| Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
Organisation Name |
Corrigendum |
| 1. |
26-Feb-2026 06:55 PM |
09-Mar-2026 06:55 PM |
10-Mar-2026 11:00 AM |
Repair and maintenance of HT OH power Transmission line throughout monsoon season/NCL/JRD/ENM/Tender/25-26/44/2026_NCL_354637_1 |
Northern Coalfields Limited |
-- |
| 2. |
26-Feb-2026 06:55 PM |
10-Mar-2026 10:00 AM |
11-Mar-2026 10:00 AM |
Fabrication, transportation, and installation of 300 Nos. of Indicator Post wrapped with fluorescent tape, along sides and divider of haul road at Bina Project./Bina/SO(Min)/Tender/25-26/01 dt. 26.02.2026/2026_NCL_352558_1 |
Northern Coalfields Limited |
-- |
| 3. |
26-Feb-2026 06:00 PM |
10-Mar-2026 10:00 AM |
11-Mar-2026 11:00 AM |
Carrying, laying, jointing and dismantling of pipeline of different sizes and installation, dismantling and shifting of pumps and its accessories during monsoon 2026 at Block-B Project/NCL/BB/EnM/Tender/25-26/33 dt. 26.02.2026/2026_NCL_354609_1 |
Northern Coalfields Limited |
-- |
| 4. |
26-Feb-2026 02:00 PM |
10-Mar-2026 02:00 PM |
11-Mar-2026 02:00 PM |
Fabrication of New Pontoon (02 Nos.) in complete aspect and fabrication of floating drum structures (03 Nos.), making of Sheds for Pump -Set on Pontoons to be installed for Monsoon 2026 (08 Nos.) at Bina Project./B/EM/eTender/2025-26/76 Dt. 25.02.2026/2026_NCL_354638_1 |
Northern Coalfields Limited |
-- |
| 5. |
26-Feb-2026 02:00 PM |
10-Mar-2026 02:00 PM |
11-Mar-2026 02:00 PM |
Repair/maintenance of 300/250/200 MM dia MS / GI Pipeline as and when required before and during monsoon 2026 within mine area at Bina Project./B/EM/eTender/2025-26/77 Dt. 25.02.2026/2026_NCL_354655_1 |
Northern Coalfields Limited |
-- |
| 6. |
26-Feb-2026 02:00 PM |
10-Mar-2026 02:00 PM |
11-Mar-2026 02:00 PM |
Fabrication of universal joints/ moving units, 150/200/300MM MS bend, delivery pipes (S and U Type), suction pipe and flanges of different sizes for monsoon 2026 at Bina Project./B/EM/eTender/2025-26/78 Dt. 25.02.2026/2026_NCL_354661_1 |
Northern Coalfields Limited |
-- |
| 7. |
26-Feb-2026 02:00 PM |
09-Mar-2026 02:00 PM |
10-Mar-2026 09:00 AM |
Repairing and machining / boring of coupling and key way cutting of different couplings at EM Deptt. in Monsoon and Non-Monsoon period 2026 at Khadia Project./KHD/EM/E-Tender/25-26/503 Date 26.02.2026/2026_NCL_354625_1 |
Northern Coalfields Limited |
-- |
| 8. |
25-Feb-2026 06:55 PM |
10-Mar-2026 10:00 AM |
11-Mar-2026 11:00 AM |
Repairing and maintenance of transformers (Ratings 5MVA 33/6.6kV, 3.15MVA 33/6.6kV and 2MVA 33/3.3kV) and filtration of transformer oil of Block-B Project./NCL/BB/EnM/Tender/25-26/32 dt. 25.02.2026/2026_NCL_354548_1 |
Northern Coalfields Limited |
-- |
| 9. |
25-Feb-2026 06:55 PM |
10-Mar-2026 10:00 AM |
11-Mar-2026 11:00 AM |
Lighting arrestor and earthing arrangement at pump, nearby area and different locations inside mines at Block-B Project./NCL/BB/EnM/Tender/25-26/31 dt. 25.02.2026/2026_NCL_354546_1 |
Northern Coalfields Limited |
-- |
| 10. |
25-Feb-2026 06:55 PM |
09-Mar-2026 06:55 PM |
10-Mar-2026 09:00 AM |
Fabrication and erection of different types of structural steel work in EnM during monsoon 2026 at Khadia Project./KHD/EM/E-Tender/25-26/502 Date 25.02.2026/2026_NCL_354559_1 |
Northern Coalfields Limited |
-- |