Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
Organisation Name |
Corrigendum |
341. |
17-May-2025 12:30 PM |
17-Jul-2025 11:00 AM |
18-Jul-2025 12:00 PM |
SITC and Operation and Maintenance of Advanced Traffic Management System (ATMS) on National Highway 92, 730B, 730C, and 731K from Etawah to Pilibhit (length 240.726 Km.)in the state of UP (GNHCP) with loan assistance of World Bank on EPC mode/GNHCP_UP_ATMS_1 dated 17.05.2025/2025_MoRTH_860498_1 |
Ministry of Road Transport and Highways |
 |
342. |
16-May-2025 06:15 PM |
30-Jun-2025 03:00 PM |
01-Jul-2025 04:00 PM |
Consultancy Services for Preparation of Feasibility Report cum Detail Engineering report for construction of four lane road Km. 275-000 to 313-000 of NH 927A ing from near Mohan Colony Chauhara, Banswara to Danpur upto Rajasthan-MP Border/RO/JAI/DPR/01/2025-26/495/2025_MoRTH_860437_1 |
Ministry of Road Transport and Highways |
-- |
343. |
16-May-2025 06:00 PM |
17-Jun-2025 02:00 PM |
18-Jun-2025 02:00 PM |
Upgradation of Existing NH-115 from 2-lane Configuration to 2-lane with Paved Shoulder from km 44.369 to km 54.806 (L 10.437 km) in Tinsukia District under Dibrugarh NH Division in the state of Assam under EPC mode (Job No. 115/AS/2024-25/283)/BRD/RD/19/2025/5/2025_MoRTH_860450_1 |
Ministry of Road Transport and Highways |
-- |
344. |
16-May-2025 06:00 PM |
30-May-2025 12:00 PM |
31-May-2025 12:00 PM |
Consultancy Service for proof checking, assisting supervision of work, Quality Control of Upgradation and strengthening to 2 lane_PS from km. 95.500 to 129.775 of NH168G Idar-Bhiloda-Samlaji in the state of Gujarat under EPC mode (Length 34.275Km)/04 of 2024-2025 (2nd Attempt)/2025_MoRTH_860442_1 |
Ministry of Road Transport and Highways |
-- |
345. |
16-May-2025 02:00 PM |
17-Jun-2025 02:00 PM |
18-Jun-2025 02:00 PM |
Repair and Rehabilitation of Br No. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on NH 15 under Annual plan for the year 2024-25 under PWD under Nagaon NH Division, Nagaon in the state of Assam on EPC Mode.(Job No Br/15/AS/2024-25/284)./NHC/BR/12/2024/Pt/05/2025_MoRTH_860324_1 |
Ministry of Road Transport and Highways |
-- |
346. |
16-May-2025 10:00 AM |
07-Jul-2025 11:00 AM |
09-Jul-2025 11:30 AM |
Construction of Two LANE Road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of Bhopalpatnam Venktapura Warangal Hyderabad Road of NH163 in the State of Chhattisgarh./27/CE/NH/TC/44-11/2025 (1st Call)/2025_MoRTH_859975_1 |
Ministry of Road Transport and Highways |
 |
347. |
16-May-2025 10:00 AM |
21-Jul-2025 05:30 PM |
25-Jul-2025 11:00 AM |
Construction Railway RoB at Km. 3.485 along Parali Bypass on Deogaon fata_Parali_Latur_Omerga_road NH 548B in the State of Maharashtra./NIT No. 07/EENHD/Latur/956/2025/2025_MoRTH_860253_1 |
Ministry of Road Transport and Highways |
 |
348. |
16-May-2025 10:00 AM |
04-Jun-2025 11:00 AM |
05-Jun-2025 01:00 PM |
Construction of Foot over Bridges FOB on left out portion of NH65 near Baldev Ram Mirdha Govt. College Nagaur and on left out portion of NH89 near Jawaharlal Nehru Govt. District Hospital, Nagaur in the state of Rajasthan on EPC Mode./01/2025-26 SE NH Circle BIkaner/2025_MoRTH_860238_1 |
Ministry of Road Transport and Highways |
-- |
349. |
16-May-2025 10:00 AM |
15-Jul-2025 05:30 PM |
17-Jul-2025 11:30 AM |
Short term maintenance of Takhatpur Ex. Road from Km. 26.542 to Km. 32.093, Mungeli Ex. Road from Km. 45.786 to Km. 56.275, Pandariya Ex. Road from Km. 82.582 to Km. 87.133 and Pondi Ex. Road from Km. 103.166 to Km. 104.756 on NH130A/24/CE/NH/TC/44-17/2024 (2nd Call)/2025_MoRTH_859964_1 |
Ministry of Road Transport and Highways |
 |
350. |
16-May-2025 10:00 AM |
16-Jul-2025 11:00 AM |
18-Jul-2025 11:30 AM |
Reconstruction of Box Cell in Km. 31.600, Km. 31.700 Km. 42.600, Km. 44.000, Km. 51.600, Km. 122.400, Km. 124.400, Km. 135.000, Km. 153.800 of NH-30(Old NH-221) in the State of Chhattisgarh./28/CE/NH/TC/44-12/2025 (1st Call)/2025_MoRTH_859976_1 |
Ministry of Road Transport and Highways |
 |