Central - Tenders Closing in 7 days

Total Tenders : 12066
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
11661. 21-Aug-2025 11:00 AM 08-Sep-2025 05:00 PM 09-Sep-2025 11:00 AM Construction of concrete protective roof at pit no. 03 and pit no. 04 in Kenda Seam of Jambad UG Colliery/GM/KAJ/PCD/25-26/4753 Date 13.08.2025/2025_ECL_341910_1 Eastern Coalfields Limited --
11662. 22-Jul-2025 11:00 AM 08-Sep-2025 05:00 PM 09-Sep-2025 11:00 AM Setting up of 875 MW Solar PV Plant on turnkey basis along with 02 (Two) years comprehensive operation and maintenance at RVUNL 2000 MW Solar Park at Pugal, District- Bikaner of Rajasthan/CIL/HQ/SOLAR/Raj/875/2025/11 Dated 21.07.2025/2025_CILHQ_340005_1 Coal India Limited icon image
11663. 26-Jun-2025 03:30 PM 08-Sep-2025 05:00 PM 09-Sep-2025 05:30 PM RFP for Selection of Acquirer Bank for Integrated FASTag ANPR based Multi Lane Free Flow (MLFF) User Fee Collection at Bijwasan and Panchgaon Fee Plaza/IHMCL/ MLFF-DWE /2025/2025_NHAI_239494_1 National Highways Authority of India icon image
11664. 15-Jul-2025 04:44 PM 08-Sep-2025 05:00 PM 08-Sep-2025 05:00 PM Design/Modification, Supply, Erection, Testing and Commissioning of 132kV/2X25 kV Scott connected Traction Sub Station and switching posts with AT including SCADA work between ET to KNW section of Bhopal Division of W C Railway to meet 3000MT loading target./BPL-PROJECT-EPC-2025-02/82777396 Ministry of Railways --
11665. 01-Sep-2025 04:30 PM 08-Sep-2025 05:00 PM 08-Sep-2025 05:30 PM 06/EESM(C)-I/KPD-I/2025-26/06/EESM(C)-I/KPD-I/2025-26/125328 Central Public Works Department (CPWD) --
11666. 28-Aug-2025 06:00 PM 08-Sep-2025 05:00 PM 09-Sep-2025 11:00 AM Repairing and strengthening of the weighment platform structure of Road Weigh bridge Make ORION installed at Churi Colliery, under Churi Project, NK Area/GM (NK)/EnM/e-NIT/2025-26/ 84/2025_CCL_342669_1 Central Coalfields Limited --
11667. 28-Aug-2025 06:00 PM 08-Sep-2025 05:00 PM 09-Sep-2025 10:00 AM Transportation and installation of 1000 GPM/100 mtr. Pump along with 150mm dia, 2500mtr. length pipe range and subsequent pump shifting 06 times for dewatering of Seam II Panel at Rani Atari UG Mine, RASA./SECL/GM/CHRM/EM/e-Tender/ 25-26/15 Dtd. 28.08.2025/2025_SECL_342637_1 South Eastern Coalfields Limited --
11668. 25-Aug-2025 06:55 PM 08-Sep-2025 05:00 PM 09-Sep-2025 11:00 AM Towards fabrication and fixing of 15 nos. channel structure with cushioning pads(3 numbers in each dumper) in 05 nos. BH60M dumpers (60019, 60020, 60031, 60032 and 60451) working at Lajkura OCP./LOCP/PO/EXCV/NIT/25-26/409/2025_MCL_342407_1 Mahanadi Coalfields Limited --
11669. 25-Aug-2025 06:55 PM 08-Sep-2025 05:00 PM 09-Sep-2025 11:00 AM Towards repairing of ceiling of operator cabin, operator seat repair and cleaning and painting of cabin of omega make PC11000 cranes Sl. Nos. 60791 and 90797 working at LOCP./LOCP/PO/EXCV/NIT/25-26/408/2025_MCL_342392_1 Mahanadi Coalfields Limited --
11670. 25-Aug-2025 05:30 PM 08-Sep-2025 05:00 PM 10-Sep-2025 11:00 AM Remedial measures for the Blackspot Locations, High Fatality Zone and Critical Crash Prone Locations in NH-544 from Km.102.035 to Km.144.680 and Km 170.880 to Km 183.010 of Chengapalli to Neelambur and Madukkarai to Walayar Section in the State of TN/NHAI/RO CHN/PIU CBE/ Road Safety works/NH-544/2025-26/005/2025_NHAI_246278_1 National Highways Authority of India --