Total Tenders: 22391

Organisation Name : Ministry of Road Transport and Highways

Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id Organisation Name Corrigendum
481. 28-Apr-2025 03:30 PM 05-May-2025 12:00 PM 07-May-2025 01:00 PM Short Term Maintenance Contract to NH-202 (Old-155) from 254.000 Km to Km283.000 (Length 29.00 KM)under NH Division IV Kiphire in the state of Nagaland./NO. CE/NH/STMC/NH-202/2024-25/13/2025_MoRTH_858081_1 Ministry of Road Transport and Highways
482. 28-Apr-2025 03:00 PM 19-May-2025 03:00 PM 20-May-2025 03:00 PM Slip Clearance Work by Back Hoe Loader and Tracked Hydraulic Exacavator For Smooth and safe traffic from Km 92.880 to 121.550 stretch of NH-09 during mansoon season 2025 -26 and upcoming duration./665/Tender dt 26.04.2025/2025_MoRTH_858035_1 Ministry of Road Transport and Highways
483. 28-Apr-2025 03:00 PM 19-May-2025 03:00 PM 20-May-2025 03:00 PM Slip Clearance work by Back Hoe Loader and Tracked Hydraulic Excavator for smooth and safe traffic from km 142.00 to 145.100 stretch (According to old chainage) of NH-09 during mansoon season 2025-26 and upcoming duration./665/Tender dt 26.04.2025/2025_MoRTH_858062_1 Ministry of Road Transport and Highways
484. 28-Apr-2025 03:00 PM 19-May-2025 03:00 PM 20-May-2025 03:00 PM Slip Clearance Work by Back Hoe Loader and Tracked Hydraulic Exacavator For Smooth and safe traffic from Km 0.00 to 93.00 stretch of NH-309 A during mansoon season 2025 -26 and upcoming duration./665/Tender dt 26.04.2025/2025_MoRTH_858059_1 Ministry of Road Transport and Highways
485. 28-Apr-2025 03:00 PM 13-Jun-2025 05:00 PM 16-Jun-2025 12:00 PM DPR and Preconstruction activities for Rehabilitation and Upgradation of Forest stretches in Sarsam to Kothari Ch. Km 33.000 to Km 90.000 and Kothari to Dhanoda Ch. Km 90.000 to Km 147.650) of NH 161A to 2LPS configuration in the state of Maharashtra/No.NHDN/TEN/DPR/Nan/1190/2025/2025_MoRTH_858076_1 Ministry of Road Transport and Highways
486. 28-Apr-2025 03:00 PM 19-May-2025 03:00 PM 20-May-2025 03:00 PM Slip Clearance Work by Back Hoe Loader and Tracked Hydraulic Exacavator For Smooth and safe traffic from Km 128.310 to 135.075 an km 143.750 to 162.768 (According to design chainage) stretch of NH-09 during mansoon season 2025 -26 and upcoming dura/665/Tender dt 26.04.2025/2025_MoRTH_858046_1 Ministry of Road Transport and Highways
487. 28-Apr-2025 03:00 PM 19-May-2025 03:00 PM 20-May-2025 03:00 PM lip Clearance Work by Back Hoe Loader and Tracked Hydraulic Exacavator For Smooth and safe traffic from Km 163.00 to 194.800 stretch of NH-09 during mansoon season 2025 -26 and upcoming duration./665/Tender dt 26.04.2025/2025_MoRTH_858056_1 Ministry of Road Transport and Highways
488. 28-Apr-2025 01:00 PM 13-May-2025 05:00 PM 14-May-2025 05:00 PM Construction of RCC Drain in km 42(P) 43(P) of NH33 (old NH 110) near village Bibipur Kako District Jehanabad for the year 2024 25 Under NH Division Gaya/02/2025-26/2025_MoRTH_858044_1 Ministry of Road Transport and Highways --
489. 28-Apr-2025 11:45 AM 12-Aug-2025 05:30 PM 14-Aug-2025 12:30 PM Consultancy services for Authoritys Engineer for Supervision of Work of Upgradation of Existing Intermediate Lane Flexible Pavement to 2L with PS from Km 0.00 to Km 75.00 on Orchha Tikamgarh Shahgarh NH 539 in the State of Madhya Pradesh on EPC Mode/CE-RO/BHP/Tender/AE/02/2025-26/2025_MoRTH_857688_1 Ministry of Road Transport and Highways
490. 28-Apr-2025 10:00 AM 25-Jul-2025 05:30 PM 28-Jul-2025 05:30 PM Rehabilitation and Up.gradation of Guhagar Chiplun Helwak Road from existing Km 26.890 to 403.610, Design Km 26.230 to 403.000 NH 166 E Length 13.77 Km two lanes with paved shoulders configuration in the state of Maharashtra on Engineering, Procureme/Bid/Package No/EENH/Ratnagiri/NIT No.4 / 1032/2025_MoRTH_858014_1 Ministry of Road Transport and Highways