Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
291. |
02-Aug-2025 10:00 AM |
16-Aug-2025 10:00 AM |
18-Aug-2025 10:00 AM |
Complete overhauling, repairing of 50 T cap. Digital make electronic road weighbridge by replacement of 04 nos. 34 Te, double ended share beam type load cell, 04 Nos. Mounting Yoke Shackle, and 04 nos. Mounting Pad Installed at Tapin North OCP unde/PE(EnM)/TNOCP/Tender/25-26/20/2025_CCL_340740_1 |
Central Coalfields Limited |
-- |
292. |
04-Aug-2025 06:00 PM |
16-Aug-2025 10:00 AM |
18-Aug-2025 10:00 AM |
Construction of Temple for Maa Bisramburi near Mohanpur OCP under Salanpur Area/SLN/GM/AE(C)/E-Tender/25-26/24 dt 04.08.2025/2025_ECL_340869_1 |
Eastern Coalfields Limited |
-- |
293. |
25-Jul-2025 10:00 AM |
16-Aug-2025 10:00 AM |
16-Aug-2025 11:00 AM |
Supply and Construction of Mechanical Door Closure and Repair of Avn Hangars/2962/RFP/25-26/17/OPW/2025_ARMY_722455_1 |
IHQ of MoD (Army)-(OSCC) |
 |
294. |
26-Jul-2025 04:00 PM |
16-Aug-2025 10:00 AM |
16-Aug-2025 10:30 AM |
Construction of Grazier Hut at Gen A Pemgarh, Tawang (Arunachal Pradesh)/2001/3/GSO (Op Sad) (i)/2025_ARMY_722804_1 |
IHQ of MoD (Army)-(OSCC) |
-- |
295. |
26-Jul-2025 04:00 PM |
16-Aug-2025 10:00 AM |
16-Aug-2025 10:30 AM |
Construction of Toilet Block at Bumla, Tawang (Arunachal Pradesh)/2001/3/GSO (Op Sad)/2025_ARMY_722780_1 |
IHQ of MoD (Army)-(OSCC) |
-- |
296. |
02-Aug-2025 10:00 AM |
16-Aug-2025 10:00 AM |
18-Aug-2025 10:00 AM |
Complete repairing and overhauling of damaged 11KV Grade, 630Amp, Sl.No.- 05-HMV-109, PCE make, outdoor type VCB used as buscoupler switch and 3.3 KV Grade, 400 Amp, Sl.No.-0111, Yule make, indoor type VCB used as controlling switch of Feeder II at T/PE(EnM)/TNOCP/Tender/25-26/21/2025_CCL_340741_1 |
Central Coalfields Limited |
-- |
297. |
14-Aug-2025 11:15 AM |
16-Aug-2025 10:30 AM |
16-Aug-2025 11:00 AM |
F9AYS00071- Fab and M/c of Motor Stool EN8H32/F9AYS00071- Fab and M/c of Motor Stool EN8H32/2025_BHEL_51793_1 |
Bharat Heavy Electricals Limited |
-- |
298. |
08-Aug-2025 07:14 PM |
16-Aug-2025 10:30 AM |
16-Aug-2025 11:00 AM |
57/AE(E) II/MUMBAI IV/2025-26/57/AE(E) II/MUMBAI IV/2025-26/122851 |
Central Public Works Department (CPWD) |
-- |
299. |
26-Jul-2025 06:00 PM |
16-Aug-2025 11:00 AM |
16-Aug-2025 11:30 AM |
AMC of addressable alarm system/GEM/2025/B/6481947/2025_IRELD_806839_1 |
Indian Rare Earths Limited |
-- |
300. |
26-Jul-2025 11:00 AM |
16-Aug-2025 11:00 AM |
16-Aug-2025 11:30 AM |
Dismantling of 3 by 110 MVAR Single phase 765 KV Line Reactor, shifting to new foundation and re erection, testing and commissioning as a Bus Reactor, at 765 KV Orai substation under POWERGRID NR III/NR3/NT/S-INSS/DOM/K00/25/09891/26110 |
Power Grid Corporation of India Limited |
-- |