Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
3101. |
28-Aug-2025 06:00 PM |
15-Sep-2025 09:00 AM |
15-Sep-2025 03:00 PM |
Mini ICOP/04/2025/2025_CBOC_810344_1 |
Central Bureau of Communication |
-- |
3102. |
05-Sep-2025 05:00 PM |
15-Sep-2025 09:00 AM |
16-Sep-2025 09:00 AM |
Diversion cum dismantling of 3.3KV OH electric line feeding power to the pump set installed at the A patch, w.r.t. Karo OCP, BnK Area/P.E. (EnM)/ Karo OCP/ e-tender/ 2025-26/ 32/2025_CCL_343320_1 |
Central Coalfields Limited |
-- |
3103. |
05-Sep-2025 05:00 PM |
15-Sep-2025 09:00 AM |
16-Sep-2025 09:00 AM |
Dismantling, cutting and laying of 8 inch dia M.S. Pipeline needed for diversion of the delivery pipeline of the two nos. of 2000 G.P.M. Pump Motor Sets, in the A Patch in Mine for developement of Haul road w.r.t. Karo OCP, under BnK Area/P.E. (EnM)/ Karo OCP/ e-tender/ 2025-26/ 33/2025_CCL_343325_1 |
Central Coalfields Limited |
-- |
3104. |
05-Sep-2025 06:00 PM |
15-Sep-2025 09:00 AM |
16-Sep-2025 10:00 AM |
Repairing and overhauling of LHS front axle assembly of Dumper Sl. NO. D-90105 Model BH-100 T at Kathara Colliery./PO/PE(Ex)/KTC/E-Tend/25-26/268 dt.05.09.25/2025_CCL_343311_2 |
Central Coalfields Limited |
-- |
3105. |
05-Sep-2025 05:00 PM |
15-Sep-2025 09:00 AM |
16-Sep-2025 09:00 AM |
Fencing of the boundary of the 11 kV/ 3.3 kV, Main Electric Substation and proper lighting arrangement around the boundary, at Karo OCP, under BnK Area/P.E. (EnM)/ Karo OCP/ e-tender/ 2025-26/ 34/2025_CCL_343329_1 |
Central Coalfields Limited |
-- |
3106. |
05-Sep-2025 03:00 PM |
15-Sep-2025 09:00 AM |
15-Sep-2025 09:15 AM |
SUPPLY AND CONSTRUCTION OF 01 X RELOC C2 CENTRE WITH MOBILE TOILET/4269/RFP/25-26/OP WKS (SUPPLY AND CONSTRUCTION)/2025_ARMY_729577_1 |
IHQ of MoD (Army)-(OSCC) |
-- |
3107. |
05-Sep-2025 06:00 PM |
15-Sep-2025 09:00 AM |
16-Sep-2025 10:00 AM |
Repairing and overhauling of LHS front axle assembly of Dumper Sl. NO. D-90105 Model BH-100 T at Kathara Colliery./PO/PE(Ex)/KTC/E-Tend/25-26/268 dt.05.09.25/2025_CCL_343311_1 |
Central Coalfields Limited |
-- |
3108. |
05-Sep-2025 06:00 PM |
15-Sep-2025 09:00 AM |
16-Sep-2025 10:00 AM |
Repairing of left hand side and right hand side rod assembly (big) of BH-100 Tonne Dumper Sl. NO. D-1212 (CIL No. 11112) at Kathara Colliery./PO/PE(Ex)/KTC/E-Tend/25-26/266 dt.05.09.25/2025_CCL_343308_1 |
Central Coalfields Limited |
-- |
3109. |
05-Sep-2025 06:00 PM |
15-Sep-2025 09:00 AM |
16-Sep-2025 10:00 AM |
Repairing of LHS sprocket, 02 nos. carrier rollers and LHS track guard of ZX-650 Tata Hitachi Sl. No. Exc-2912 of Kathara Colliery./PO/PE(Ex)/KTC/E-Tend/25-26/267 dt.05.09.25/2025_CCL_343309_1 |
Central Coalfields Limited |
-- |
3110. |
05-Sep-2025 06:00 PM |
15-Sep-2025 09:00 AM |
16-Sep-2025 10:00 AM |
(A) Repairing of hoist cylinder, swing cylinder and air line system of EKG-5A Shovel Sl. No. Exc-2859 (583) and (B) Repairing of track chain bolts of EKG-5A Shovel Sl. No. Exc-2859 and BE-195 Shovel Sl. No. Exc-1075 of Kathara Colliery./PO/PE(Ex)/KTC/E-Tend/25-26/264 dt.05.09.25/2025_CCL_343300_1 |
Central Coalfields Limited |
-- |