Central - Tenders Closing in 14 days

Total Tenders : 20210
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
18851. 16-Mar-2026 08:45 PM 07-Apr-2026 03:00 PM 07-Apr-2026 03:00 PM Electrical arrangements for: Redevelopment of Gummidipundi Railway Station under ABSS Phase-I (Additional Items)/ME-29-II-1085-2026/88143688 Ministry of Railways --
18852. 16-Mar-2026 04:32 PM 07-Apr-2026 03:00 PM 07-Apr-2026 03:00 PM Panel & floor welding work, other electric arc cum gas welding activities: riveting & huck bolting work, and hiring of Motor vehicle driver & helper at BNDM for a period of 02 years./MECHCKP-25-26-34/88148609 Ministry of Railways --
18853. 16-Mar-2026 04:16 PM 07-Apr-2026 03:00 PM 07-Apr-2026 03:00 PM Supply of potable water through tankers under DEN/E-I./NIT-35-B-25-26-WE/88149786 Ministry of Railways --
18854. 16-Mar-2026 04:54 PM 07-Apr-2026 03:00 PM 07-Apr-2026 03:00 PM Supply of potable water through tankers under DEN/E-II./NIT-35-C-25-26-WE/88149824 Ministry of Railways --
18855. 16-Mar-2026 04:20 PM 07-Apr-2026 03:00 PM 07-Apr-2026 03:00 PM AMC for two years of commercial RO 3000 Ltr/hrs. at RPSF Block A Electric workshop printing press and 2 nos 500 Ltrs/Hr. capacity at RPF & RPSF and other different capacity RO in the section of SSE/W/Punjab Bagh under ADEN-II. & Maintenance of RO plant cap. 3000 LPH, softening plant, Chlorine dosing pump & filtration plant at P.K. Road in the section of SSE/W/PG under ADEN/E-I./NIT-35-A-25-26-WE/88149837 Ministry of Railways --
18856. 16-Mar-2026 04:01 PM 07-Apr-2026 03:00 PM 07-Apr-2026 03:00 PM A) Improvement to existing boundary wall of Kurla railway colony. B) Repairs to road at Kurla Railway colony under ADEN(Wks)BY. C) Repairs to drainage line at Kurla Railway Colony under ADEN(Wks)BY. D) VVH - Repairs to approach road, side drain, pathway of building, plinth protection of bldg. at VVH Colony under SSE(Wks)CLA under ADEN(W)BY./CR-DRMWBB-2026-15-01/88153383 Ministry of Railways --
18857. 16-Mar-2026 04:59 PM 07-Apr-2026 03:00 PM 07-Apr-2026 03:00 PM Supplying and stacking on Railway ground 65mm machine crushed stone ballast as per latest specification of RDSO/LKO of Feb-2023 with latest amendments including royalty and fees etc and loading the same into Railway hoppers/wagons etc as directed by ADEN at site at DUD depot.(Total 50,000 m3)/08-2026-SrDENS/88155006 Ministry of Railways --
18858. 16-Mar-2026 06:03 PM 07-Apr-2026 03:00 PM 07-Apr-2026 03:00 PM Elimination of level crossings No. 13 at Km 20/8-9, 16 at Km 26/9-27/0, 19 at Km 36/0-1 & 20 at 40/3-4 by providing road under bridges between Gandhidham - New Bhuj Section under jurisdiction of Sr.DEN (NW)-ADI./DRM-ADI-216-2025-26/88155409 Ministry of Railways --
18859. 16-Mar-2026 05:17 PM 07-Apr-2026 03:00 PM 07-Apr-2026 03:00 PM (1)Flash Butt welding in main line patches between CSMT-KYN under South section.(2) Flash Butt welding in main line patches between CSMT-KYN section.(TWR-6.94km) (3)Flash Butt welding in main line patches between CSMT-KYN section.(TWR-11.3km) (4)Flash Butt welding in main line patches between CSMT-KYN section.(TWR-8.186km) (5) Flash Butt welding in main line patches between CSMT Panvel- (TWR-2.48 Km) and Thane-Vashi (TWR-2.41 Km). (6)-Flash Butt welding in main line patches for CSMT-PNVL (TWR-/CR-DRMWBB-2026--13-07/88156688 Ministry of Railways --
18860. 16-Mar-2026 07:28 PM 07-Apr-2026 03:00 PM 07-Apr-2026 03:00 PM A) Schedule for Cleaning of track side vegetation, removal & disposal of small trees, plants, bushes and other weeds and cutting of big trees in KYN - KJT, KJT - PNVL & NRL - MAE section under ADEN T KYN. B)Cleaning of trak side vegetation and removal & disposal of small trees and plants, creeper, bushes, pathenium, beshram and other weeds in track for a period of one year under ADEN (N) LNL section./CR-DRMWBB-2026-15-04/88159817 Ministry of Railways --

Note : For more details and clarifications, please refer to the respective Portal.