Central - Tenders Closing in 7 days

Total Tenders : 11339
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
10181. 26-Nov-2025 04:00 PM 26-Dec-2025 03:00 PM 29-Dec-2025 03:00 PM Installation and commissioning of heavy duty energy chain system at ash/NTPC/USSC-CPG1/9900313863/2025_NTPC_102411_1 NTPC Limited icon image
10182. 26-Nov-2025 03:30 PM 26-Dec-2025 03:00 PM 26-Dec-2025 03:30 PM Supply, Installation, Commissioning and testing of 31 Nos. (2x2 Ton each) of Industrial Air conditioners along with associated cables and accessories as per the technical specification including dismantling of the old Industrial ACs under WRTCC/WR1/NT/W-MISC/DOM/ZA3/25/14075/26700 Power Grid Corporation of India Limited --
10183. 02-Dec-2025 05:17 PM 26-Dec-2025 03:00 PM 26-Dec-2025 03:00 PM Improvement of Structural life of Track Girder Bridge by Sand blasting & Metalizing, Painting on CSMT-CLA(HB) section of Mumbai Division./CR-BR292025-26/82459170 Ministry of Railways --
10184. 02-Dec-2025 05:27 PM 26-Dec-2025 03:00 PM 26-Dec-2025 03:00 PM Improvement of Structural life of Track Girder Bridge by Sand blasting & Metalizing, Painting of various bridges on DW-BSR, DW-PNVL and PNVL-KJT section of Mumbai Division./CR-BR302025-26/82462417 Ministry of Railways --
10185. 02-Dec-2025 07:06 PM 26-Dec-2025 03:00 PM 26-Dec-2025 03:00 PM Provision of 3 phase supply to proposed 2x25 kV TSS at Badnera i.e. (A) Supply & erection of EHV equipments for proposed 3rd phase of TSS-I & II bay at 220 kV Badnera S/Stn under EHV O&M Division, Amravati. (B) Stringing of 3rd phase for existing 220 kV Badnera TSS - I & II line (C)Conversion of existing 2-phase to 3-phase of 132kV Akola-TSS DCDC line along with replacement of existing 132 kV TSS I & II Bay equipment s under jurisdiction of EHV Line Maint. Sub Divisio/BSL-LC-TENDER-05-2025/82536855 Ministry of Railways --
10186. 02-Dec-2025 04:37 PM 26-Dec-2025 03:00 PM 26-Dec-2025 03:00 PM Execution of P.Way works w.r.t. maintenance of yards under jurisdiction of SSE(P.Way)/Boinda of Sambalpur Division./37-eT-DENE-SBP-25/82613470 Ministry of Railways --
10187. 02-Dec-2025 05:13 PM 26-Dec-2025 03:00 PM 26-Dec-2025 03:00 PM Improvement of structural life of track Girder bridge by Sand Blasting & Metalizing of Wadibunder Viaduct br. on CSMT-CLA (HB) line./CR-BR282025-26/83100613 Ministry of Railways --
10188. 02-Dec-2025 01:05 PM 26-Dec-2025 03:00 PM 26-Dec-2025 03:00 PM Improvement to Road in front of DRM office FZR, Colony no.04 from Loco Road to Basti Tankawali, Burt Road at FZR in the section of SSE/W/FZR under ADEN-1/FZR./189-2025-26-ADEN-1-FZR/83822602 Ministry of Railways --
10189. 02-Dec-2025 05:06 PM 26-Dec-2025 03:00 PM 26-Dec-2025 03:00 PM Epoxy based painting and repairs of PSC Bridges, Br. No. 42/1 UP &DN on MNKD-PNVL and Raoli Junction flyover (Bridge No 10/2) in VDLR-MM chord section of Mumbai division./CR-BR272025-26/84250226 Ministry of Railways --
10190. 02-Dec-2025 12:48 PM 26-Dec-2025 03:00 PM 26-Dec-2025 03:00 PM TWR (Through Weld Renewal) 28.312 KM in various yard lines by using Road cum Rail Mobile Flash Butt Welding plant of old AT Welds on LDH-FZR section and BTI-FZR section under ADEN-1/FZR in c/with TWR of 114.646 KM over Firozpur Division./155-2025-26-ADEN-1-FZR/84751569 Ministry of Railways --

Note : For more details and clarifications, please refer to the respective Portal.