradation of Paithan Pategaon Mungi Hatgaon Bodhegaon Ladjalgaon Ghogaspargaon Phulsangvi Ukhandachakla Dahiwandi Shirur to 2 lane with paved Shoulder 4 lane Configuration Package 55 937 Km for proper/EENHD/Chh.S./Tender/NIT No-4/3001607/2025_MoRTH_871262_1 Ministry of Road Transport and Highways
259. 09-Jul-2025 05:00 PM 30-Jun-2026 03:00 PM 01-Jul-2026 03:00 PM Consultancy services of Independent Engineer for Upgradation to Two lane with paved shoulder of Porbandar- Kalavad section of NH-151K/GJ/NH-151K/IE/2025_MoRTH_868105_1 Ministry of Road Transport and Highways
260. 10-Jun-2025 05:30 PM 24-Jun-2026 05:30 PM 26-Jun-2026 12:30 PM Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/05/2025-26/2025_MoRTH_863777_1 Ministry of Road Transport and Highways

Note : For more details and clarifications, please refer to the respective Portal.