Central - Tenders Closing in 14 days

Total Tenders : 20988
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
14841. 20-Aug-2026 07:42 PM 21-Sep-2026 03:00 PM 21-Sep-2026 03:00 PM Deep Screening by BCM and other ancillary works for track maintenance in BSB-ZBD section in the jurisdiction of Sr. DEN-III/LKO./25-Sr-DEN-III-LKO-2026-27/91517484 Ministry of Railways --
14842. 20-Aug-2026 05:00 PM 21-Sep-2026 03:00 PM 24-Sep-2026 03:30 PM Carrying out replacement of RR wall with RCC wall, Modification of Existing Staircase, RCC works in substructure and superstructure, various miscellaneous works of Civil, Electrical, Mechanical for RCnD Pantry at RCnD Stilt Area at North Site, BARC./BARC/CED/ET/34/2026-2027 Dated 13/08/2026/2026_BARC_923008_1 Bhabha Atomic Research Centre --
14843. 20-Aug-2026 05:19 PM 21-Sep-2026 03:00 PM 21-Sep-2026 03:00 PM Signal and Telecom work in connection with earthwork of Construction of Important Bridge No. 313 Up & Dn line on new alignment including Earthwork, Track work and associated Civil Works (From Chainage Rly KM 188+200 to Rly KM 189 + 500) between Pardi station and Atul station in connection with increase of speed to 160 Kmph in Virar-Surat section of Mumbai Division Western Railway./SG_216_2_113_WA_313/89480035 Ministry of Railways --
14844. 19-Aug-2026 07:52 PM 21-Sep-2026 03:00 PM 21-Sep-2026 03:00 PM Augmentation of Existing Guard & Driver Running room by the Provision of one additional floor (3rd Floor) at BSB Station under ADEN/BSB in the jurisdiction of Sr.DEN-III/LKO./24-Sr-DEN-III-LKO-2026-27/91485435 Ministry of Railways --
14845. 20-Aug-2026 01:02 PM 21-Sep-2026 03:00 PM 21-Sep-2026 03:00 PM Provision of Air Conditioners in Construction Office of SECR Nagpur Division./EL-G-E-OT-26-27-21/90310494 Ministry of Railways --
14846. 20-Aug-2026 04:07 PM 21-Sep-2026 03:00 PM 21-Sep-2026 03:00 PM Supply, Assembling, Fixing, Commissioning of new tamping units and reconditioning/ overhauling of Tamping units fitted in PCTM machine of CRCC make./SWRTMYPR2026WT04/90900825 Ministry of Railways --
14847. 28-Aug-2026 12:32 PM 21-Sep-2026 03:30 PM 21-Sep-2026 03:30 PM Annual Maintenance Contract (AMC) of lift installed in administrative building of Rail Coach Factory, Kapurthala./RCF-EL-TS-ET-157-2026-27/91680647 Ministry of Railways --
14848. 26-Aug-2026 04:35 PM 21-Sep-2026 03:30 PM 21-Sep-2026 03:30 PM Electrical(G) portion of work for:-(1) Construction of RUB at Km. 725/25-27 in lieu of LC No. 369 between BSP-DPH section in Howrah-Mumbai main line (2) Construction of RUB near LC no. 375(OTGAN) in between BYL-DGS section (Km. 739/3-5) on Howrah-Mumbai main line (3) Construction of RUB by box pushing method in lieu of LC no. 376 at Km. 741/26 between NPI-DGS section on NGP-HWH main line. (4) Provision of RUB in lieu of LC no.389 at Km.774/13-15 between BYT-HN station. (5) Construction of RUB/SrDEE-G-R-OTP-26-27-18/91424701 Ministry of Railways --
14849. 28-Aug-2026 12:53 PM 21-Sep-2026 03:30 PM 21-Sep-2026 03:30 PM Railway Electrification work for upgradation of DLCR station from DK class to B class in Lumding Division, N.F. Railway. (TKM 1.5)/EL-TRD-NFR-LMG-OHE-MOD-72/91446689 Ministry of Railways --
14850. 08-Sep-2026 06:00 PM 21-Sep-2026 03:30 PM 22-Sep-2026 03:30 PM Supply of Spares and Consumables for CFR RON, MON and Cetane Engines/N1JB26022/2026_BGR_191338_1 IndianOil --

Note : For more details and clarifications, please refer to the respective Portal.