| Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
Organisation Name |
Corrigendum |
| 11. |
25-Feb-2026 06:55 PM |
11-Mar-2026 11:00 AM |
12-Mar-2026 11:00 AM |
Cleaning of drainage arrangement for bottom industrial area, culverts of railway track and wharfwall and drainage from Bareja downstream to Nandgaon rehabilitation area at Nigahi Project/NGH/C/25-26/ETN-54, Dated 25.02.2026/2026_NCL_354562_1 |
Northern Coalfields Limited |
-- |
| 12. |
25-Feb-2026 06:55 PM |
18-Mar-2026 11:00 AM |
19-Mar-2026 11:00 AM |
Providing Gabion Wall along north and south dump, at central entry, around main sumps and various other locations and Protection of CHP conveyor belt at south and mid entry along with di of existing major drain at Bina Project/B/Civil/2025-26/ETN-39 dtd 25.02.2026/2026_NCL_354417_1 |
Northern Coalfields Limited |
-- |
| 13. |
25-Feb-2026 06:55 PM |
10-Mar-2026 10:00 AM |
11-Mar-2026 11:00 AM |
Repairing and maintenance of transformers (Ratings 5MVA 33/6.6kV, 3.15MVA 33/6.6kV and 2MVA 33/3.3kV) and filtration of transformer oil of Block-B Project./NCL/BB/EnM/Tender/25-26/32 dt. 25.02.2026/2026_NCL_354548_1 |
Northern Coalfields Limited |
-- |
| 14. |
25-Feb-2026 06:55 PM |
10-Mar-2026 10:00 AM |
11-Mar-2026 11:00 AM |
Lighting arrestor and earthing arrangement at pump, nearby area and different locations inside mines at Block-B Project./NCL/BB/EnM/Tender/25-26/31 dt. 25.02.2026/2026_NCL_354546_1 |
Northern Coalfields Limited |
-- |
| 15. |
25-Feb-2026 06:55 PM |
16-Mar-2026 11:00 AM |
17-Mar-2026 11:00 AM |
Cleaning of culverts and pucca drains before and during monsoon at different places at Nigahi Project./NGH/C/25-26/ETN-53, Dated 25.02.2026/2026_NCL_354558_1 |
Northern Coalfields Limited |
-- |
| 16. |
25-Feb-2026 06:55 PM |
09-Mar-2026 06:55 PM |
10-Mar-2026 06:55 PM |
Repairing / rewinding of one no. three phase induction motor ( 6.6KV and capacity 1000KW) Make- ABB (Sl No.2022651/3) at Bina Project./B/EM/eTender/2025-26/75 Dt. 25.02.2026/2026_NCL_354488_1 |
Northern Coalfields Limited |
-- |
| 17. |
25-Feb-2026 06:00 PM |
09-Mar-2026 10:00 AM |
10-Mar-2026 11:00 AM |
Supply, installation, testing, commissioning, repair and Maintenance of HT Gang Operated Air Break Switches and overhead line maintenance works during monsoon 2026 at Block-B Project./NCL/BB/EnM/Tender/25-26/24 dt. 22.02.2026/2026_NCL_354140_1 |
Northern Coalfields Limited |
-- |
| 18. |
25-Feb-2026 06:00 PM |
09-Mar-2026 10:00 AM |
10-Mar-2026 11:00 AM |
Cleaning of sub-station yard, Trimming of tree branches and bushes around and under overhead line (33KV, 6.6KV, 3.3KV, 440V, 220V) and dispose throw it up at suitable place pre and during monsoon period at Block-B mines/NCL/BB/EnM/Tender/25-26/28 dt. 23.02.2026/2026_NCL_354242_1 |
Northern Coalfields Limited |
-- |
| 19. |
25-Feb-2026 06:00 PM |
09-Mar-2026 10:00 AM |
10-Mar-2026 11:00 AM |
Dismantling, repairing, commissioning of old pontoons and its pathway for Monsoon 2026 at Block-B Project./NCL/BB/EnM/Tender/25-26/26 dt. 23.02.2026/2026_NCL_354201_1 |
Northern Coalfields Limited |
-- |
| 20. |
25-Feb-2026 06:00 PM |
09-Mar-2026 10:00 AM |
10-Mar-2026 11:00 AM |
Assistance required for attending the fault in the backshift as and when required during monsoon for the period of 120 days at Block-B Project./NCL/BB/EnM/Tender/25-26/30 dt. 24.02.2026/2026_NCL_354336_1 |
Northern Coalfields Limited |
-- |