| Sl.No |
e-Published Date |
Bid Submission Closing Date |
Tender Opening Date |
Title/Ref.No./Tender Id |
State Name |
Corrigendum |
| 12831. |
18-Aug-2026 05:00 PM |
28-Aug-2026 05:00 PM |
29-Aug-2026 05:00 PM |
Rewinding of Andrew Yule make, 315KVA, 3.3KV-550V TSU transformer at Chora 7n9 Pit Colliery/GM/KND/AE(ENM)/55(TN)/26-27/47/2026_ECL_363942_1 |
Eastern Coalfields Limited |
-- |
| 12832. |
18-Aug-2026 05:00 PM |
28-Aug-2026 05:00 PM |
29-Aug-2026 10:00 AM |
Repairing of final drive, take up axle and steel sleeves and Replacing wiring of AC Panel and DC Panel of EKG 5A Shovel Sl. No. 582 of Gidi-A Colliery./SO(X)(A)/e-NIT/31/26-27/81/2026_CCL_363960_1 |
Central Coalfields Limited |
-- |
| 12833. |
18-Aug-2026 05:00 PM |
28-Aug-2026 05:00 PM |
29-Aug-2026 05:00 PM |
AS/NH17/OTI/S-B/26-27/1/AS/NH17/OTI/S-B/26-27/1/2026_NHIDC_922605_1 |
National Highways and Infrastructure Development Corporation |
-- |
| 12834. |
07-Aug-2026 05:30 PM |
28-Aug-2026 05:00 PM |
28-Aug-2026 05:30 PM |
ALLOTMENT OF PORT LAND MEASURING 4.5 ACRES AT MADHUBAN, PARADIP FOR A PERIOD OF 30 YEARS ON LEASE BASIS FOR THE PURPOSE FOR RUNNING A SCHOOL/AD/EST/LAND-I-74/2025/2491/2026_MoS_921175_1 |
Ministry of Shipping |
-- |
| 12835. |
18-Aug-2026 05:00 PM |
28-Aug-2026 05:00 PM |
29-Aug-2026 05:00 PM |
Rewinding of GEC make, 315KVA, 3.3KV-550V TSU along with primary and secondary switch at NJ unit of Bahula Colliery/GM/KND/AE(ENM)/55(TN)/26-27/48/2026_ECL_363943_1 |
Eastern Coalfields Limited |
-- |
| 12836. |
18-Aug-2026 10:00 AM |
28-Aug-2026 05:00 PM |
29-Aug-2026 11:00 AM |
Repairing and Maintenance of Community Centres located at different locations under Lodna Area/BCCL/LA/CIVIL/e NIT/2026-27/ 13/2026_BCCL_363790_1 |
Bharat Coking Coal Limited |
-- |
| 12837. |
18-Aug-2026 05:00 PM |
28-Aug-2026 05:00 PM |
29-Aug-2026 05:00 PM |
Supply and Installation of insulated mat in electrical substations in Chora Block Incline Colliery/GM/KND/AE(ENM)/55(TN)/26-27/50/2026_ECL_363946_1 |
Eastern Coalfields Limited |
-- |
| 12838. |
18-Aug-2026 05:00 PM |
28-Aug-2026 05:00 PM |
31-Aug-2026 05:00 PM |
Package.No.AP04PIV-VNP01 L021 CV road to Ankireddypalli in V N Palli Mandal/NIT No.157/2026-27, Dt.07.08.2026 of the Engineer-In-Chief, PR, PMGSY, Vijayawada (1st Call)/2026_ENCPR_149244_1 |
National Rural Roads Development Agency (NRRDA) |
-- |
| 12839. |
18-Aug-2026 05:00 PM |
28-Aug-2026 05:00 PM |
31-Aug-2026 05:00 PM |
Package.No.AP04PIVPLM02 T01 CP road at KM 28.8 to Bareddypalli via Meenaiahgaripalli in Pendlimarri Mandal/NIT No.154/2026-27, Dt.07.08.2026 of the Engineer-In-Chief, PR, PMGSY, Vijayawada (1st Call)/2026_ENCPR_149242_1 |
National Rural Roads Development Agency (NRRDA) |
-- |
| 12840. |
07-Aug-2026 05:00 PM |
28-Aug-2026 05:00 PM |
29-Aug-2026 11:00 AM |
Permanent restoration of road from Chandak to Dalan by way of protection Work and other allied works Under Package No.JK11-181 Block NSSB ,District Poonch Length-7.40 kms/SE/PMGSY/J/34 of 2026-27 dated 07.08.2026/2026_JKRRD_148929_4 |
National Rural Roads Development Agency (NRRDA) |
 |