Central - Tenders Closing in 7 days

Total Tenders : 9923
Sl.No e-Published Date Bid Submission Closing Date Tender Opening Date Title/Ref.No./Tender Id State Name Corrigendum
8191. 23-Aug-2025 09:00 AM 02-Sep-2025 09:00 AM 03-Sep-2025 10:00 AM (A) Dismantling, Erection, repairing of 6.6KV SF No-1 power supply shovel M/C drill M/C and dragline M/C 9 seem of ABOCP (B) Dismantling Erection Diversion of 6.6 KV D/L feeder power supply Deco high well M/C and 4000 GPM pump Jocp Patch of ABOCP (C)/GM/B-II/AM (ENM)/E-TENDER/2025-26/095 dt 18.08.25/2025_BCCL_342190_1 Bharat Coking Coal Limited --
8192. 23-Aug-2025 09:00 AM 02-Sep-2025 09:00 AM 03-Sep-2025 10:00 AM Repairing of 4000 GPM pump 10UPH kirloskar make Pump No- SL.No - B-I/10UPH-8/4000 GPM/EnM/P4 at ABOCP Mine under Block-II Area/GM/B-II/AM (ENM)/E-TENDER/2025-26/094 dt 18.08.25/2025_BCCL_342188_1 Bharat Coking Coal Limited --
8193. 23-Aug-2025 09:00 AM 02-Sep-2025 09:00 AM 03-Sep-2025 10:00 AM Work of leakage repair in 16 inch dia pipeline form Jamunia water treatment plant to Washery Jungle to Saair Baandh to Harina Boosting and other Miscellaneous Work under JWTP Block II Area/GM/B-II/AM (ENM)/E-TENDER/2025-26/093 dt 18.08.25/2025_BCCL_342187_1 Bharat Coking Coal Limited --
8194. 23-Aug-2025 09:00 AM 02-Sep-2025 09:00 AM 03-Sep-2025 10:00 AM Work at electrical O/H Line 6.6KV, SAG Conductor re-tenting damaged conductor changing , dismantling and erection pipe poles and other work in kessurgarh Railway siding under ABOCP mine under Block-II Area/GM/B-II/AM (ENM)/E-TENDER/2025-26/092 dt 18.08.25/2025_BCCL_342183_1 Bharat Coking Coal Limited --
8195. 22-Aug-2025 06:00 PM 02-Sep-2025 09:00 AM 03-Sep-2025 09:00 AM Repairing of Bucket assembly, connecting rod and backhoe bucket controller of CK300 shovel sl. no. 764 deployed at Topa OCP, Kuju Area./GM(K)/Excv-61/25-26/T-58/2025_CCL_342185_1 Central Coalfields Limited --
8196. 23-Aug-2025 09:00 AM 02-Sep-2025 09:00 AM 03-Sep-2025 10:00 AM Work of Extension, Connection and Repairing 50mm dia GI pipeline from Harina sump to Expert hostel and D type Quarters at NNTS Under JWTP Block II Area./GM/B-II/AM (ENM)/E-TENDER/2025-26/091 dtd 18.08.25/2025_BCCL_342165_1 Bharat Coking Coal Limited --
8197. 23-Aug-2025 09:00 AM 02-Sep-2025 09:00 AM 03-Sep-2025 10:00 AM Supply and fitting of Gc10 gear coupling, belt conveyor at Nudhkurkee feeder breaker No. 03 of ABOCP mines under Block-II Area/GM/B-II/AM (ENM)/E-TENDER/2025-26/087 dt 18.08.25/2025_BCCL_342141_1 Bharat Coking Coal Limited --
8198. 23-Aug-2025 09:00 AM 02-Sep-2025 09:00 AM 03-Sep-2025 10:00 AM Dismantling of box pontoon shifting of pump-motor set along with diversion of delivery range and leakage repairing of different place of delivery range at jamunia patch of ABOCP mine/GM/B-II/AM (ENM)/E-TENDER/2025-26/086 dt 18.08.25/2025_BCCL_342137_1 Bharat Coking Coal Limited --
8199. 23-Aug-2025 09:00 AM 02-Sep-2025 09:00 AM 03-Sep-2025 10:00 AM Repairing and machining of 05 Nos, Take-up shaft for Kessurgarh and Nadkhurkee F/B at ABOCP Mine/GM/B-II/AM (ENM)/E-TENDER/2025-26/084 dt 18.08.25/2025_BCCL_342130_1 Bharat Coking Coal Limited --
8200. 23-Aug-2025 09:00 AM 02-Sep-2025 09:00 AM 03-Sep-2025 10:00 AM Leakage repair in 12in dia raw water pipeline from Jamunia dam to Dam Park and 16in dia raw water pipeline from dam park to Jamunia water treatment plant under JWTP Block Area/GM/B-II/AM (ENM)/E-TENDER/2025-26/090 dt 18.08.25/2025_BCCL_342155_1 Bharat Coking Coal Limited --