Total Active Tenders: 280

Organisation Name : Ministry of Road Transport and Highways

Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
271. 03-Oct-2025 05:00 PM 24-Aug-2026 03:00 PM 25-Aug-2026 03:00 PM Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka/RW/ BNG /NH-150A/Maski Sindhanur Bypass/62/2023( 2nd Call)/2025_MoRTH_880046_1 Ministry of Road Transport and Highways
272. 12-Sep-2025 06:30 PM 08-Sep-2026 11:00 AM 09-Sep-2026 11:30 AM Upgradation to 2 Lane with Paved Shoulders from Design km 0.000 to km 48.742 and km 61.732 to km 102.284 of Bagasara-Una Section of NH-351K in the State of Gujarat on Hybrid Annuity Mode/RW/NH-12014/136/2024/GJ/Zone-V/2025_MoRTH_877249_1 Ministry of Road Transport and Highways
273. 30-Jul-2025 06:55 PM 24-Aug-2026 05:30 PM 25-Aug-2026 03:00 PM Balance work under Risk and Cost for Up gradation of Paithan Pategaon Mungi Hatgaon Bodhegaon Ladjalgaon Ghogaspargaon Phulsangvi Ukhandachakla Dahiwandi Shirur to 2 lane with paved Shoulder 4 lane Configuration Package 55 937 Km for proper/EENHD/Chh.S./Tender/NIT No-4/3001607/2025_MoRTH_871262_1 Ministry of Road Transport and Highways
274. 10-Jun-2025 05:30 PM 07-Sep-2026 05:30 PM 09-Sep-2026 12:30 PM Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/05/2025-26/2025_MoRTH_863777_1 Ministry of Road Transport and Highways
275. 30-May-2025 05:00 PM 15-Sep-2026 05:30 PM 16-Sep-2026 05:30 PM abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas/05/EEH/AKL/2025-26, Dt.28.05.2025/2025_MoRTH_862532_1 Ministry of Road Transport and Highways
276. 26-Mar-2025 05:30 PM 07-Sep-2026 05:30 PM 09-Sep-2026 12:30 PM Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/03/2024-25/2025_MoRTH_854576_1 Ministry of Road Transport and Highways
277. 29-Oct-2024 04:15 PM 13-Oct-2026 03:00 PM 17-Oct-2026 04:00 PM Widening and strengthening of Daringbadi ghat portion from km 231.000 to 256.000 (Design chainage from km 229.500 to 256.468) of NH-59 under NH(O) in Hybrid Annuity Mode Plan 2023-24 in the State of Odisha (Design length 26.968 Kms)./RO/BBSR/11017/NH(O)/2023-24/2024_MoRTH_833034_1 Ministry of Road Transport and Highways
278. 07-Oct-2023 03:00 PM 27-Aug-2026 03:00 PM 28-Aug-2026 03:00 PM Rehabilitation and Upgradation to 2 4 lane with paved shoulders from Km 79.300 to Km 87.360 and Km 88.437 to Km 93.819 of NH 167K Bridge Approaches of Iconic Bridge across river Krishna in the State of Telangana and Andhra Pradesh on EPC Basis./RW/HYD/Misc-28/NIT/2023-24/008 dt 07.10.2023/2023_MoRTH_775185_1 Ministry of Road Transport and Highways
279. 07-Oct-2023 03:00 PM 27-Aug-2026 03:00 PM 28-Aug-2026 03:00 PM Rehabilitation and Upgradation of Nehru Nagar to Kothagudem Section to Two Lane Four Lane with Paved Shoulders from Km 178.500 to Km 230.580 of NH 930P in the State of Telangana on EPC Basis/RW/HYD/Misc-28/NIT/2023-24/009 dt 07.10.2023/2023_MoRTH_775194_1 Ministry of Road Transport and Highways
280. 15-Sep-2023 05:00 PM 31-Aug-2026 04:00 PM 01-Sep-2026 11:00 AM Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode/RW/PAT/NH133E/Bhaglpur73/22-23/2023_MoRTH_771865_1 Ministry of Road Transport and Highways

Note : For more details and clarifications, please refer to the respective Portal.